ML20011F343
| ML20011F343 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 02/21/1990 |
| From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20011F344 | List: |
| References | |
| NUDOCS 9003050174 | |
| Download: ML20011F343 (3) | |
See also: IR 05000352/1988099
Text
{{#Wiki_filter:1 , , , , -- lb pph%. is j ' ,
- # 1,e
' ' FEB 211990 ' , , n t Docket Nos. 50-352/NPF-39- 50-353/NPF-85 Philadelphia Electric Company ' ~ ATTN: Mr. C. A. McNeill, Jr. Executive Vice President-Nuclear - Nuclear Group Headquarters ~ Correspondence Control Desk
- P.O. Box 195
' Wayne, Pennsylvania - 19087-0195 GentlAmen: Subject: Systematic Assessment of Licensee Performance.(SALP) Final Report > Number 50-352/88-99; 50-353/88-99 This letter forwards the final Limerick Generating Station, Uni',s 1 and 2,
, -SALP Report (Enclosure 1) for-the period May 1, 1988 through August 31, 1989.. . The.SALP Board' Report was initially forwarded to you by our December '1,1989~ , . letter (Enclosure 2):and was discussed with you and your staff at a management meeting on December 21, 1989, at your Visitor Center in Limerick, Pennsylvania (see Enclosure 3 for rrceting attendees). We-have reviewed your January-10,1990 written comments (Enclosure 4) and . noted that you concurred with our overall assessment. Based on this review and the discussions at the SALP management _ meeting, we have concluded that no substantive changes to' the original SALP Board Report were necessary. One . ' editorial change was made. Our assessment concluded that overall site performance remained. strong during . this SALP period. Effective site management and a resultant team effort on the part'of station personnel allowed Unit 1.to continue its excellent operational record while completing construction and initial startup of Uriit 2 , in-an equally high quality manner. .As discussed.during the December 21, 1989 meeting and in your written comments, we acknowledge that corrective actions are underway to strengthen performance .in the areas of Emergency Preparedness and Engineering / Technical Support. It .. appears that you are applying appropriate management attention towards correcting . the weaknesses in .these areas identified in the SALP Report. No reply.to this letter is required. Your actions in response to the NRC Systematic Assessment of Licensee Performance will be reviewed during future inspections of your facility. OFFICIAL RECORD COPY LIM SALP 88-99 - 0001.0.0 \\ 02/15/90 g 9003050174 90 221 % , -{DR ADOCK 05 00352 [ J DC ..
- ' 'j . .
a.m = 1.J FEB 211990 ' Philadelphia Electric Company'. 2 y We appreciate your cooperation. Sincerely, Or'iginal Signoa By EILLIMI T. IiUSSELL .; William T. Russell Regional Administrator , Enclosures: . ' 1. Systematic Assessment of Licensee Performance Report Number 50-352/88-99; i 50-353/88-99 ' 2. Letter, NRC to C. A. McNeill dated December 1, 1989 transmitting the SALP- Board Report 3. Attendees at-December 21, 1989 Limerick SALP Management Meeting December 1, < 1989 " 4. - Letter, PEco to NRC dated January'10, 1990 transmitting written comments cc w/encis: . . R.- J. Lees, Chairman, Nuclear Review Board -G. M. Leitch, Vice President - Limerick Generating' Station D. R.-Helwig, Vice President - Nuclear Services . S. J. Kowalski, Vice President.- Nuclear Engineering J. W. Durham, Sr., Vice President and General Council- M. J. McCormick, Jr. , Manager - Limerick Generating Station G. A. Hunger, Jr. , Director - Licensing Section J. Doerinq, Project Manager - Limerick Generating Station J. F. O'Rourke, Manager - Limerick Quality Division .T. B. Conner .Jr., Esquire G. J. Madsen,. Regulatory Engineer - Limerick Generating' Station K. Abraham, PAO (19) Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) Commonwealth of. Pennsylvania Chairman Carr Commissioner Roberts Commissioner Rogers Commissioner Curtiss Commissioner Remick 0FFICIAL RECORD COPY LIM SALP 88-99 - 0002.0.0 02/09/90 - - - - - - -
p' ., , , di$ ,"M , '
a , , (. "7; ;, : ' , , , 'Ph11ad.+lphia Electric Company '3 ,; ggg i '
- i.
bec w/encis:' c Region I Docket. Room'(with concurrences) . .-Management Assistant, DRMA (w/o enc 1)- !
- Section Chief, DRP-
' ~i W.- Hodges,' DRS - .M.- Knapp, DRSS. 'J. Taylor, EDO '
- W. Russell.
T. Martin ~ D. Holody' J. Lieberman, OE- J. Dyer, ED0- Management Meeting Attendees M.; ' Conner - .; E .; } .. , 1 7- %#y WW I. -f I:DRP . RI:DRP I:DRP l}I1: P R :D A RI:RA ' Doerflein/rhl Blough Wiggins (an Ma in Russell 02/9 /90: 02/[/90 02/ ,/90 02/9 /90 02 90 02/2=/90 0FFICIAL RECORD COPY LIM SALP 88-99 - 0002.1.0 02/09/90
- )
- - - - - - - }}