FEB 151990
,
LIn Reply Refer To:
Dockets: 50-313/90-03
50-368/90-03
,
.
1
Arkansas Power & Licht Company
ATTH: GenaCampbell,VicePresident
1
Nuclear Operations
P.O. Box _551
Little Rock, Arkansas 72203
Gentlemen:
,
t
This refers to the inspection conducted by Mr. R. C. Stewart of this office
during the period January 8-12,1990, of activities authorized by NRC Operating
,
, ,
Licenses-DPR-51 and HPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion of our findings with Mr. N. S. Carns and other members of your
'
staff at the conclusion of the inspection.
The area examined during the inspection-consisted of a review of the status of
the Units 1 and 2 inservice testing programs for pumps and valves with respect
to conformance to the staff positions contained in Generic Letter 89-04. Within
'this area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspector. The inspection findings are documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
, paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By:
Samuel J. Coilins
Samuel J. Collins, Director
Division of Reactor Projects
>'
Enclosure:
(seenextpage)
RIV:MQPS *
HQPS *'
D:DRS * $n3
C
RStewart:nh
IBarnes
LOCa11a
4
ins
/ /90
/ /90
/ /90
/0 /90
- previously concurred
9003020181 900215
)
gDR
ADOCK05oog3
g,
g
E
- .-
<
>
'
- Arkansas Power & Light' Comp'any
-2-
Enclosure:
Appendix - NRC Inspection Report
50-313/90-03
50-368/90-03
cc w/ enclosure: .
Arkansas Nuclear One
ATTN: Early Ewing, General Manager
Technical Support and Assessment
P.O.' Box 608
Russellville, Arkansas 72801
Arkansas Nuclear One
ATTH: Neil Carns, Director
,
Nuclear Operations
P.O. Box 608-
Russellville. . Arkansas 72801
Combustion, Engineering, Inc.
ATTH: -Charlos'B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville . Maryland 20852
Honorable Joe W. Phillips
, County Judge of Pope County
' Pope County Courthouse
,
-Russellville, Arkansas 72801
Bishop,' Cook, Purcell & Reynolds
. ATTN: Nicholas S. Reynolds, Esq.
,1400 L Street, N.W.
Washington, D.C.
20005-3502
s
ATTN: Ms. Greta Dieus Director
Division of Environmental Health
Protection
'4815 West Markam Street
Little Rock, Arkansas 72201
. Babcock & Wilcox
'
Nuclear Power Generation Division
. ATTN: Mr. Robert B. Borsum
1700 Rockville Pike, Suite 525
- Rockville, Maryland 20852
.
k
y
a
'
r, ; ;y.
-
,
.l/
ll:
'
+
j[ '
Arkansas Power & Light Company
-3
o
,
y
.
.'
.
.'U.S. Nuclear Regulatory Commission
yx-
~ ",
ATTN: Senior. Resident Inspector
.,
1 Nuclear Plant Road
Russellyille, Arkansas' 72801
'
s
i?
,
B
'
U.S'..' Nuclear Regulatory Commission
ATTN:.. Regional Administrator, Region IV
p
,
,
14
611 Ryan Plaza Drive, Suite 1000
,.
,
Ar,lington, Texas 76011
'
L
7 ;
,.
-
f
bec'to'DMB(IE01)
>
-
' . . . ,
'
bec distrib. by RIV:
E
D
- R. D. Martin
- Resident Inspector
F.
- DRSS-FRPS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF-
- RIV File
- DRP
- MIS System
<
- RSTS Operator
- ProjectEngineer(DRP/A)
<
.*DRS "
- TrAlexion',NRRProjectManager(MS: 13-E21)
L
J*C. Poslusny, NRR Project Manager (MS:
13-D-18)
- R. Stewart
- I. Barnes
- w/766:
)
i.i
iL
'
,
)
I (
I
I!
K
L
l
I-
.
.
. . . .
. .
. .
-
.
_ , _ -
.