Forwards Insp Repts 50-313/90-03 & 50-368/90-03 on 900108-12.No Violations or Deviations Noted
ML20011F231
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/15/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20011F232 List:
References
NUDOCS 9003020181
Download: ML20011F231 (3)


See also: IR 05000313/1990003

Text

,f

y

"

FEB 151990

,

LIn Reply Refer To:

Dockets: 50-313/90-03

50-368/90-03

,

.

1

Arkansas Power & Licht Company

ATTH: GenaCampbell,VicePresident

1

Nuclear Operations

P.O. Box _551

Little Rock, Arkansas 72203

Gentlemen:

,

t

This refers to the inspection conducted by Mr. R. C. Stewart of this office

during the period January 8-12,1990, of activities authorized by NRC Operating

,

, ,

Licenses-DPR-51 and HPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the

discussion of our findings with Mr. N. S. Carns and other members of your

'

staff at the conclusion of the inspection.

The area examined during the inspection-consisted of a review of the status of

the Units 1 and 2 inservice testing programs for pumps and valves with respect

to conformance to the staff positions contained in Generic Letter 89-04. Within

'this area, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. The inspection findings are documented in the enclosed inspection

report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

, paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By:

Samuel J. Coilins

Samuel J. Collins, Director

Division of Reactor Projects

>'

Enclosure:

(seenextpage)

RIV:MQPS *

HQPS *'

D:DRS * $n3

C

RStewart:nh

IBarnes

LOCa11a

4

ins

/ /90

/ /90

/ /90

/0 /90

  • previously concurred

9003020181 900215

)

gDR

ADOCK05oog3

g,

g

E

.-

<

>

'

- Arkansas Power & Light' Comp'any

-2-

Enclosure:

Appendix - NRC Inspection Report

50-313/90-03

50-368/90-03

cc w/ enclosure: .

Arkansas Nuclear One

ATTN: Early Ewing, General Manager

Technical Support and Assessment

P.O.' Box 608

Russellville, Arkansas 72801

Arkansas Nuclear One

ATTH: Neil Carns, Director

,

Nuclear Operations

P.O. Box 608-

Russellville. . Arkansas 72801

Combustion, Engineering, Inc.

ATTH: -Charlos'B. Brinkman, Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville . Maryland 20852

Honorable Joe W. Phillips

, County Judge of Pope County

' Pope County Courthouse

,

-Russellville, Arkansas 72801

Bishop,' Cook, Purcell & Reynolds

. ATTN: Nicholas S. Reynolds, Esq.

,1400 L Street, N.W.

Washington, D.C.

20005-3502

Arkansas Department of Health

s

ATTN: Ms. Greta Dieus Director

Division of Environmental Health

Protection

'4815 West Markam Street

Little Rock, Arkansas 72201

. Babcock & Wilcox

'

Nuclear Power Generation Division

. ATTN: Mr. Robert B. Borsum

1700 Rockville Pike, Suite 525

- Rockville, Maryland 20852

.

k

y

a

'

r, ; ;y.

-

,

.l/

ll:

'

+

j[ '

Arkansas Power & Light Company

-3

o

,

y

.

.'

.

.'U.S. Nuclear Regulatory Commission

yx-

~ ",

ATTN: Senior. Resident Inspector

.,

1 Nuclear Plant Road

Russellyille, Arkansas' 72801

'

s

i?

,

B

'

U.S'..' Nuclear Regulatory Commission

ATTN:.. Regional Administrator, Region IV

p

,

,

14

611 Ryan Plaza Drive, Suite 1000

,.

,

Ar,lington, Texas 76011

'

L

7 ;

,.

-

f

bec'to'DMB(IE01)

>

-

' . . . ,

'

bec distrib. by RIV:

E

D

  • R. D. Martin
  • Resident Inspector

F.

  • DRSS-FRPS
  • SectionChief(DRP/A)

Lisa Shea, RM/ALF-

  • RIV File

- DRP

  • MIS System

<

  • RSTS Operator
  • ProjectEngineer(DRP/A)

<

.*DRS "

  • TrAlexion',NRRProjectManager(MS: 13-E21)

L

J*C. Poslusny, NRR Project Manager (MS:

13-D-18)

  • R. Stewart
  • I. Barnes
  • w/766:

)

i.i

iL

'

,

)

I (

I

I!

K

L

l

I-

.

.

. . . .

. .

. .

-

.

_ , _ -

.