Confirms That Util Completed Removal of Normally Energized Dc Relays During 1989 Outage,Per NRC Bulletin 84-02. Schedule for Replacement of Remaining Normally Deenergized Dc Hfa Relays Acceptable
ML20011E766
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/02/1990
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
IEB-84-02, IEB-84-2, NUDOCS 9002220411
Download: ML20011E766 (3)


Text

)

m February 2,1990

'".*,.4 l

w Docket No,'50 298 Mr. George A. Trevers, Divisten

. Manager. Nuclear Support Nebraska Public Power District Post Office Box 499 i

Coluntaus, Nebraska CE601 0499 Dear Mr. Trevers.

SUBJECT:

COMPLETION OF THE NRC staff'S REVIEW 0F NEBRASKA PUBLIC POWER DISTRICT'S RESPONSES TO BULLETIN 84 02 The NRC staff has corpleted their review of the Nebraska Public Power District's (NPPD) responses to Eu11etin 84 02 dated July 16, 1984, October 9, 1984, and June 29, 1988.

In your responses you have confirmed that you have replaced all 120 VAC safety.related HfA relays and that you planned to replace all norra11y energized DC safety.relatted HrA relays during the 1989 refueling outage. You also stated that you have determined that the rtmaining normally de-enerigired DC safety.related relays will perform acceptably for at least five years from the 1988 confirmatory tests carried out by General Electric.

Based on those tests NPPD indicated that the remaining nornally de.cnergized DC safety.related relays would be replaced within five years.

I have confirmed through discussions with members of your staff that NPPD did completc the removal of the normally energized DC relays during the 1989 outage.

We conclude that your response to Bulletin 84 02, including your schedule for the replacement of the remaining normcily de. energized DC HFA relays is acceptable. The staff may, at a future date, inspect the actions that NPPD has scheduled to complete the implementation of this bulletin.

This completes the staff's action on Bulletin 84 02.

Sincerely,

/s/

Paul W. O'Connor, Project Manager Project Directorate IV Divisien of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation ec: See next page DISTRIBUTION

% poetet T11e m S NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 F. Hebdon P. Noonan P. O'Connor OGC-Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P.315 PD4 Plant File G. Cwalina L. Constable, RIV W. R. Bennett UR~'IPD4/LA Q)4...:.......

PD4/D s

~

.....:......f... g :PD4/PM~

..:.. 4.....:............:............:............:.........

NAME :PNoonan

P0'Connor:bj:FHebdon DATE :02/C /90
02/A/90
02/rf/90 u. _...... _.____

=.7

[h 0FF]CIAL RECORD COPY Document Name: COOPER LTR/ BULLETIN 9002220411 900202 PDR ADOCK 05000298 h

.o.

.PNU.

,o

..\\.

. ~

i j

FJ+c 1

3 f*, %\\

UNITED 8TATEs p,

[

NUCLEAR REGULATORY COMMISSION n

k

  • e.+ + )[

-g wAswiwotow, p. c. rossa February 2,1990 p

I Docket No. 50-298 l-ti l

Mr.' George A. Trevors, Division

)

Manager - Nuclear. Support 1

Nebraska Public Power District j

Post Office Box 499 l

Columbus, Nebraska 68601-0499

Dear Mr. Trevers:

j i

SUBJECT:

COMPLETION OF THE NRC STAFF'S REVIEW 0F NEBRASKA PUBLIC POWER DISTPICT'S RESPONSES TO BULLETIN 84-02 j

The NRC staff'has completed their review'of the Nebraska Public Power District's-(NPPD)-responses to Eulletin 84-02 dated July 16, 1984, October 9, 1984, and i

June. 29,1988.

In your responses you have confirmed that you have replaced all 120 VAC safety-related HFA. relays and that you planned to replace all ncrmally energized DC safety-related HFA relays during the 1989 refueling-outage.- You also stated that you have determined that the remaining normally l

de-enerigized DC safety _related relays will perform acceptably for at least five years from the 1988 confirmatory tests carried out by General Electric.

Based on those tests NPPD indicated that the remaining normally de-energized DC safety-related relays would be replaced within five years.

l

! have confirmed through discussions with members of your staff that NPPD did complete the removal of the normally energized DC relays during the 1989-outage.

1 We conclude that your response to Bulletin 84-02, including your schedule for the replacenent of the remaining normally de-energized DC HFA relays is acceptable. The staff may, at a future date, inspect the actions that NPPD has scheduled to complete the implementation of this bulletin. This completes the staff's action on'Bulletin 84-02.

4 Sincerely, LLD.&

Paul W. O'Connor, Project Manager Project Directorate IV i

Division of Reactor Projects - III, IV, V and Special Projects Office 01 Nuclear Reactor Regulation e

cc: See next page

__,._.4-.

m

m,.

,3e L

Mr. George A. Trevors

= Nebraska Public Power District Cooper Nuclear Station cc:

i Mr. G. D. Watson General Counsel.

L Nebraska Publie Power District i

P. O. Box 499 L

Colunt>us, Nebraska 68601 Cooper Nuclear Station ATTN:'-Mr. Guy R. Horn Division 0

Manager of Nuclear Operations P.-O. Box 98 Brownville, Nebraska 68321 t-Dennis Grams, Director Nebraska Departrent of Environmental Control o

P. O. Box 9892?'

i Lincoln, Nebraska 68509-8922 Mr. Larry Bohlken, Chairun

Nemaha County Board of Comissioners l

'Nen.aha County Courthouse

.1824 M Street Auburn, Nebraska 68305

-Senior Resident-Inspector U.S. l'uclear Regulatory Comission P. O. Box 218 Brownville, Nebraska 68321 Regional Aoministrator, Region IV

[

U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas - 76011 Mr.' Harold Borchart, Director Division of Radiological Health Department-of flealth a

l301' Centennial Mall, South l

l' P. O. Box 95007 Lincoln, Nebraska 68509-5007 n

4 I'

l I

l a

1

.