Summarizes Plant Periodic Performance Meeting on 900119 at Site Re Activities Authorized by Licenses DPR-51 & NPF-6. Meeting Beneficial & Provided Better Understanding of Ongoing Organizational Changes at Plant.W/Summary & Slides
ML20011E760
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/12/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 9002220391
Download: ML20011E760 (60)


Text

>_

o-

. ;.n1 f'

4

/

FEE I 212

-In Reply Refer To:

Dockets: 50-313 50-368 Arkansas Power & Light Company ATTN: ; Gene Campbell, Vice President

- Nuclear Operations

-P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

- This refers to the Arkansas Nuclear One (ANO) Periodic Performance Meeting conducted at your request at the ANO site on January 19, 1990. This meeting related to activities authorized by-NRC License Nos. DPR-51 and NPF-6 for ANO and was attereded by those on the Attendance List (attachment to the Meeting y

Summary). The subjects discussed at this meeting are described in the enclosed Meeting Sumury.

It is our opinion that this meetinn was beneficial and has provided a better understantting of the ongoing organizational changes at ANO as well as the ongoing and planned major activities within the ANO departments.

in accordance with Section 2.790 of the NRC's " Rules of Practice " Part 2 Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely.

ORICliRL SIGNED BY Sf. MULL j 00LllNS Samuel J. Collins, Director Division of Reactor Projects

Enclosure:

Meeting Summary w/ attachments cc w/ enclosure:

Arkansas Nuclear One ATTN:

Early Ewing, General Manager Technical Support and Assessment P.O. Box 608 Russellville Arkansas 72801 RIV:DRP/Ad CfDRP/A Dr ATHowell;df DDChamberlain S.

2/f/90 2/9/90 2/

hh khkk h

13 PDC p

r Arkansas Pmeer & Light Company [

Arkansas Nuclear Ore ATTN: Neil Carns. Director Nuclear Operations P.O. Box 608 Russellville, Arkansas 72801 Combuction Engineering, Inc.

ATTN:' Charles B. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway Suite 330 Rockville, Maryland 20852 Honorable Joe W. Phillips County Judge of Pope. County Pope County Courthouse Russellville, Arkansas 72801 Bishop, Cook, Purcell & Reynolds ATTN: Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Arkansas Department of Health ATTN: Ms. Greta Dicus, Director Division of Environmental Health Protection 4815 West Markam Street Little Rock, Arkansas 72201 Babe,ck & Wilcox Nuclear Power Generation Division ATTN: Mr. Robert B. Borsum 1700 Rockville Pike, Suite 525 L

Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission ATTN: Senior Resident Inspector L

1 Nuclear Plant Road Russellville, Arkansas 72801 U.S. Nuclear Regulatory Commission ATTN: Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 bectoDMB(IE45) bec distrib. by RIV:

R. D.-Martin Resident Inspector DRSS-FRPS SectionChief(DRP/A)

Lisa'Shea,RM/ALF RIV File Project Engineer (DRP/A)

DRP JT.; Alexion, NRR Project Manager (MS:

13-E21)

DRS C. Posiusny, NRR Project Manager (MS: 13-D-18)

n (C'

ANO PERIODIC PERFORMANCE MEETING $UMMARY Licensee:

Arkansas Power & Light Company (AP&L)

Facility:

Arkansas Nuclear One License Nos.:

DPR-51; NPF-6 L

Docket Nos.:

50-313; 50-368

Subject:

PERIODIC PERFORMANCE MEETING On January 19, 1990, the Regional Administrator and selected members of the i

NRC Region IV staff met with representatives of AP&L to discuss the ongoing organizational changes at ANO and the saajor activities in each of the ANO departnents. A copy of the licensee presentation is attached.

Attechments:

1. Attendance List 2.

Licensee Presentation (NRC distribution only) t i

1 1

l l

j

O i

ATTENDANCE LIST Attendance at the Periodic Performance Meeting between AP&L and NRC on January 19, 1990, at the ANO site was as follows:

1 A,P&L D. C. Hintz, Senior Vice President, Nuclear T. G. Campbell, Vice President Nuclear W. T. Craddock, General Manager, Nuclear Support E. C. Ewing, General Manager, Technical Support & Assessment G. T. Jones, General Manager, Engineering L. W. Humphrey, General Manager, Nuclear Quality S. J. McWilliams Executive Assistant to the Director of Nuclear Operations J. J. Fisicaro, Manager, Licensing R.N. Johannes,ProjectManager, Outages (Unit 1)

R. A. Fenech, Plant Manager, Unit 2 C. L. Tyrone Project Manager, Materials R. J. King, Supervisor, Plant Licen'ing J. D. Jacks, Nuclear Safety & Licensing Specialist R. Vogt-Lowell, Excel Consultant NRC t

R. D. Martin,= Regional Administrator S. J. Collins, Director, Division of Reactor Projects (DRP)

L. J. Callan, Director Division of Reactor Safety L. A. Yandell, Deputy Director Division of Radiation Safety and Safeguards D. D. Chamberlain Chief, Project Section A, DRP C. C. Warren Senior Resident Inspector, Project Section A, DRP R. C. Haag, Resident Inspector, Project Section A DRP J. T. Gilliland, Public Affairs Officer NRC Office of Nuclear Reactor Regulation F. J. Hebdon, Director, Project Directorate IV C. Poslusny, Licensing Project Manager ANO, Unit 2

>c.,.

4 kl ANO PFRFORMANCE MEETING JANUARY 19,1990 l

l

.e l

PERFORMANCE MEETING AGENDA INTRODUCTORY REMARKS T. G. CAMPBELL l

SUMMARY

OF UNIT OUTAGES I

UNIT 2 REFUELING 2R7 R. A.FENECH l

UNIT 1 MIDCYCLE 1M89 J. D. VANDERGRIFT 1

ANO BUSINESS PLAN OVERVIEW W. T. CRADDOCK

+

DISCUSSIONS OF RESULTS/NEAR N. S. CARNS e

. TERM PLANS BY MAJOR G. T. JONES DEPARTMENT HEADS E. C. EWING l

L. W. HUMPHREY W. T CRADDOCK C.L.TYRONE CLOSING REMARKS T. G. CAMPBELL l.

l

i t

5 i

ORGANIZATIONAL REALIGNMENT OBJECTIVES t

IMPROVE SUPPORT FOR SAFE OPERATION UNIT SPECIFIC TECHNICAL AND MAINTENANCE SUPPORT WORKLOAD BALANCING CONSOLIDATE ADMINISTRATIVE SUPPORT ELEVATE MATERIALS MANAGEMENT 9

4

._,,-..w..y

6 ARKANSAS NUCLEAR ONE vice e,csiacnt FEBRUARY 1,1990 Ni: Clear G. Carnpbell Malariots SRC Ex ec utive Monogament Assistant J. Grisham I

I I

I General Monogw Technecol Support c,n,rol Monoger Director Cenwol Wonoger General Monoger Nuclear Support Nuclear Operofions Engineering Nuclear Oveldy I

B. Croddock

8. Corns G. Jones L Humphrey E no E

e

  1. 85'*9 Worieger Nuclear soff h8ea*9*'

8 f

E.cuti.e.

W touclear Operoffens e

teoch/ Civil /

04 K

e y

g N,

-PSC

f. _ _

EU"

Wonoger l

e a,so 8

E8('"S'"9 Conwnonicof8 ens Plant Plord g

- Pled Elwerkot/

Ot/OC J. riskoro ggg p,,3,

9

)' y

. p, s

A. Wrope J. V a i. 7 "--

A. Sessoms R.Fenech g

Monoger psang

- T,chnscot Asst.

I W

^Em Centrefter T. 9,Aer l

E, p

E. Force

""**F"'

3 Protect Actsag w neger 8

Prol"'

R E*"*

o te noger

- Cen8ce, 8

Monoger c

Oefogos Seppert 7

Oe8egn

    • asonoge'

^ ^'

88' N 8$

S* curer

  • him O' #*

J'

~ --

,s

- k8ew

$,,g.,

--m H. Hoeis Design gean,9, s

Q C. T Operations Chemistry &

5 C,-....

that t Rod Chem 8

U"88 2 tecnogy C. Zensutate4N R. CNlesple I

I Ed'"G 98 880909er t,

8 Off8ce Serv 8ces

~

e.e 9* DAY J. Dowls 8 888'"

as,,,g, te,,,ger tfonoger

~

Red Preewfson

_f 8888'd"'ence

& Rodeose, UnN 2

  • uenoger Harnon Resources ran..ae
t. ski,ee
x. Cooses toene,or Unst j

J. tsartero J

88'

_ Engineering SW y

w R

N*"

28elntanonce System Eng.

Erigineering thalt 2 tvig.

E "'

& Anedysis r

A. Cow W*

C. Don.oroge Work 3#8'ory R. Wewers

  • (Report to eof Corp felle=Irig consolldcHen)
    • (Transfer to fewclear OpereHons Jon.199 f) 4.

C of

      • WHI 6ecorne 8hN 1 OperoNons Isonoger in Sepleevamr 1990.

l

[

4 FUNCTIONAL ORGANIZATION CHART VICE PRESIDENT NUCLEAR i

MATERIAL MANAGEMENT

- MATERIAL MANAGEMENT

(

i t

t b

DIRECTOR NUCLEAR OPERATIONS I

- OPERATIONS & RAAINTENANCE

- TECHNICALSUPPORT GENERAL SAP 90AGER GENEPAL RAANAGER OENERAL RAANAGER HEALTH PHYSICS

& ASSESSRAEffT o INDUSTRIALSAFETY N

NUCMAR SUPPORT NUCLEAR QUAUTY o OPSTECH SUPPORT

- QUAUTY

- ASSESSRAENT

- DESIGN ENGSEERW89

- HURBAff pIESOURCES

- REQUIATORY AFFAIRS AND RIODFICATIONS

- RAANAGERAENTSYSTERAS

- TRAIIGNG & EMERGENCY AND RESOURCES i

PLAlepageG

- ADRWISUPPOITT

- TECHp01CALSUPPORT

- SPECIALERAPNASIS N

o SECURITY 4

h

t i

ANO 3-YEAR OBJECTIVE l

BECOME AND BE RECOGNIZED AS A WORLD CLASS NUCLEAR OPERATIONS FACILITY.

i i

TARGETING SUSTAINED IMPROVEMENTS IN SAFETY' AND PERFORMANCE PARAMETERS.

i i

1 l

l

t m

i i

1 i

h t

-s UNIT 2 r'

l REFUELING OUTAGE 2R7 l '

h l

i it

~,

,#.,1~.-.~~..,.

..m.,..

m...,

l l

REFUELING OUTAGE 2R7 OBJECTIVES DEFINE WORKSCOPE

- PREVENTIVE MAINTENANCE l

- CORRECTIVE MAINTENANCE

- MODIFICATIONS IDENTIFY & SCHEDULE EMERGENT WORK COMPLETE WORK CORRECTLY THE FIRST TIME COMPLETE ORIGINAL & EMERGENT WORK ON SCHEDULE, SAFELY AND WITHIN ALARA GOALS e

i i

l I

1 m

,.n,%n,_-

j REFUELING OUTAGE 2R7 ACCOMPLISHMENTS i

l JOB ORDERS 4107 SCHEDULED 1577 EMERGENT 5684 TOTAL i

5497 COMPLETED FORTY (40) DESIGN CHANGES / MODIFICATIONS l

CORRECTIVE MAINTENANCE ON 200 VALVES L

DURING 3 REDUCED INVENTORY WINDOWS TURBINE OVERHAUL INCLUDING ROTOR REPLACEMENT

)

UNIT STARTUP WITH NO SIGNIFICANT LEAKS OR EQUIPMENT FAILURES i

ALARA l

ORIGINAL GOAL 308 MAN REM REVISED GOAL 275 MAN REM ACTUAL 282 MAN REM (20 MAN REM DUE TO ADDED SCOPE) l PCE GOAL 270 ACTUAL-266 OUTAGE DURATION SCHEDULED 58 DAYS 10 HOURS ACTUAL 56 DAYS 21 HOURS

- ~, -. - -

.,.mm

-. ~.,. -... -,.,..

.-m.

i t

i i

I i

i f

l I

i UNIT 1

i t

i t

L MAINTENANCE OUTAGE t

1M89 i

I D

h 4

h

9

+

MAINTENANCE OUTAGE 1M89 OBJECTIVES COMPLETE ALL 18 MONTH SURVEILLANCES I

TO EXTEND CYCLE TO 1R9 (OCT. 90)

)

INSTALL HPl VENTURI MODIFICATION REPAIR RCP 'C'

& 'D' OIL LEAKS IMPROVE PLANT MATERIAL CONDITION ENHANCE SAFE OPERATION OF ANO-1 I

r I

r l

l

l MAINTENANCE OUTAGE 1M89 ACCOMPLISHMENTS j

CONDUCTED 109 PMs AND SURVEILLANCES i

HYDROGEN PEROXIDE FLUSH / 459 CURIES

^

REMOVED REPAIRED RCP OIL LEAKS (ALL FOUR)

OTSG NOZZLE DAM RETAINING RINGS DCP SECONDARY SYSTEM UPGRADE HPI MODIFICATION RECOVERY 6 CRDM & RAD-CAL LEAK REPAIRS J

ALARA

- GOAL 145 MAN REM ACTUAL 154.8 MAN REM PCE GOAL 140

)

REVISED 50 i

ACTUAL 46

)

l l

v

- +, - -e.r m

-w,

l i

MAINTENANCE OUTAGE 1M89 i

INITIATIVES 1

i HYDROGEN PEROXIDE FLUSH REACTOR BUILDING LIGHTING SECONDARY SYSTEM UPGRADE REACTOR BUILDING MANUAL VALVE REPACK PROGRAM (PHASE 1)

SECONDARY SYSTEM DRY LAYUP PLAN SHIFT OUTAGE MANAGER CONCEPT i

k b

t 13

I i

6 I

k l

t 1

k I

4 i

P b

r f

6 h

ANO BUSINESS PLAN

'?

1 P

e h

I l

I 1

l '..

A la

l i

ANG BUSINESS PLAN COMPREHENSIVE USED AS THE BASIS FOR ALL 1

MANAGEMENT PLANNING s

i BETTERMENT ACTIVITIES INTEGRATED INTO-THE PLAN WORKING DOCUMENT

=

USED AS A~ DYNAMIC MANAGEMENT TOOL r

COVERS 5 YEAR PERIOD l

WITH PARTICULAR EMPHASIS ON NEXT l

3 YEARS REFERENCE DOCUMENT POINTS TO OTHER, MORE DETAILED L

PLANS AS APPROPRIATE i-

INPUTS

.i i

i MANAGEMENT EXPECTATIONS a

BETTERMENT ACTIVITIES i

a SELF ASSESSMENTS E

WORKLOAD MANAGEMENT i

FLANNING SESSIONS 1

EXTERNAL ASSESSMENTS a

SALP L

DET q

e BASE WORKLOAD ic

.-.4

l i

MeNITORING EFFECTIVENESS MEASURABLE PERFORMANCE INDICATORS

]

e

- SPECIFIC MEASURES FOR INDIVIDUAL ITEMS

- INDUSTRY AND ANO PERFORMANCE INDIGATORS

- ANO AND CORPORATE ASSESSMENTS

- QA/QC AUDITS /SURVEILLANCES/ INSPECTIONS 1

)

MONTHLY REVIEWS WITH EXECUTIVE i

MANAGEMENT j

ROUTINE REVIEWS \\NITH NRC i

+.,,

... ~ -.

- - -, -, ~. - - - - - - - - -

aew-w o,

,sma.

--^-45au o

seen--

m-e 416--

  • m*

b.

J4"-+*

M'-

re M--a**

---4-~~-

s 1.=

i i

BUSINESS PLAN MAJOR PROGRAM AREAS-

)

BUS. PL AN PG. NO.

QUALITY 1

ASSESSMENT 2

- OPERATIONS & MAINTENANCE 3

  • - DESIGN ENGINEERING & MODIFICATIONS 4

MATERIAL MANAGEMENT 5

REGULATORY AFFAIRS 6

a 6

HUMAN RESOURCES 7

TRAINING & EMERGENCY PLANNING 8

TECHNICAL SUPPORT 9

CHEMISTRY 9

PEALTH PHYSICS 9

--- INDUSTRIAL SAFETY 10 OPERATIONS TECHNICAL SUPPORT 10 f

SECURIT Y 10 ADMINISTRATIVE SUPPORT 11 MANAGEMENT SYSTEMS & RESOURCES 12 j

.GPECIAL EMPHASIS PROJECTS & ACTIVITIES 13 l

u 18

P *KL Ul\\iARY 1999 l

l anoonenrm omoueerm onAri DAT e 1119tgo vsrouemp zmouvres d~g{g k '7 m.

ANO A g' "*

g 166666.66. 666&d

__e,.

--t.e_

r NPO A

A.

l

?

NRC AENd'*

lE*i=E A T

1 t

D. DESIGN ENGINEEFUNG &

m a ptors,37w aw.3, stung,wPnoca,c i

co., TETE rsst e svsTtM awws A j

J MODIFICATIONS A

ocsa,svAu Anow MO Twee cowuTE 1

g ssTPo TcocRotemumw

&Pn0cErms

, ogi,a,m A wMoTshe;TURELLD '

I A N Lf%E CLASS 64D'IRAM MAN & PROCIDUP4ES a cown rE ret toewm PvouseTV TOncAtuta A ' COLLECT,ORONGENO SdOEX COWUTE COLLECT OROMeZE APO NIEXCEtIPLETE A 5

A. %oMr.1Rwee awm ASSESSMENT m ALI.E m toIMUM Tm8880 LEVEL ATTA84ED A T Tm**80 A

MCP Np*J p AN TOR ENG W SIMULATORS l

f l

A EsTane tenSTER SIC TUD SCUPE MO SOUDULE A

-___m,PO,_

Ft MdPENDSt#' PORT TO71E10r.;Af10Ps

& PETVORz'KEDS Ass;SSMENT JN)TRAN"E. ATE 9870 topolL TEPh8 FAOUTES PLApp#80 b

DE N MTG A A. SCKNANY"ros wfu PLAm sors A

cr.vEaopcor.m A'osPtme i

A LFPAtefMCMT MTG.

J DEPARTh8ENT Rffn A

DE W _M IffG l

6 e coMMupacAn0ms

& Ol40NOSTC cxmt wee ACTIOMB8EPORTOtK,:

.& S 'MCY MJCtfAR EMnPIEE74P8G PEER OROUP 885R i

i A

00110Ps ENG BEOff ATTENCuMG 8801DesG GN A: HOLD FOC1'9 OROUP SESSIONS TO DETEMAPdE l

l 3 HmmaEveemsm0vtverT SSirs

[

l A sarETYS*IM FUPeCT(M 9GPEC*D4 CM l

A SSR f A PETWORM pOEPENDENT ASSESSMEM Or es0W AMDOEX VU4.WE PROGIWars j~

A Ptwoseeeconsorm ASSESSMEMOr STMJCTLptiL APeALYSIS PROGRRAS

. - -... -.... ~..... -

~....

l 4

l l,

l

+

i 1

i s

i k

DIRECTOR, NUCLEAR OPERATIONS f

l.s i

9 1

I w

k.e

N.S.CARNS o

6

?h 3

m-

..,;._.....-.a...-_..._..

l i

DIRECTOR, NUCLEAR OPERATIONS PROGRAM RESPONSIBILITIES l

OPERATIONS AND MAINTENANCE

[

i TECHNICAL SUPPORT CHEMISTRY HEALTH PHYSlCS INDUSTRIAL SAFETY OPERATIONS TECHN! CAL SUPPORT SECURITY (EFFECTIVE 1-1-91) j 1

a.

.4

_.m.,

1 m.

)

3 OPERATIONS & MAINTENANCE

)

PROFESSIONALISM j

SURVEILLANCE PROGRAMS PREVENTIVE MAINTENANCE HOUSEKEEPING j

e ENGINEERED MAINTENANCE

+

i ENGINEERED OPERATIONS e

PLANNING AND SCHEDULING i

??

1 PROFESSIONALISM ESTABLISH SENIOR MANAGEMENT TEAM WHICH i

IS DIVERSE IN BOTH INDUSTRY AND SITE EXPERIENCE OBTAIN INDUSTRY EXPERIENCE t

REVIEW AND ENHANCE EXPECTATIONS e

IMPROVING HUMAN PERFORMANCE PROGRAM EXPAND FROM-UNIT OPERATIONS TO ALL NUCLEAR ORGANIZATIONS

- IMPROVE PROFESSIONAL EXPERTISE t

- !MPROVE PLANNING

- IMPROVE MANAGEMENT SERVICES

- IMPROVE TEAMWORK

?

P 23

l ENGINEERED MAINTENANCE

. ASSIGN PLANNERS AND MAINTENANCE ENGINEERS TO THE UNIT DISCIPLINE SUPERINTENDENTS

  • DEFINE CENTRALIZED MAINTENANCE l

PROGRAMS AND FUNCTIONS

  • UPGRADE WORK CONTROL PROCESS
  • DEFINE CORRECTIVE MAINTENANCE i

BACKLOG AND TARGETS 1'

. ESTABLISH PREDICTIVE MAINTENANCE PROGRAM 1

r i

4 ll~

(J.

I' i

l.

24

cc.

. -e.

b-i, v.;

ENGINEERED OPERATIONS ASSIGN SYSTEM ENGINEERS TO UNITS j

ESTABLISH TRAINING & QUALIFICATIONS

=

PROGRAM k

IMPLEMENT SHIFT ENGINEER CONCEPT s

I l

I i

('

)

p

7 6

..v c;

o OPERATIONS & MAINTENANCE ACCOMPLISHMENTS

- SUCCESSFUL OUTAGE MANAGEMENT

- ZERO LOST TIME ACCIDENTS

- IMPROVED EMPHASIS ON INDUSTRIAL SAFETY e

-- IMPROVED REDUCED RCS INVENTORY CONTROL

~

- lMPROVED INTERNAL AND EXTERNAL COMMUNICATIONS-

- ALARA IMP ~ROVEMENTS IN AWARENESS, MEETING EXPOSURE GOALS, REDUCING CONTAMINATIONS, AND IMPROVING CONTAMINATION CONTROL

- DAILY PLANNING MEETINGS SCHEDULED

- MANAGEMENT DAILY IN-PLANT INTERFACE

- DEMONSTRATED WILLINGNESS TO FIX PROBLEMS.

EXAMPLES:

UNIT 1-SECONDARY SYSTEM REACTOR VESSEL FLANGE LEAK / RAD CAL FIX SECONDARY PIPE WALL THINNING UNIT 2 CHECK VALVE INSPECTION PROGRAM LOG CHANNELS MAJOR PIPE REPLACEMENT DUE TO SUCCESS h

OF PIPE WALL THINNING PROGRAM v-

..-w..

-e4 e-w-r-

-ms-

  • t-t-

=

  • c 1

i'

?:

OPERATIONS & MAINTENANCE MAJOR MILESTONES - FIRST-QUARTER UNIT-2 SERVICE WATER SYSTEM IMPROVED FLOW MARGIN PERFORM AND COMPLETE NEEDS ASSESSMENT AS PART OF PROFESSIONALISM PROGRAM PROVIDE MANAGEMENT EXPECTATIONS TO OPERATIONS PERSONNEL ORGANIZATION REALIGNMENT

- UNIT SPECIFIC MAINTENANCE SYSTEM ENGINEERING TO NUCLEAR

+

OPERATIONS PLANNING ALIGNED TO EACH UNIT SCHEDULING ALIGNED TO EACH UNIT 1

AS

...-.....-,+.,.-..s a..

_. ~..

l ~', W.

e

', h..

e,.

4 e

t 0

GENERAL MANAGER ENGINEERING 9

k t

E l

G. T. JONES o

4 28

i i

-v a

1

-i F

4 5

GENERAL MANAGER ENGINEERING PROGRAM RESPONSIBILITIES DESIGN ENGINEERING MODIFICATIONS-i L

e

1 DESIGN ENGINEERING

& MODIFICATIONS ENGINEERING BACKLOG. ELIMINATION STAFFING

. RELOCATION

  • - PERFORMANCE INDICATORS ENGINEERING IMPROVEMENT PROGRAMS SYSTEM ENGINEERING IMPLEMENTATION FIRE PROTECTION PRA PENETRATION SEAL PROG. ASSESSMENT l

SUPPORT OF ANO MOV PROGRAM RESPONSE TO 79-02/79-14 FOLLOWUP INSPECTION CORRECTIVE ACTION PROGRAM SEISMIC QUALIFICATION OF EQUIPMENT GL-87-02 l

. PROCEDURES & ENGINEERING STANDARD UPGRADE DESIGN PROCESS IMPROVEMENTS 1

  • - DESIGN BASIS DCD ISOMETRICS UPGRADE i

-- ELECTRICAL DRAWING UPGRADE

' STRUCTURAL DESIGN PROGRAM TRAINING FACILITIES COMMUNICATIONS SELF ASSESSMENT (SSFI)

INDUSTRY INVOLVEMENT l-CONFIGURATION MANAGEMENT l

+

-w-

+

1,4 -

b ACCOMPLISHMENTS SINCE' LAST i

PERFORMANCE MEETING ENGINEERING BACKLOG BACKLOG DEFINED & GOALS ESTABLISHED ISSUED 18 MONTH ENGINEERING /

MODIFICATIONS PLAN STAFFING PLAN DRAFT PLAN ISSUED FOR REVIEW & COMMENT j

RELOCATION ANNOUNCED PROJECTED RELOCATION DATE PROJECT MGT. ORGANIZATION ESTABLISHED FOR RELOCATION AND FACILITY EMPLOYEE SURVEYS-ENGINEERING IMPROVEMENT PROGRAMS

-- SYSTEM ENGINEERS l:

1)

REASSIGN EVALUATION OF MATERIALS TO i

ANOTHER ENGINEER UNIT 2)

DEVELOPED SYSTEM ENGINEER IMPLEMENTATION AND TRAINING PLAN 3)

INITIATED TRAINING 4)

COMPLETED. DESK GUIDE ON CONDUCT AND - RESPONSIBILITY ANO MOV PROGRAM L

1)

ISSUED RESPONSE TO G.L. 89-10 2)

CONTINUED WITH MODIFICATION, CALCULATION & DEVELOPMENT TESTING

[

3)

COMPLETED ENGINEERING PROGRAM DOCUMENTS FOR MOV'S 3

6-

.4 r

f?

ACCOMPLISHMENTS (CONT.)

DESIGN BASIS DCD PROJECT

1). COMPLETED PROCEDURES FOR:

l A)

CALCULATION, SPECIFICATIONS n

& -ENGINEERING REPORTS B)

REVIEW OF SYSTEM & STRUCTURES L

C)

RESOLUTION OF DISCREPANCIES y

RESULTING FROM DCD i

2)

PILOT DOCUMENTS ISSUED & REVIEW l

COMPLETE FOR:

A)

SYSTEM UPPER LEVEL DOCUMENTS B)

TOPICAL UPPER LEVEL -DOCUMENTS 3)

DCIMS DESIGN COMPLETED ISOMETRICS UPGRADE A)

ACCELERATED SCHEDULE FOR UPDATE L

B)

ESTABLISHED PROJECT MANAGER WITH L

FULL SCOPE RESPONSIBILITIES.

-ELECTRICAL DRAWING UPGRADE A)

COMPLETED ISSUE OF-4160/480 VOLT L

SAFETY RELATED SWITCHGEAR DRAWINGS B)

PROJECT MGT. ESTABLISHED & EQUIPMENT SELECTED L

n L

)

DESIGN ENGINEERING & MODIFICATIONS MAJOR MILESTONES - FIRST QUARTER ENGINEERING BACKLOG ESTABLISH BACKLOG UNIT REDUCTION AS A FULLY FUNCTIONING GROUP BEGIN PROCESSING BACKLOG STAFFING PLAN e

COMPLETE STAFFING PLAN & OBTAIN APPROVAL COMPLETE REALIGNMENT OF ENGINEERING ORGANIZATION

' RELOCATION L

COMPLETE RELOCATION PLAN BEGIN CONSTRUCTION OF FACILITY DESIGN BASIS L

DCD PROJECT l

1)' COMPLETE DCIMS INSTALLATION 2)

COMPLETE-SETPOINT CONTROL & PIPING g

LINE CLASS PROCEDURES ~

3)

COMPLETE 11 UPPER LEVEL DOCUMENTS l.

(TOPICAL & SYSTEM)

L 4)

COMPLETE PILOT SYSTEM LEVEL l-PILOT DOCUMENT CONFIGURATION MANAGEMENT-e-

ESTABLISH ORGANIZATION COMPLETE ASSESSMENT OF CURRENT PROGRAM DEVELOP AND ISSUE POLICY DOCUMENTS l-l-

l L

+

L GENERAL MANAGER, j

TECHNICAL SUPPORT. AND 1

ASSESSMENT-I:

1 1

i i

l l

l b

l E. C. EWING l:

1A

GENERAL MANAGER, TECHNICAL SUPPORT AND ASSESSVIENT j

PROGRAM RESPONSIBILITIES L.

  • ASSESSMENT

[

  • REGULATORY AFFAIRS
  • TRAINING

& EMERGENCY PLANNING

. SECURITY (TRANSFERS TO

DIRECTOR, c

NUCLEAR OPERATIONS EFFECTIVE 1 91)

L se

1 l

i REGULATORY AFFAIRS IMPROVE IMAGE / CREDIBILITY COMMITMENT CONTROL F

IMPROVE-- QUALITY OF TECHNICAL SPECIFICATIONS p.

IMPROVE INTEGRITY OF COMMUNICATIONS LICENSEE EVENT REPORT IMPROVEMENT PROGRAM I

i.

l

3

.'[.

t SECURITY PERIMETER UPGRADE / COMPENSATORY POST ELIMINATION

  • - EQUIPMENT MAINTENANCE l

l' l

I 37

w L.

PROGRAM AREA ACCOMPLISHMENTS l

-ASSESSMENT REORGANIZATIONAL ALIGNMENT-PERMITS MORE PERSONAL ATTENTION TO ASSESSMENT 4

REGULATORY AFFAIRS INCREASED. EMPHASIS ON CONSERVATIVE REPORTING t

IMPROVED TIMELINESS OF. LER's IMPROVED COMMUNICATIONS TECHNICAL LEAD

-TRAINING & EMERGENCY PLANNING INPO REACCREDITATION VISIT MANAGER & TECHNICAL STAFF MAINTENANCE -(l&C, MECH, ELEC)

HEALTH PHYSICS / DOSIMETRY CHEMISTRY SECURITY PERIMETER FENCE REPLACED a-

-lNTAKE STRUCTURE MODIFIED e

CAS/SAS CONSOLES REPLACED DETECTION AIDS INSTALLED CAMERAS REPLACED ZONES COORDINATED WITH CCTV

+

L 38

~

PROGRAM MILESTONES L

FIRST QUARTER ASSESSMENT INPO EVALUATION REVISE CONDITION REPORT PROCEDURE-COMPLETE ' REVIEW OF 240 OUTSTANDING SIGNIFICANT CRs OBTAIN REVERSE LOANEE FROM INPO u

REGULATORY AFFAIRS IMPLEMENT WRITTEN STANDARDS DIRECTED AT lMPROVING IMAGE CREDIBILITY

  • -COMPLETE' COMMITMENT TRACKING STUDY IMPLEMENT TS INTERPRETATION PROCEDURE COMPLETE IMPLEMENTATION OF LER UPGRADE _

=

PROGRAM c

CONDUCT PERFORMANCE EVALUATION (SELF SALP)

TRAINING & EMERGENCY PLANNING INPO SIMULATOR EVALUATION EP. EXERCISE SECURITY INSTALLATION AND TESTING l

1'

,--.s

a v

.s

.l.

GENERAL MANAGER NUCLEAR QUALITY i

k 4

L.

W. HUMPHREY

GENERAL MANAGER NUCLEAR QUALITY PROGRAM RESPONSIBILITIES

. -QUALITY ' ASSURANCE t

QUALITY CONTROL / QUALITY ENGINEERING L'

NDE.

L l

l L

ll L

t l'

I 41 n.

g+7-

.t?

^

l PROGRAM AREA L

QUALITY 1

IMPROVE QA/QC ABILITY TO SELF IDENTIFY PROBLEMS / PRECURSORS IMPROVE TIMELINESS OF RESPONSE /

RESOLUTION TO NO FINDINGS RECEIPT INSPECTION IMPROVEMENTS NQ. RESOURCES TO SUPPORT UNITIZATION / SHIFT. MAINTENANCE CONTRACTOR REPLACEMENT (WITHIN NQ)

^

PEER INSPECTION 1

42

= -

f.

' a,-

3, e

,a; 1

NUCLEAR QUALITY IMPROVE QA/QC ABILITY TO SELF IDENTIFY PROBLEMS / PRECURSORS UTILIZATION OF NQ RESOURCES TO FOCUS

' ON SALP~ AND DET REPORTED PROBLEMS

-- :SALP AREA COMPARISON-VS. AUDIT /SURV.

COVERAGE PERFORMANCE REVIEW GROUP (PRG)

J UTILIZATION OF OUTPUT FROM PRG TO AID IN AUDIT / SURVEILLANCE / INSPECTION NO REVIEW OF MAINTENANCE JOB ORDERS DURING PLANNING PHASE COORDINATION BETWEEN NO AND ASSESSMENT GROUPS IMPROVE NO QUARTERLY TRENDING. REPORT n

QUALITY ACCOMPLISHMENTS OUTAGE ACTIVITIES '(2R7 & -1M89)

OC WELDING. INSPECTIONS (APPROXIMATELY. 5100)

CONSTRUCTION & MAINTENANCE INSPECTIONS (APPROXIMATELY 1900)

-INSPECTION. STAFF AUGMENTATION (2R7-23; 1M89-12)

NDE.

pts - 1766, UTs - 332 MTs-309, RTs - 317

. STAFF ~ AUGMENTATION (2R7-15; 1M89-9)

QA (2R7)

SURVElLLANCE OF 17 OUTAGE ACTIVITIES STAFF AUGMENTED BY 3 CONTRACT PERSONNEL QA1(1M89)

SURVEILLANCE OF 6 OUTAGE ACTIVITIES 100% VERIFICATION OF REQ'D 18 mo.

SURVEILLANCES STAFF AUGMENTED BY 2 CONTRACT PERSONNEL AUDITS COMPLETED SINCE 7/25/89 8 PROGRAMMATIC 15 AFRS 33 RECOMMENDATIONS 10 TECH SPECS 7 AFRS 8 RECOMMENDATIONS NUMBER' OF QA FINDINGS OPEN OVER 120 DAYS L-(

DECREASED FROM' 54 (10/10/89) TO 28 (1/17/90) l.

ADDED THIRD LICENSED OPERATOR (SRO UNIT 1) s

4 1

u QUALITY MAJOR MILESTONES - FIRST QUARTER COMPLETE ANALYSIS OF NO RESOURCE UTILIZATION FOR SALP/DET PROBLEM AREAS COMPLETE SALP AREA COMPARISON SCHEDULE FOR DEVELOPMENT OF EXPANDED AUDIT /SURVEILLANCES/ INSPECTIONS ESTABLISH PRG UNITIZATION / SHIFT MAINTENANCE IMPACT ON NO RESOURCES QC PRESENCE '& REVIEW IN P&S (INTERIM)

FOR MAINTENANCE JOB ORDERS L-MAINTENANCE JOB ORDER INSPECTION GUIDELINES DEVELOPED

-J t.

g 45

.e M

,h MM-aa&,,

.-4--.

4

.e.4 e4w-..

4 s z_a.

  1. h__

wa

_m.am.u.#

,,,aa, 4

a a

h y

e -;-

_e' GENERAL MANAGER l

NUCLEAR: SUPPORT

{

L W.

T.

CRADDOCK p

46

...\\

GENERAL MANAGER NUCLEAR: SUPPORT PROGRAM RESPONSIBILITIES HUMAN RESOURCES *-

ADMINISTRATIVE SUPPORT L

MANAGEMENT SYSTEM & RESOURCES

  • SPECIFIC EMPHASIS PROJECTS AND ACTIVITIES i

L L

L 7

47

~

L PROGRAM ACCOMPLISHMENTS HUMAN RESOURCES I

MODIFIED FITNESS-FOR-DUTY PROGRAM PER 10CFR26

-- ESTABLISHED A UNION / MANAGEMENT JOINT COOPERATIVE COMMITTEE ESTABLISHED TRAINING ADVISORY COMMITTEE-INITIATED A MANAGEMENT DEVELOPMENT PROCESS MANAGEMENT DEVELOPED COMMUNICATIONS PLAN IMPLEMENTED OUTAGE' COST MANAGEMENT PROCESS 1

48

l*

0

}

L..

+

MAJOR MILESTONES - FIRST QUARTER i

HUMAN RESOURCE COMPLETE RELOCATION PLAN

+

J MANAGEMENT COMPLETE STAFFING STUDY COMPLETE CONTRACTOR UTILIZATION STUDY FINALIZE ADMINISTRATIVE-1 DOCUMENT RESTRUCTURING PLAN CONDUCT ANO INFORMATION CONFERENCE l

)

An p._

s *'.,

s.

4

_(

h T,1 MATERIALS VIANAGEMENT..

t 9

i 1

4

- l

\\

f C.L. TYROhE 1-1 50

p 4

MATERIALS MANAGEMENT PROGRAM RESPONSIBILITIES-MATERIALS ENGINEERING ~

MATERIALS COORDINATION &

. INVENTORY' CONTROL STORES

.I 1

PURCHASING l

j MATERIALS CONTROL PROJECT 1

i i

l

{'

51

, f s+. 4 '

,9

+

PROGRAM AREA MATERIALS MANAGEMENT MATERIALS ENGINEERING

  • MATERIALS MANAGEMENT ORGANIZATION *

& STAFFING COMMERCIAL GRADE DEDICATION SHELF LIFE

^

MATERIALS MANAGEMENT INFORMATION

  • J SYSTEM (MMIS) t FACILITIES-4 INVENTORY CONTROL / MANAGEMENT Cn

MATERIALS MANAGEMENT i

MATERIALS ENGINEERING IMPROVEMENTS COMBINE IN ONE PROCESS ALL IDENTIFIED MATERIALS ENGINEERING FUNCTIONS STANDARDIZE REVIEW REQUIREMENTS

& FORMATS DEVELOP APPROACH FOR SPECIFICATIONS FOR KEY COMMODITY ITEMS MATERIALS MANAGEMENT ORGANIZATION

& STAFFING TASK / WORKLOAD IDENTIFICATION ORGANIZATION DESIGN STAFFING IMPROVE INVENTORY CONTROL / MANAGEMENT MMIS SECURITY

-WORK TRACKING & REPORTING CATALOGING STANDARDS BILL OF MATERIALS IMPROVE MATERIAL PL ANNING VERIFY EXISTING INVENTORY

PROGRAM AREA ACCOMPLISHMENTS CONSOLIDATED MATERIAL MANAGEMENT FUNCTIONS IMPLEMENTED MATERIAL CONTROL PROJECT REVISED COMMERCIAL GRADE DEDICATION PROCEDURE 1

l 1

IMPLEMENTED SHELF LIFE REVIEW

]

l l

L i

k P G

---.- v.----

f a

MAJOR MILESTONES - FIRST QUARTER COMPLETE ORGANIZATION AND STAFFING STUDY DEVELOP REVISED PROCUREMENT ENGINEERING PROCESS &

RUN PILOT PROGRAM FACILITIES REVIEW & IMPROVEMENTS PLAN

-CATALOGING STANDARDS DEVELOPMENT ESTABLISH MMIS DATABASE SECURITY l

l.

l L

55 l

o 7

,e to: w y

e.*

CLOSING REMARKS

)

AGGRESSIVELY PURSUE IMPLEMENTATION OF OUR IMPROVEMENT PROGRAMS i

CONTINUE ACTIVE MANAGEMENT INVOLVEMENT WITH THE SAFE OPERATION OF THE PLANT l

t CONTINUE EFFORTS TO INTEGRATE THE

)

  • SAFETY CULTURE" MENTALITY THROUGHOUT 1

THE AP&L ORGANIZATION CONTINUE EFFORTS TO SELF-IDENTIFY PROBLEMS l

AND IMPLEMENT CORRECTIVE ACTIONS i

PROVIDE ADEQUATE RESOURCES TO ENSURE TIMELY e

AND HIGH QUALITY NRC SUBMITTALS FREQUENT COMMUNICATIONS WITH NRC REGARDING I

PROGRESS ON IMPLEMENTATION OF IMPROVEMENTS l

t 56

. - -. -