ML20011E750
ML20011E750 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 02/14/1990 |
From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20011E751 | List: |
References | |
NUDOCS 9002220382 | |
Download: ML20011E750 (2) | |
Similar Documents at Sequoyah | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137C8271997-03-19019 March 1997 Revised TS Change 96-01 to Licenses DPR-77 & DPR-79,revising Appropriate Specifications,Surveillances & Bases to Allow for Conversion from Westinghouse Fuel to Framatome Cogema Fuel ML20136J0251997-03-13013 March 1997 Application for Amends to Licenses DPR-77 & DPR-79,revising Allowed Enrichment of Fuel in TS Section 5.6.1.2 for New Fuel Pit Storage Racks from 4.5 to 5.0 Weight % U-235 ML20129D2561996-10-18018 October 1996 Application for Amends to Licenses DPR-77 & DPR-79,removing Existing Footnotes That Limit Application of Apc for Plant SG Tubes to Cycle 8 Operation for Both Units ML20129G7111996-09-26026 September 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Fire Protection License Conditions & Relocation of Fire Protection Tech Spec ML20113G2421996-09-20020 September 1996 Application for Amends to Licenses DPR-77 & DPR-79, Clarifying Work Shift Durations for Overtime Limits ML20117J3341996-08-28028 August 1996 Application for Amends to Licenses DPR-77 & DPR-79, Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D0921996-08-22022 August 1996 Application for Amends to Licenses DPR-77 & 79 Changing Tss of Sqb Units 1 & 2 by Deleting Table 4.8-1, DG Reliability & Revising Sectio 3.8.1 to Allow a Once Per 18 Month 7 Day AOT for EDGs ML20117D3271996-08-21021 August 1996 TS Change 96-06 to Licenses DPR-77 & DPR-79,removing Surveillance Requirement 4.8.1.1.1.b to Verify Ability to Transfer Unit Power Supply from Unit Generator Supported Circuit to Preferred Power Circuit ML20117D2931996-08-21021 August 1996 TS Change 96-03 to Licenses DPR-77 & DPR-79,revising TS 3.7.1.3, Condensate Storage Tank, to Include New Mode of Applicability to Read Mode 4 When SG Relied Upon for Heat Removal ML20112H0361996-06-0707 June 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N6981996-04-0404 April 1996 TS Change 96-01 to Licenses DPR-77 & DPR-79,allowing Use of Nuclear Fuel Provided by Framatome Cogema Fuels (Fcf). Proprietary & Nonproprietary Versions of Fcf TR Supporting TS Change 96-01 Encl.Proprietary Version of TR Withheld ML20096B3671996-01-0404 January 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising TS Change 95-22,extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20095F0271995-12-12012 December 1995 Application for Amend to License DPR-79,consisting of TS Change 95-23 Revising TS SRs & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20095D5731995-12-0808 December 1995 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-20,extending Containment Spray & RHR Sys Nozzles Testing Period from 5 to 10 Yrs in Accordance W/Gl 93-05 ML20095D5431995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,consisting of TS Change 93-09,revising Setpoints & Time Delays for AFW loss-of-power & 6.9 Kv Shutdown Board loss-of-voltage & degraded-voltage Instrumentation ML20095D5811995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,revising TSs to Implement Recent Rule Change to 10CFR50,App J ML20092E0191995-09-11011 September 1995 Application for Amend to License DPR-79,consisting of TS Change Request 95-13,rev 1 Re Extension of Response Time Surveillance Requirements for Unit Two Cycle 7 ML20092E0351995-09-0808 September 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 3/4.7.8 to Clarify Intent of Vacuum Relief Flow During TS Required Testing of Auxiliary Bldg Gas Treatment Sys ML20092E2741995-09-0707 September 1995 Revised TS Change 95-15 for Amend to License DPR-77,revising TS Surveillance Requirements & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20091K4241995-08-21021 August 1995 Proposed TS Change 95-21 to Licenses DPR-77 & DPR-79, Revising TS LCO 3.7.5.c to Allow for Increase in Ultimate Heat Sink Temp to 87 F Until 950930 ML20087D3751995-08-0707 August 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Time Constants for Overtemp Delta Temp & Overpower Delta Temp Equations 1999-08-30 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217D2641999-10-12012 October 1999 Amends 248 & 239 to Licenses DPR-77 & DPR-79,respectively, Deleting License Condition 2.C(22).A from License DPR-77 & License Condition 2.C.(16).b from License DPR-79 ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20217B3581999-10-0606 October 1999 Amends 247 & 238 to Licenses DPR-77 & DPR-79,respectively, Request Approval to Remove TS 3.7.6, Flood Protection Plan & Associated Bases from TS for Sequoyah Nuclear Power Plant, Units 1 & 2 ML20212F4601999-09-23023 September 1999 Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20211N8811999-09-0707 September 1999 Amends 245 & 236 to Licenses DPR-77 & DPR-79,respectively, Requesting Approval to Remove Seismic Instrumentation Requirements & Associated Bases from SQN TSs for Units 1 & 2 ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20207A5781999-05-20020 May 1999 Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206G3691999-05-0404 May 1999 Amends 244 & 235 to Licenses DPR-77 & DPR-79,respectively, Adding New Action Statement to TS 3.1.3.2 That Eliminates Need to Enter TS 3.0.3 Whenever Two or More IRP Indicators Per Bank May Be Inoperable as Listed ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20205N0291999-04-12012 April 1999 Amend 234 to License DPR-79,revising Plant,Unit 2 TSs for Reactor Core by Adding Sentence at End of TS Section 5.3 Authorizing Installation of Limited Number of LTAs Containing Downblended U IAW TR BAW-2328 ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20204E8051999-03-16016 March 1999 Amends 243 & 233 to Licenses DPR-77 & DPR-79,respectively, Revising SQN Licenses by Deleting License Conditions 2.C.(23)F for Unit 1 & 2.C.(16)g for Unit 2 Which Authorizes TVA to Operate ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20206U4191999-02-0909 February 1999 Amends 242 & 232 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs for EDG by Adding Note to SR 4.8.1.1.2.d.10 & Deleting SR 4.8.1.1.2.d.11 ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20198C0051998-12-16016 December 1998 Amends 241 & 231 to Licenses DPR-77 & DPR-79,respectively, Revising Sequoyah Nuclear Plant TSs by Extending AOT for Plant EDGs from 72 Hours to 7 Days ML20196C3721998-11-19019 November 1998 Amends 238 & 228 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3.7.1.3 to Extend Limiting Condition for Operation of Condensate Storage Tanks to Mode 4 When SG Relied Upon for Heat Removal ML20196B0171998-11-19019 November 1998 Amends 239 & 229 to Licenses DPR-77 & DPR-79,respectively, Revising Plant,Units 1 & 2 TS SR 4.4.3.2.1 by Changing Mode Requirement to Allow power-operated Relief Valve Stroke Testing in Modes 3,4 & 5 with Steam Bubble in Pressurizer ML20195G3101998-11-17017 November 1998 Amends 237 & 227 to Licenses DPR-77 & DPR-79,respectively, Revising Plant TSs by Lowering Specific Activity Limit of Primary Coolant from 1.0 Uci/Gram Dose Equivalent iodine-131 to 0.35 Uci/Gram Dose Equivalent iodine-131 ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F2911998-08-28028 August 1998 Amends 235 & 225 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs by Relocating Snubber Requirements from Section 3.7.9 of TS & Bases,To SQN Technical Requirements Manual ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20236S3301998-07-0101 July 1998 Amends 233 & 223 to Licenses DPR-77 & DPR-79,respectively, Revise Section 6, Administrative Controls, Snp TS by Relocating Certain QA Provisions from TS to TVA Nuclear Quality Assurance Plan ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248L1911998-06-0808 June 1998 Amends 232 & 222 to Licenses DPR-77 & DPR-79,respectively,to Revise SQN TS by Adding New Limiting Condition for Operation 3.7.1.6 That Addresses Requirements for Main FW Isolation Valve Functions Required by SQN Accident Analysis ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20198P9051998-01-13013 January 1998 Amend 230 to License DPR-77,revising TS SR 4.4.3.2.1.b for Remainder of Cycle 9 to Perform Stroke Testing of power-operated Relief Valves in Mode 5 Rather than Mode 4 ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20217D7791997-09-29029 September 1997 Amends 229 & 220 to Licenses DPR-77 & DPR-79,respectively, Revises as-found Setpoint Tolerance Band for Pressurizer Code Safety Relief Valves & Ms Code Safety Relief Valves from 1% to 3% ML20211G1981997-09-23023 September 1997 Amends 228 & 219 to Licenses DPR-77 & DPR-79,respectively, Deleting TS Surveillance Requirement 4.8.1.1.1.b ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20210J5841997-08-12012 August 1997 Amends 227 & 218 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3/4.3.3, Monitoring Instrumentation, TS 3/4.7.11, Fire Detection Sys, TS 3/4.7.12, Fire Barrier Penetrations & TS 6.2.2, Facility Staff ML20151L7911997-07-14014 July 1997 Amends 226 & 217 to Licenses DPR-77 & DPR-79,respectively, Change TS by Eliminating EDG Accelerated Testing & Special Reporting Requirements of TS 4.8.1.1.2.a 1999-09-07 |
Text
,
p 3 -
7 a
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place FEB 141990
[
TVA-SQN-TS-90-06 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 90-06, DIESEL GENERATOR BUILDING FIRE PROTECTION In accordance with 10 CFR 50.90, we are enclosing a requested amendment to licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.
The proposed change. reflects the addition of a fire hose station in the diesel generator building.
This modification has been implemented in advance of-NRC's TS approval since operation is allowed with this configuration.
Plant configuration will be maintained by administrative controls.
I The proposed TS change is identified in Enclosure 1.
The justification for the proposed TS change is provided in Enclosure 2.
A proposed deter mination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
Please direct questions concerning this issue to K. S. Whitaker at (615) 843-7748.
U Very truly yours, TENNESSEE VALLEY AUTHORITY o.q M.J.May, Manager Licensing Project Management Sworn ~
nd -- subs ed before me
[-
'this day of p_.1993
+
My m
n Expires Enclosures cc:
See page 2 0
0Y 9002220382 900214 l
e" DR ADOCK 05000327 l
l PDC
()
An Equal opportunity Employer
g.
I 2
U.S. Nuclear Regulatory Commission FEB 14 E90 cc: Ms. S. C. Black, Assistant Director (Enclosures) for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White flint, North L
11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director (Enclosures) for Inspection Programs TVA Projects Division c.
L U.S. Nuclear Regulatory Commission L
Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Michael H. Mobley, Director Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector (Enclosures)
Sequoyah Nuclear Plant 2600 Igou ferry Road Soddy Daisy, Tennessee 37379 American Nuclear Insurers (Enclosures)
Attention: Librarian The Exchange, Suite 245 270 farmington Avenue farmington, Connecticut 06032
,