ML20011E695

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/89-23 & 50-353/89-31 on 891121-1231.No Violations Noted
ML20011E695
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/09/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20011E696 List:
References
NUDOCS 9002220221
Download: ML20011E695 (2)


See also: IR 05000352/1989023

Text

--

- _ - - -

.

-

.,

..

'*

,.

.

09 FEB 1990

Docket Nos. 50-352-

50-353

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill, Jr.

Executive Vice President-Nuclear

Nuclear Group Headquarters

'

Correspondence Control Desk

l

P.O. Box 195

Wayne, Pennsylvania 19087-0195

l

Gentlemen:

Subject:

Inspection No. 50-352/89-23 and 50-353/89-31

1

This letter transmits the routine resident safety inspection by Messrs.

T. Kenny, L. Scholl, and Ms. M. Evans from November 21 - December 31, 1989 at

the Limerick Generating Station, Limerick, Pennsylvania. The inspection

consisted of document reviews, interviews, and observations of activities.

The results have been discussed with Mr. Graham Leitch and Mr. Martin

McCormick, Jr. , of your staf f.

During this inspection period, we continued to note strong site management

ove.rsight of startup testing activities and routine operations. Also, we found

l

.

your root cause analysis of events to be thorough, resulting in an effective

,

corrective action program.

No violations were identified by NRC during this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the Public Document Room.

Your cooperation is appreciated.

!

Sincerely,

Original Sir.cd by

A. Randy U:cush

A. Randy Blough, Chief

Projects Branch No. 2

-

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report 50-352/89-23 and 50-353/89-31

0FFICIAL RECORD COPY

CIR LIM 89-23/89-31 - 0001.0.0

Og22ggggg[Q$$

/ I [.

2

,

-

,

.

.

. - - ,

,,

.

t

Philadelphia. Electric Company

2

09 FEB 1990

-

cc w/encis:

G. M. Leitch, Vice President - Limerick Generating Station

D. R. Helwig, Vice President - Nuclear Services

S. J. Kowalski, Vice President - Nuclear Engineering

J. W. Durham, Sr. Vice President and General Council

M. J. McCormick, Jr., Plant Manager - Limerick Generating Station

R. J. Lees, Chairman, Nuclear Review Board

J. Doering, Project Manager - Limerick Generating Station

'

G. A. Hunger, Jr. , Director - Licensing Section

J. F. O'Rourke, Manager - Limerick Quality Division

T. B. Conner, Jr. , Esquire

G. J. Madsen, Regulatory Engineer - Limerick Generating Station

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Pennsylvania

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

L. Doerflein, Section Chief, DRP

SLO

-

J. Dyer, EDO Office

R. Clark, NRR Project Manager

J. Lyash, SRI, Peach Bottom

,

NRC Senior Resident Inspector

W

RI:DRP

RI:DRP

Doerflein/rh1

Blough

02/'t /90

02/7/90

0FFICIAL RECORD COPY

CIR LIM 89-23/89-31 - 0002.0.0

02/09/90