ML20011E378
| ML20011E378 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/02/1990 |
| From: | Kintner L Office of Nuclear Reactor Regulation |
| To: | Cottle W SYSTEM ENERGY RESOURCES, INC. |
| Shared Package | |
| ML20011E379 | List: |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-67974, NUDOCS 9002130310 | |
| Download: ML20011E378 (3) | |
Text
]
.y.
r
- )' [ "*4 o,
UNITED STATES
[
.g NUCLEAR REGULATORY COMMISSION j
- 7,. ~
WASHINGTON, D, C 20555
- o, February 2,'1990 J
3 1
Dociet ho. 50-416:
j J
d Mr. W. T. Cottle.
1
- Vice President, Nuclear Operations
'l System Energy Resources, Inc.
Post Office Sox 469
- Fort Gibson, Mississippi 39150
- D Deer Mr. Cottle
p SULUECT:
GRAl.D GULF NUCLEAR STATION, UNIT 1 - LICENSE AMENDMENT REQUEST REGARDihG POST ACCIDENT NEUTRON MONITOR (TAC NO. 67974) 1 By letter dated Decenber 20, 1989, Systeni Energy Resources, Inc., (the L
. licensee) requested an operating license anendnent.
The amndnwnt would L
extend the iniplenantation date for installing a neutron flux nonitor to meet the requirements of Regulatory Guide 1.97, "Instrunantation-for i
Light-Water-Cooled = Nuclear Plants to Assess Plant and Environs Conditions During anc Following an' Accident." The basis for the requested extension was that the flRC staff's' position on a' deviation to. Regulatory-Guide 1.97 L
requirements proposea by the BWR Owner's Group (BWROG) would not 'be-available C
in tine to procure the neutron flux nonitor for installation in the fourth refueling outage, ns requimd by 0perating License Condition 2.C.(36).
The NRC staff has completed its review of the BWP,0G proposed deviation. A copy of the NRC staff's Safety Evaluation Report is enclosed.
The staff has 'ccrcluded that the Regulatory Guide 1.97 requirenants for neutron flux monitoring L
following an accident are appropriate and that the alternative criteria-t L
proposed-by BWROG in General Eleetric Report NED0-31558 are unecceptable.
L Accordingly, the licensee's April 28, 1988 plant-specific design evaluation -
i
' detailing conformance to NED0-31558 is also unacceptable, t
Ir 1
Nf6 I
,\\
- 8g21gggggggggg,,
et,c P
l
[
m 7 -
- 7. ' J
'ip e-Mr. W.cT. Cottle
- 2.-
February 2, 1990 i
1 The NRC staff. denies-the December 20, 1989 request for extension of the date to install'a neutron flux monitor meeting the requirements of Regulatory Guide 1.97 in Grand Gulf Nuclear Station, Unit 1.
The basis'for the denial-is 1
that a: procurement order can be placed by mid February 1990, which is the date i
scheduled by the licensee in order to install the monitor in the fourth refueling outage beginning October 1990.
This matter was discussed by.
j
. telephone with the licensee on January 31, 1990.
^
Sincerely.
1 Original Signed By:
j Lester L. Kintner, Senior Project Manager l
Project Directorate 11-1 i
Division of Reactor Projects - I/II-Office of Nuclear Reactor Regulation
Enclosure:
i As stated cc w/ enclosure:
See next page DISTRIBUTION Dochet4ile!
~NRC & Local-PDRs
.PDII-1 Rdg. File SVarga
-CWHehl ETourigny PAnderson LKintner OGC (info. only) l EJordan L
ACRS(10).
SNewberry GGNS PLANT FILE l '0FC :LA:PDIf[! '
- PM:PD 1
- 5IC RR
- (A)D:PDII-1 :
____.:.....y
. m.:....... __.:............:............:.........
l NAME : pan'dersi
- LKi.....__............: %............:............:............::.........
bid e y L DATE :cl/ / /90
- 2_/ ) /90
- p /;L/90
- f/.L/40 0FFICIAL RECORD COPY Document Name: GGNS AMEND 67974 i
1
..n 4
4 iMr. W._T. Cottle' 2.
- February 2, 1990 t
LThe NRC staff denies..the December 20,1 1989 request for_ extension of the date-to, install a-neutron flux monitor meeting _ the requirements of Regulatory -
a
- Guide 1.97 -in Grand Gulf Nuclear Station, Unit I., The basis for the denial is t
that'a procurement order can' be placed by mid-February 1990, which is the= date scheduled by the licensee in order to insta11' the monitor in the fourth.
refueling outage beginning October 1990.- This matter was; discussed by telephone with the -licensee on January 31, 1990.
Sincerely,-
L Original Signed By:
7 Lester L. Kintner, Senior Project Manager Project Directorate II-1 Division of Reactor Projects.-I/II Office of. Nuclear Reactor Regulation
Enclosure:
'As stated' l
cc w/ enclosure:
7 See next page DISTRIBUTION.
3 Docket File NRC & Local PDRs
.PDII-1 Rdg. File
'SVarga
'CWHehl ETourigny PAnderson LKintner OGC(info.only)
.EJordan
-ACRS(10)-
.SNewberry GGNS PLANT FILE l
l
- n. v 0FC :LA:PDIfl!
]):PM:PD
-l
- 5I RR
- (A)D:PDII-1 :
.....:.....y
.m.:.....__....:.........................:.........
NAME : pan'det si
- LKi H
................... : gg :
ib1d e y i.....:.....__.....:...
LDATE :cl/ / /90 2_/ ) /90
- p /;t/90
- gp/-A/40 L
OFFICIAL RECORD COPY L
Document Name: GGNS AMEND 67974 a
w-s w-