Responds to NRC Re Violations Noted in Insp Rept 50-029/89-03OL.Corrective Actions:Operating Procedures Ref by Emergency Operating Procedures Plus All Abnormal Operating Procedures Will Be Revised by 900228
ML20011E291
Person / Time
Site: Yankee Rowe
Issue date: 01/05/1990
From: Stlaurent N
YANKEE ATOMIC ELECTRIC CO.
To: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20011E290 List:
References
BYR-90-002, BYR-90-2, NUDOCS 9002130122
Download: ML20011E291 (2)


Text

,

a.

.. YANKEE ATOMIC ELECTRIC COMPANY

+

w n <m, nm, Star Route. Rowe, Massachusetts 01367

.xn YANKEIE i

1-January 5. 1990 l

L TR 90-006.5.2 BYR 90-002 l

United States Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia. Pennsylvania 19406 g

Attention:

Mr. Robert M Oallo. Chief Operations Branch Division of Reactor Safety

Reference:

(a) License No. DPR-3 (Docket No. 50-29)

(b) USNRC Letter to YAEC dated August 23. 1989.

Requalification Examination Report No.

50-029/89-03(OL-RQ)

(c) YAEC Letter to USNRC dated October 27. 1989..

in response to reference (b)

(d) USNRC Letter to YAEC dated November 21. 1989.

Inspection 50-29/89-03 (OL)

Dear' Sir:

References (b). (c) and (d) represent correspondence concerning areas for improvement identified during the requalification examinations administered on June 20-30, 1989. Subsequent to our letter of October 27.

'1989 and resulting fros discussions with Mr. Larry Briggs, team leader for our recent Emergency Operating Procedure Inspection (50-29/89-80). we have modified our schedule for improving the quality of our operating procedures.

1.

By February 28. 1990, we will revise those operating procedures referenced by the Emergency Operating Procedures plus all abnormal operating procedures. The basis for this revision will be technical accuracy and operator walkdown reviews.

2.

For the 1990 refueling outage the primary plant cooldown. heat-up and power operations procedures will be revised prior to use.

3.

During the following operating cycle. the entire operating procedure set will the subject of a major review and revision process for technical accuracy. operator walkdowns. re-indexing and a procedure generation package.

'9002130122 poo293 g-

'{DR ADOCK 05000029 kd PDC yy

a e

f-L'nited States Nuclear Regulatory Commission January 5. 1990 b

We are giving the procedure upgrade effort top priority. Consistent with assuring maximum operator involvement, our schedule allows for the extensive operator support and input so vital to developing a set of workable procedures.

i We trust you will find this subsittal satisfactory: however. should you desire additional information. please contact us.

Very truly yours.

YANKEE ATOMIC ELECTRIC COMPANY hm17sm;'

N. N. St Laurent Acting Manager of Operations cci

[3] NSARC Chairman (YAEC)

[1] Document Control Desk

[1] Resident Inspector

. -) 'In: J0 !iF:0

!.-