Notice of Violation from Insp on 891101-1216.Violation Noted:Failure to Initiate 10CFR50.59 Safety Evaluation for Pressurizer Safety Valve Tests Performed on 890902
ML20011D971
Person / Time
Site: Braidwood 
Issue date: 12/22/1989
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20011D970 List:
References
50-456-89-28, NUDOCS 9001030306
Download: ML20011D971 (1)


Text

.-

NOTICE OF VIOLAlION Commonwealth Edison Company Docket No. 50-456 As a result of the inspection conducted from November 1 through December 16, 1989, and in accordence with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1989), the following violation was identifiec:

10 CFR 50.59 requires that the licensee shell also maintain records or tests and experimcnts carriec out... pursuant to... these records must include a written safety evaluation which provides the basis for the determination that-the change, test, or experiment does not involve an unreviewed safety question.

Contrary to the above, on September 2,1969, the licensee failed to initiate e 10 CFR 50.59 safety evaluation for the pressurizer-safety valve' tests performed on September 2, 1989. The previous tests were performed as a bench test as described in the FSAR. The Septe6.her 2, 1989 test was revised to perform the safety valve test with the-valves installed on the pressurizer.

The change in the test method procedure;should have received a safety evaluation as required by 10 CFR 50.59.

This is a Severity Level IV violation (Supplement I).

(No.-50-456/89028-01(DRP))

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or-explanation in reply, including for each violation:

(1) the corrective actions that have been taken and the results achieved; (2) the corrective actionsthatwillbetakentoavoidfurtherviolations;ano(3)thedatewhen full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

DEC 2 21989 Dated QWD. Shafer, ChlyJ_ )

y Reactor Projects Branch 1 9001030306 891222 PDR ADOCK 05000456 o