Forwards Safety Insp Repts 50-333/89-20 on 890828-0929. Noncited Violation Noted.Nrc Determined That Mod Program Adequately Controlled by Administrative Procedures
ML20011D181
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/04/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20011D182 List:
References
NUDOCS 8912220001
Download: ML20011D181 (2)


See also: IR 05000333/1989020

Text

[h

w e

}c.S

Lg,

.t

%

,

ll.

_

'

.

7; jp

9

DEC - 41989

Docket No. 50-333

!

L

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

.c

ATTN: Mr. William Fernandez

,

Resident Manager

E

P. O. Box 41'

p

Lycoming, New York 13093

L

Gentlemen:

h

Subject:

Inspection Nuniber 50-333/89-20

This letter refers to the routine safety inspection of your design and

modifications programs conducted by Messers. L. Prividy and J. Yerokun of this

office on August 28 - September 1, September 5-9, and September 25-29, 1989 at

the James A. FitzPatrick Nuclear Power Plant and at your White Plains

corporate office. A discussion of our findings was held by Messers. Prividy

and Yerokun with you and your staff at the conclusion of this inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which .is enclosed with this letter. Within these areas, the

inspection consisted of~ selective examinations of procedures and

,&,

representative records,-interviews with personnel and observations by the

inspectors.

Our inspectors determined that the modification program was being adequately

  • '..

controlled by administrative procedures. The plant modifications reviewed

were designed and being installed in a controlled and thorough manner.

Within the scope of this inspection, e licensee identified, non-cited violation

was identified as discussed in Sectiui 2.2. of the enclosed report for which no

reply is necessary.

Your cooperation with us in this matter is appreciated.

'

Sincerely,

ne a v wl Sr2

J:

w P . Dr.~

a

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

0FFICIAL RECORD COPY

IR FITZ 89-20 LOST - 0001.0.0

'

11/28/89

r

8912220001 891204

t

I

ADOCK 0500

3

jDR.

7f01

m

'

'

,

,

.

'

x

c-

. Power Authority of the State of.

2

-

,

J

New York

c

F

DEC -' C 1989

Enclosures:

J1. Appendix A, Notice of. Violation

2. NRC Region I Inspection Report No. 50-333/89-20

.

cc w/ enc 1:

'.J.' Phillip Bayne, P' resident

J.(Brons, Executive Vice President

,N..p"1 -

Al Klausmann, Senior Vice President - Appraisal and Compliance Services

t'

"

R. Patch, Quality Assurance Superintendent

G. Wilverding, Manager Nuclear Safety Evaluation

_

'

.G.'Goldstein,' Assistant General Counsel

h

R. Beedle, Vice President Nuclear Support

L

S. Zulla, Vice President Nuclear Engineering

"

R. Burns, Vice President Nuclear Operation

Dept. of Public Service, State of New York

.

State of New York, Department of Law

'Public Document _ Room (PDR)

'

Local Public Document Room'(LPDR)

Nuclear Safety Information Cotter (NSIC)

NRC Resident Inspector

-

j _

State of New York

bec.w/ enc 1:

.

Region I Docket. Room (with concurrences)

!'

-Management Assistant, DRMA (w/o enc 1)

t

J. Wiggins, DRP,

r

D. Limroth, URP'

4:

R. Barkley, DRP

b5

Monte Conner, SALP Reports'Only

b

'PA0 (17) SALP Reports Only.

D. LaBarge, NRR

J. Dyer, EDO

,

-t.(l

RMS

RSkun-RIpq

S

R1.DRS

Prividy/ tim

e

Eap

Durr

-11/o3/89

11/ /89

11/7/89

if/d/89

0FFICIAL RECORD COPY

IR FITZ 89-20 - 0002.0.0

11/03/89

]

u=

+_