October 29, 1981

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special pr licensing follow-up inspection conducted

by Messrs. J. P. Patterson and M

P. Phillips of this office on October 13-15,

1981, of activities at La Salle County Station, Units 1 and 2, and to the

discussion of our findings with Mr. R. Bishop and others of your staff at

the ceaclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any informatica that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

.-

vd N&o),/

c

{

m

.

?

NOV0 21981* 11

3 "* '*J" .'%"^"" e

y

N/TM \\

9111030541 011029

PDR ADOCK 05000373

'%

--

G

PDR

-

- - - - -

A

.

,

.

.

. *

b

Commonwealth Edison Company

-2-

October 29, 1981

identifies the document or part sought to be withhc1d, and which contains

a full statement of the reasons which are the bases for the cla$m that the

information should be withheld from public disclosure. This see?. ion further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

4t<

. A. Hind, Director

Division of Emergency Preparedness

and Operational Support

Enclosure:

IE Inspection

Reports No. 50-373/81-37

and No. 50-374/81-18

cc w/ encl:

Louis 0. De1 George, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson

Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Pp(eciello

f[

RIII

RIII

BIII

RIII

RIII

RIII

f

{/f

A(efson

I'

%

Phi 1Iips/jp

Pagterson

Reimann

M dd

x

10/27/81

lp 7

g \\

V

f

-

- - -

- -

. -

- -

-

-

-

- -

- -

-

- -

-

- -

-

-

- - - .

-