Discusses Insp of 811021 Emergency Preparedness Exercise. Review of Exercise Indicated Need to Improve Operation of Emergency Operations Facility.Improved Exercise Will Be Conducted by 820101
ML20011A847
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/28/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8111030279
Download: ML20011A847 (2)


Text

-

. CONF 1dMATION OF ACTION E

October 28, 1981 Docket No. 50-409 Dairyland Power Cooperative ATTN:

Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

This refers to the routine inspection of your emergency preparedness exercise conducted on October 21, 1981, at the La Crosse Boiling Water Reactor and to the discussion after the exercise between Mr. C. J. Paperiello of our. office and Mr. R. Shimshak of your staff with respect to activities conducted at the Emergency Operations Facility during the exercise. This also refers to the subsequent conversation between Mr. Paperiello and Mr. Taylor on October 26, 1981. These discussions were concerned with the need to improve the operation of the Emergency Operations Facility.

With respect to the above, it is our understanding that by January 1, 1982, you will conduct an emergency exercise of sufficient scope to demonstrate that the Emergency Operations Facility can perform the following functions in a timely manner:

1.

Establish and maintain communication with the local governmental agency with the lead responsibility in emergency response sufficient to ensure that both parties are aware of each others activities and recommendations.

2.

Establish and maintain communication with the Joint Public Information Center sufficient to provide the Dairyland Public Information Officer with timely information and to review press releases before they are issued.

3.

E:tablish and maintain communications with the plant sufficient to ensure that the Emergency Control Director can control the overall direction of the emergency response.

4.

Perform accurately and timely offsite dose assep 6,L. I. / /@

5.

Maintain records of the above activities. p

] N on@V[g,%

ygg 19816

-~! u... %,, W== 4h Tg37 Mu v>\\

3 s

kl g

i O

p y

CONFIRMATION OF ACTION ffd

CONFIRMATION OF ACTION Dairyland Power Cooperative October 28. 1981 The NRC shall be provided with advanced notification of the above exercise along with a copy of the scenario.

If our understanding of the above is not correct, please notify this office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Sincerely, James G. Keppler Director cc:

R. E. Shimshak, Plant Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief Boiler Inspector Stanley York, Chairman Public Service Commission JIII R1 RIII RII

)

RIII RIII RIII R

/d 'f, dX ?

f-Keppler k.

(f O

Grant /jp Axdson Pap ie}1o H2

-' War 9 ck McGregor Davis j

10/26/81

/0 7/t[

/0)ff J, p CONFIRMATION OF ACTION s

/