ML20011A498

From kanterella
Jump to navigation Jump to search
Forwards LER 81-095/03L-0
Date released: 01/25/2020 Download: ML20011A498


LER 81-095/03L-0:on 810908,reactor Core Isolation Cooling Steam Line Delta P Switch Actuated at Level Outside Tech Specs Range.Caused by Setpoint Drift.Switch Recalibr.Rept Will Be Updated When Switch Is Replaced
ML20011A507
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/01/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20011A507 (2)
Forwards LER 81-095/03L-0
ML20011A497
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/01/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20011A497 (1)