ML20011A286

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/81-34 on 810914,17 & 18.No Noncompliance Noted
ML20011A286
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/28/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20011A287 List:
References
NUDOCS 8110080451
Download: ML20011A286 (2)


See also: IR 05000373/1981034

Text

_

w

O

,

SEP 2 81991

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. D. Schulz of

this office on September 14, 17, and 18, 1981 of activities at LaSalle County

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the

discussion of our findings with Mr. R. D. Kyrovac and Mr. G. Watts at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspect Sn.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withbc1 ding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to aithhold such infor-

mation. Seccion 2.790(b)(1) requires that eny such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the documect or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

%b

s

I {

81i0080451 810928

PDR ADOCK 05000373

G

.PDR

-_

.

%

Commonwealth Edison Company

-2-

SEP 2 81501

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as .far as possible into a separate part of the affidavit.

If se do

- not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

. We will gladly discuss any questions you have concerning this inspection.

,

Sincerely,

original signed by C.E. HorellMM)

-

n

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

. Enclosure:

IE Inspection

Report-No. 50-373/81-34

cc w/ encl:

-

Louis 0. DelGeorge

Director of Nuclear

,

l

Licensing

'

L. J. Burke, Site

Construction Superintendent

i

T. E. Quaka, Quality.

Assurance Supervisor

P. H. Holyoak, Station

' Superintendent

B. B. Stephenson

Project Manager

DMB/ Document Control Desk (RIDS)

L

Resi0ent Inspector, RIII

'

Mary Jo Murray, Office of

Assistant Attorney General

.

.

RI;I

R I

RIIt

RI I

RIII

z/so

er

il tams

Reimann

Nb }p

u

-[9/24/81

'7 F5

,

5

J