ML20011A072

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-245/81-09 & 50-336/81-08 on 810526-29 & Notice of Violation
ML20011A072
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/18/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20011A073 List:
References
NUDOCS 8110060520
Download: ML20011A072 (2)


See also: IR 05000245/1981009

Text

_

.

.

.

.

.

.

.

.

SEP 181981

Docket Nos. 50-245

50-336

v)

(y'8fC!{U,T

Northeast Nuclear Energy Company

[h

ATTN: Mr. W. G. Counsil

Senior Vice President - N clear

Es

Engineering and Operations Group

g

DCT g ygg

,

_

P. O. Box 270

'H u.s.%,,,,W " q/

.gj

(

%u

Hartford, Connecticut 06101

v.

Gentlemen:

dh'

y

'

Subject:

Inspection 50-245/81-09; 50-336/81-08

This refers to the safety inspection conducted by Mr. W. A. Rekito of this

office on May 26-29, 1981 at Millstone Nuclear Power Station, Units 1 and

2, Waterford, Connecticut of activities authorized by NRC License Nos. DPR-

21 and DPR-65 and to the discussions of our findings held by Mr. Rekito

with Mr. E.J. Mroczka and others of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described ia the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance has been categorized into the levels described

l

in the Federal Register Notice (45 FR 66754) dated ;ctober 7, 1980. You

are required to respond to this latter and in prepacing your response, you

should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

,

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information tpat you (or your contractors)

R1:DETI [R1:DET1 -l

1:DRPI

i1

JR I

R-

e

w

Ca htonv Martin

1sasser Brunner

.

9/, t o

9/f/81

24/81

81

9 /81

9(781

!

0FFICIAL RECORD COPY

j

s@

8110060520 810918

PDR ADOCK 05000245

G

PDR

.

-

-

'

.

.

.

,

.

.

.

Northeast Nuclear Energy Company

2

believe to be exempt from disclosure under 10 CFM 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

Cricinal Sice:Cy:

Eldon J. Brunner, Chief, Projects

Branch #1, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-245/81-09; 50-336/81-08

cc w/encls:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State cf Connecticut

bec w/encls:

.

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

!