Text
_
.
.
.
.
.
.
.
.
SEP 181981
Docket Nos. 50-245
50-336
v)
(y'8fC!{U,T
Northeast Nuclear Energy Company
[h
ATTN: Mr. W. G. Counsil
Senior Vice President - N clear
Es
Engineering and Operations Group
g
DCT g ygg
,
_
P. O. Box 270
'H u.s.%,,,,W " q/
.gj
(
%u
Hartford, Connecticut 06101
v.
Gentlemen:
dh'
y
'
Subject:
Inspection 50-245/81-09; 50-336/81-08
This refers to the safety inspection conducted by Mr. W. A. Rekito of this
office on May 26-29, 1981 at Millstone Nuclear Power Station, Units 1 and
2, Waterford, Connecticut of activities authorized by NRC License Nos. DPR-
21 and DPR-65 and to the discussions of our findings held by Mr. Rekito
with Mr. E.J. Mroczka and others of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described ia the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into the levels described
l
in the Federal Register Notice (45 FR 66754) dated ;ctober 7, 1980. You
are required to respond to this latter and in prepacing your response, you
should follow the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information tpat you (or your contractors)
R1:DETI [R1:DET1 -l
1:DRPI
i1
JR I
R-
e
w
Ca htonv Martin
1sasser Brunner
.
9/, t o
9/f/81
24/81
81
9 /81
9(781
!
0FFICIAL RECORD COPY
j
s@
8110060520 810918
PDR ADOCK 05000245
G
.
-
-
'
.
.
.
,
.
.
.
Northeast Nuclear Energy Company
2
believe to be exempt from disclosure under 10 CFM 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such information. Consistent with section
2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or
part sought to be withheld, and which contains a full statement of the
reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
The telephone notification of your
intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
Cricinal Sice:Cy:
Eldon J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Numbers 50-245/81-09; 50-336/81-08
cc w/encls:
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State cf Connecticut
bec w/encls:
.
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY
!