ML20011A018
| ML20011A018 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/14/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20011A019 | List: |
| References | |
| NUDOCS 8110060363 | |
| Download: ML20011A018 (2) | |
See also: IR 05000423/1981010
Text
l
'
.
.
,
o
SEP 141981
8
"h
,
- Q[l[l?t
b
G
h
7
Docket No. 50-423
GCT
Northeast Nuclear Energy Company
%s.
Nih
h
%'4er
8
ATTN: Mr. W. G. Counsil
'
Senior Vice President - Nuclear
g
ering and Operations Group
t
/
Hartford, Connecticut 06101
Gentlemen:
I
Subject:
Inspection 50-423/81-30
This refers to the routine inspection conducted by Mr. S.D. Reynolds, Jr.
of this office on August 3, 4, 6, ana 7, 1981 at Millstone Nuclear Power
Station, Unit No. 3, Waterford, Connecticut of activities authorized by NRC
License No. CPPR-113 and to the discussions of our findings held by Mr.
Reynolds, Jr. with Mr. S. Orefice of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is er. closed with this letter.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observations t,y the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure uncar 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within' ten
(10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter
a written application to this office to withholc' such information. Consistent
with section 2.790(b)(1), any such application must be accompanied by an
affidavit execut d by the owner of the nformation which identifies the
hI
- DRPI
ETIf.RI:DETI
R1:
R1:DETI
RI:DE11
Reynolds/wb
ripp
T. Martin Elsasser ' runner
8/27/81
8/ 7/81
9/11/81
3/" /81
0FFICIAL RECORD COPY
g
.t/d
u. n w a % k.
s.fr
-
__
.
__
-
,
__
._
_
_
. .
_.
_
__
.
.
.
.
Northeast Nuclear Energy Company
2
documert or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the information should
be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not
hear from'you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room. The telephone notificatier.
of your intent to request withholding, or any request for an extension of
the 10 day period which you believe necessary, should be made to the Supervisor,
Files. Mail and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, if you hase any quest;ons
'
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
Y
&
Eldon J. Brunner, Chief, Projects
'"
Branch #1, Division of Resident
and Project Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-423/81-10
cc w/ encl:
K. W. Gray, Construction Quality Assurance Supervisor
l
E. R. Foster, Director of Generation Construction
l
J. F. Opeka,. Vice President, Nuclear Operations
l
R. T. Laudenat, Manager, Generation Facilities Licensing
,
D. G. Diedrick, Manager of Quality A.surance
'
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encl)
0FFICIAL RECORD COPY
..
..
.
..
.
.
_
-____-_.