Docket No. 50-461
T g g*A
.
'
sp
,q
-
Illinois Power Company
-
,
ATTN:
Mr. W. C. Gerstner
k,h
.
c
Executive Vice President
'V,
y'
V p%/ E
500 South 27th Street
'
Decatur, IL 62525
.,
s
-
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. N. Gardner
and R. S. Love of this office on August 11-14, 1981, of activities at Clinton
Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and
to the discussion of our findings with you and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifice areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telenhone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information.
Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure. This section further requires the statement to address
fY
.5
!/
8109290717 810916
PDR ADOCK 05000461
0
,.
-
-
-
-
- - - -
-
-
-
-
-
-
-
-
-
-
- .
e
.
s
.
.
Illinois Power Company
-2-
)
'
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
0 $bhm-l
'
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-461/81-20
cc w/encls:
DMB/ Document Contrcl Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
RII
RIII
RIII
R
RI I
RIII
&>
WikucdM
k 6 v F*~'~
/
Re[ any y
,
Hawkins
Williams
Norelius
LTnfe/so
Gardner
9/3/81
y q{u
/g
9/4./7/
- f/j3
,
-
.--
, - - - -
,
,---,,n,,~e-
-
,
.,.
,c--
.. ,.,---. ,