Forwards IE Insp Rept 50-461/81-20 on 810811-14 & Notice of Violation
ML20010J211
Person / Time
Site: Clinton 
Issue date: 09/16/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20010J212 List:
References
NUDOCS 8109290717
Download: ML20010J211 (2)


See also: IR 05000461/1981020

Text

c

.

.-

_

-

.

.

.

.

$EP 1 6 $8C

Nil;r

o

'/

S

  1. 2 ~

'

?

A

,S

'

Docket No. 50-461

T g g*A

.

'

sp

,q

-

Illinois Power Company

-

,

ATTN:

Mr. W. C. Gerstner

k,h

.

c

Executive Vice President

'V,

y'

V p%/ E

500 South 27th Street

'

Decatur, IL 62525

.,

s

-

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. N. Gardner

and R. S. Love of this office on August 11-14, 1981, of activities at Clinton

Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and

to the discussion of our findings with you and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifice areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telenhone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information.

Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

fY

.5

!/

8109290717 810916

PDR ADOCK 05000461

0

,.

PDR

-

-

-

-

- - - -

-

-

-

-

-

-

-

-

-

-

- .

e

.

s

.

.

Illinois Power Company

-2-

)

'

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

0 $bhm-l

'

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-461/81-20

cc w/encls:

DMB/ Document Contrcl Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Manager,

Nuclear Facility Safety

Randall L. Plant, Prairie

Alliance

RII

RIII

RIII

R

RI I

RIII

&>

WikucdM

k 6 v F*~'~

/

Re[ any y

,

Hawkins

Williams

Norelius

LTnfe/so

Gardner

9/3/81

y q{u

/g

9/4./7/

  1. f/j3

,

-

.--

, - - - -

,

,---,,n,,~e-

-

,

.,.

,c--

.. ,.,---. ,