Advises That One Item in Response to Re Control of Heavy Loads Can Not Be Completed by Requested Date of 810922.Complete Submittal Expected by Early Nov 1981
ML20010J154
Person / Time
Site: Brunswick  
Issue date: 09/22/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, TASK-A-36, TASK-OR NO-81-1553, NUDOCS 8109290642
Download: ML20010J154 (1)


Text

_

1 GP&L

" d Carolina Power & Light Company September 22, 1981 FILE: NG-3514(B)

Serial No.: NO-81-1553 l

l

[hbs Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief p

7 Operating Reactors Branch No. 2

'q.

fp' g$

United States Nucletr Regulatory Commission

/gl 4

Washington, D.C.

20555 t.

Z-(9

  • i BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 D

1/

j/g DOCKET NOS. 50-325 AND 50-324 E

LICENSE NOS. DPR-71 AND DPR-62

/

CONTROL OF HEAVY LOADS

(,, j

  • W \\./

l

Dear Mr. Ippolito:

Mr. D. G. Eisenhut's letter dated December 22, 1980 was trans-mitted to all licensees, and it requested information concerning control of heavy loads via several enclosures. This letter was. received at Carolina Power & Light Company (CP&L) several times, and, because of the confusing nature of the enclosures, they were discussed with NRR staff earlier this year and guidance was given to CP&L staff regarding which questions to answer for each type (BWR and PWR) of plant. This confusion was again discussed with your staff in a telephone call on September 2, 1981.

During the call, it was discovered that the letters and enclosures were identical except for parts of Enclosure 3; one was for PWRs and one was for BWRs although there was no identification to point this out.

The PWR has been used in the efforts for both our Brunswick and Robinson plants. As a result, one omitted BWR item can not be completed by the requested date of September 22, 1981.

The recently-identified item for Brunswick will require four to six weeks to complete.

In order to make a clear, complete submittal, CP&L prefers to transmit the entire Brunswick report to NRC in early November, 1981.

Please advise us if you have any questions regarding this revised schedule.

Yours very truly, U

g E. E. Utley Executive Vice President

/O Power Supply and Engineering & Construction JAM /lr (6916) 8109290642 810922 DR ADOCK 05000 111 Fayetteville Street P. O. Box 1551

  • Raleigh, N. C. 27602