ML20010J147
| ML20010J147 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 09/21/1981 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20010J148 | List: |
| References | |
| NUDOCS 8109290637 | |
| Download: ML20010J147 (2) | |
See also: IR 05000409/1981017
Text
.
.
.
SEP 211981
/ Yg '/il ' n,7's$\\
Docket No. 50-409
/
D 4,,%k
'Q
d
Dairyland Power Cooperative
-i
O
'
.
ATTN:
Mr. F. W. Linder
fn
General Manager
.T/s
-'i
2615 East Avenue - South
\\
-
'/
-
Lacrosse, WI 54601
%n y,
Gentlemen:
'
This refers to the routine safety inspection conducted by Messrs. A. G. Januska
and S. Rozak of this office on August 24-28, 1981, of activities at Lacrosse
Boi?ing Water Reactor authorized by NRC Operating License No. DPR-45 and to
the discussion of our findings w$th Mr. Shimshak and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
In addition, our Mobile Laboratory was at the
site during the inspection to perform independent spectral measurements of
radioactivity in samples split with the licensee.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
Based on discussions with members of your staff during this inspection
and at the exit interview, it is our understanding that you have agreed
to commitments summarized in the exit interview section of the enclosed
copy of our inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Roon.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
TCON
s
/ /
81092
PDR ADOCK37 g10921 i
05000409
G
PDR.
.
_ _ _ - _ _
_ _ _ _ _ _ _ _ - _ _ - _ _
_ _ _ - _ _ _ _ _ _ _
. .
-
.
.
Dairyland Power Cooperative
-2-
it is necessary that you (a) notify this office by telephone within seven (7)
days from tne date of this letter of your intent: on to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
.
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear frcm you in this regard within the specified periods noted
above, a copy of this letter and .he enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. A. Ilind, Director
Division of Emergency Preparedness
and Operational Support
Enclosure:
IE Inspection
Report No. 50-409/81-17
cc w/ enc 1:
R. E. Shimshak, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Stanley York, Chairman
Public Service Commission
]
,yt/
.
'l'nd
Jant ska/jp
Ro'
k
Schumacher
Paperiello
i
9/17/81
)