QA Program Insp Rept 99900003/81-02 on 810720-24. Noncompliance Noted:Fluorine,Chlorine,Carbon & Nitrogen Samples Not Always Drawn from Same Matl as Metal Impurity Sample for Gadolinium Fuel
ML20010J114
Person / Time
Issue date: 09/02/1981
From: Mcneill W, Whitesell D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20010J098 List:
References
REF-QA-99900003 NUDOCS 8109290604
Download: ML20010J114 (7)


Text

.

GENERAL ELECTRIC COMPANY dRGANIZATION:

MILMINGTON MANUFACTURlNG DEPARTMENT BILMlNGTON, NORTH CAR 0LlNA REPORT NO.: 99900003/81-02 INSPECTION DATE(S):

7/20-24/81 llN CTION ON-SITE HOURS: 30 CORRESPONDENCE ADDRESS. General Electric Company Wilmington Manufacturing Department ATTN:

Mr. J. A. Long, General Manager P. 0. Box 780 Wilmington, NC 28401 i

ORGANIZATION CONTACT:

Mr. C. W. Doyle, Quality Audits and Customer Service Manager TELEPHONE:

(919) 343-5874 PRINCIPAL PRODUCT: Nuclear Fuel Assemblies and Core Hardware NUCLEAR INDUSTRY ACTIVITY: Major nuclear fuel, control rod, drive, jet pump, steam separator, hydraulic control unit and other BWR core hardware supplier for GE designed cores.

ASSIGNED INSPECTOR:

Me_*= 7

. kh_slI[

k/ 8/

William M. McNeill, Components Sei: tion 06te' OTHER INSPECTORIS)-

GL P

/!2 [J b0 APPROVED BY:

N v t

D. E. Whitesell, Chief, Components Section Date i

l INSPECTION BASES AND SCOPE:

A.

Bases: General Electric Topical Report NED0-11209-04.

B.

Scope:

Enrichment and impurity controls; moisture and hydrogen controls; l

control of nonconformances and corrective action; periodic management meeting and status of previous inspection findings.

l I,ESIGNATED ORIGINAL Certdied By l(Mlli 1

8109290604 810910 PDR GA999 ENVGENE 99900003 PDR

GENERAL ELECTRIC COMPANY ORGANIZATION: WILMINGTON MANUDCTURING DEPARTMENT WILMINGTON, NORTH CAROLINA REPORT NO.: 99900003/81-02 INSPECTION RESULTS:

PAGE 2 of 3 A.

VIOLATIONS:

None B.

NONCONFORMANCES:

Contrary to 07. Inspection Instruction 6.2.5.1, and Section 5 of the Topical Report, the fluorine, chlorine, carbon, and nitrogen samples used by the computer to calculate total impurities and boron equivalence were not always drawn from the same material as the metal impurity sample for gadolinium fuel.

C.

UNRESOLVED ITEMS:

Time did not permit verification that the material on Furnace Sheet 1573, which was suspected to have high hydrogen, was placed on hold in the Manufacttring Information and Control System (MICS) as required by pro-cedure P&P 70-34.

The material had been verified as acceptable and its status changed in the computer system (MICS).

Historical reconstruction of the previous status takes one or two days by the computer unit.

D.

STATUS OF PREVIOUS INSPECTION FINDINGS:

(0 pen) Nonconformance (81-01):

The applicable project code effectivity was not included in a material requisition ani its subsequent purchase order.

The translation of th? year and addenda requirements on equipment is currently under discussion with the ASME.

The details as to how the year and addenda are to be identified and subject to review and approval by the designer and customer is still undetermined.

General Electric will resolve this problem by its September 8-10, 1981, ASME survey.

E.

OTHER FINDIli3S OR COMMENTS:

1.

One pre'viously identified followuo item (81-01) was closed during this inspection.

Handwritten notes on Engineering Instructions (Els) were being used to identify changes to the year and addenda of the ASME code applicable to a project.

A review of a sample of 20 EIs found no further problem in this area.

2.

The isotopic and impurity sampling was verified ia gadolinium oxide fuel for conformance to procedures and specifications.

The enrich-ment identification systems, were verified a be in place.

A sample of eight fuel lots were traced.

As the Chem Lab analyzes material, results are fed into computer systems such as MICS, LMCS, and QATRACS and the acceptance status maintained in the computer system.

Acceptance of material in general is via a human operator and the computer.

The

~

GENERAL ELECTRIC COMPANY ORGANIZATION: WZLMINGTON MANbFACTUP.ING DEPARTMENT WILMINGTON, NORTH CAROLINA REPORT NO.: 99900003/81-02 INSPECTION RESULWi:

PAGE 3 ct 3 control of hydrogen is handled similarly.

Loaded fuel rods are off gassed and sample results piaced in the computer system.

Two fuel rod lots that had been off gassed were reviewed.

The use of cali-brated equipment and conformance to the qualified procedure were verified.

3.

The identification and status of nine open Inspection Reports (irs) were verified on fuel bundles.

The dispositions, rework, repair, and approvals of four closed irs on fuel bundles was verified.

Thirteen irs on powder, pellets, rods, and other hardware were reviewed. The processing end storage areas were inspected to serify conformance to procedures ter control of nonconforming material.

The Material Review Board as.tivity was inspected.

The CAR correctt,a action system was inspected as well as the product performance data system for the past year.

l l

l

PERSONS CONTACTED

' Company 4/

Dates d4 26-Z.9 hOddO3!TI-Of Inspecto Docket / Report No.

Page I of 3N NAMG Please Print)

TIT 1.E(Please Print)

ORGANijATION(PleasePrint)

Z R, Lieree/uo _-

QA For, G6 s

G. h.'. %w (3/14 (L. s. La

~

72, 4. Tive r smo '/&,1 f%,,,

J A.Lnm

&m J'e

+

t _E, A

/o-s l'3 4 Ilic/?-

M. E, Witesota Of N ANreyf2

+

'll. ). W A IL O S&S/) h 6-E, 2, 7FAdHEV

/?$. Sp.

.D.

/, $ E~A ?_6 9 8 EY/? hL'TRottr2 5 0. ONisMM AG.E-A,/d, & o T dd12 Spaa.

+

'E. 2, M6RLEY (2/?. 6 T il /2anrned AA&

4 L. A. S heev/

Puse o Aqn_

  • E.D. SuneR Voel(DQ E N\\e,e.

.i v

beAh b

I

- - - - - - - - - - ~

chet 50. M @ f Inspector s/I.j_

Report D.

ste-e t.

Scrpe/ Module h k 'fter-DOCUMENTS EXAMINED 1

2 TITLE /SUBJEC1_

3 4

/20 -317s C

E h i,xiceeiss

[aisreue:rivils P

3-ti-ti a

G 9-ifc-?f a

  • /7 9

/7/'f/2Ed77tF /W7/Oct Nd't/GST (0N2 )

3-PPI

~

d

&J/4/UtA!6 72VJ' /h?4;/7/017///R hf41/mif&tf

/

h?AloyK

[s JiVJ'i 0(

/U D525

/

/ TREY (/ BASK )

/2Ci)

/

? - 9 Yf*

llAT)ll)17

~2-($2AN o UM D:D$/M /2Cf hL/t=73 EL)

///RfE-/b0i (J 20/k 'GT (Otylti /~V (*rt?nRdHT/ cal T

z/t /8)

Y6 l9 3

/

ONCiVIE)~ t'dM T7)17ed diarTizot Mr7/!5 4

2-//20'

- 3'8 T

3Ec - Vn./

(Qt>4r i n '

Alo T7e M C

fl'zlic da c,

\\

Phoossr//92vsea c.'i)di?iirv /#An 3

s/clei i'

mh CDMi i ry' (%tr72et Ymwer?cn %rew.rreris 3

ilz bN' WIth7it 8

Exis.*OHi?Anf*

Aloric* r 7/z/TI'

31. L 3

P/zoower//h wa (%.1n!/?im - 06 &iewic t!)wiarrins 9

se-9-s'd Exh2 m orto>r

(/twixet Y 0.Y M

i l O, l~2lf~2 SCIJ Nf7&f?55/Al6 l7

/dNl$d n

3*22 G

0LL(2Y~ "$4A4Pt /A.k1 A1AJD ?F/ t*4h(E

[(D/l

/7

(;/tZ /3/

4/V 3

Feet /2c>o Ojruilssias c uo,,)

is 9/zs/so Document Types:

Columns:

1.

Drawing 5.

Purchas Order 1.

Sequential Item Number 2.

Specification 6.

Internal Memo 2.

Type of Document 3.

Procedure 7.

Letter 3.

Date of Document 4

QA Manual 8.

Other (Specify-if necessary) 4.

Revision (If applicable)

Inspector M-Docket flo. $800.7 Report flo. _(( _4 Scope / Module _ R _gdg -----

~

~~ ~

DOCUMEllTS EXAMl_ fled l

1 2

TITLE / SUBJECT 3

4 l

424 3

tXsz /~u Q pe n _ g rr w y a rr i0/sno l FUEL Roo oersassiL& ~ & ADOUCf n(;;d U )&(([SAMl':tNG AU0 (2GWp9:

5. 7,b>l 3

V~31c 0

4 A G~

[

\\

6.i.4 _

3 UCIT

&fR (c

$- 3-YC

_4,. I, %

3 FUEL o

'/

got2 7

6-224g ASOVPU GepcuatuM (Skroc:- (JunLugs Gn arE Su1R

/9 ksR /711 v,lg 3

Geum-Sese - G.aa RMwanner 4

_s-uta_

9 Cff 6As Fd2A!AdL=

ZWIA SNEETS 9

6> A D o c i n'11 S !A ri M E D lt:AJSDV W A 9

Cf7~ G n1 72'tX) 5 8 6 6 13 6

&Nocun)A fEGt-EnsE T//G~6?T

=

Document Types:

Columns 1.

Drawing 5.

Purchas Order 1.

Sequential 2 tem Number 2.

Specification 6.

Interr.a1 Memo 7.

Type of Document 3.

Procedure 7.

Letter s.

Date of Document 4.

QA Manual 8.

Other (Specify-if neces<ary) 4.

Revision (If applicable)

UUCk"l IIO-EYV###C Inspector L((

Report flo. ~ ypot Scope / Module ____#.8[8._/-___.__..__..

Pd9" /-

-Ub~"

"I 7_..

DOCUMENTS EXAMINE 0 l

l 1

2 TITLE / SUBJECT 3

4 w-C 3

N&cs /dvaar (#/P) 9 A

/

dn'w & &w /2n t (MP) 5

-3 Y

'si M Nke/ $dxbuf-

/_/ (0fh) 1 9g

- \\

1>b lu Macdm b7 Ndha-tIhs 4cfned[h

)_

40 - rF

\\

3 Top ik Sh - kM

/#_/f_)

2-o

__ %M; A-uw.Th.~t WE

& g 71 @T4 ham.3 1

    • - L306 W

N'-al N b

!*-u N C *--~A S M u 6 x QAS)f&

Z-

4. 9. Z 3

WP 63 uneirv Pc/>>>s

__ __2 3 Z./ 3 h

2_ __ _. _ ~

9 e,A.Tl q

r. 72.

L Document Types:

Columns:

1.

Drawing 5.

Purchas Order 1.

Sequential Item Thunber 2.

Specification 6.

Internal Memo 2.

Type of Document 3.

Procedure I.

Letter 3.

Date of Document 4.

QA Manual 8.

Other (Specify-if necessary) 4.

Revision (If applicable)