ML20010J060
| ML20010J060 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 09/23/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| Shared Package | |
| ML20010J061 | List: |
| References | |
| NUDOCS 8109290557 | |
| Download: ML20010J060 (2) | |
See also: IR 05000358/1981023
Text
.
.
h
$\\
SEP 2 a Igm d ' pl~e y/{[/p'M'h
ff
u
1\\
% Q p ( r('#!)
A
'
-
I '%e,[$"lgb%
~8
2
Docket No. 50-358
Q
'E
Ir ')
Cincinnati Gas and Electric
,/
s 4';s
. eV
Company
. cf/p'9fi},/
ATTN:
Mr. Earl A. Borgmann
,4
,
.'x
Senior Vice President
-
Engineering services and
Electric Production
139 East 4th Street
Cincinnati, OH 45201
Gentlemen:
This refers to the meeting held on August 19, 1981, at the Region III
office in Glen Ellyn, Illinois by A. B. Davis and others of this office
'
with H. R. Sager and others representing CG&E. The purposes of the
meeting were (1) to discuss CG&E plans to bring in an expertenced nuclear
maintenance contractor (Catalytic, Int.) to perform selected Engineering
Change Requests, punchlist items, and maintenance and (2) to request
partial relief from the 100% reinspection of all QC inspections performed
by contractors that is required by the NRC's Immediate Action Letter of
April 8, 1981.
The subjects discussed during the meeting are included in the Office of
Inspection and Enforcement Meeting Report which is enclosed with this
letter. As indicated in the report, Region III agreed with CG&E's plan
of action to monitor and control the work of Catalytic, Inc. and granted
the requested partial relief from the 100% reinspection requirement of
the April 8 Immediate Action Letter.
I
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
i'ablic Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
$
i{
8109290557 010923
PDR ADOCK 05000358
G
PDR.
. -
-
-
-
-
.
.
Cincinnati Gas and Electric
-2-
Company
- SEP 2 3 ton;
accompanied by an affidavit executed by the owner of the information which
identifies the document or part unght to be withheld, and which contains
a full statement of the reasons which are the bases fer the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the c>nsiderations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Y
R. L. Spessard, Director
Division of Resident and
Project Inspection
'
Enclosure:
IE Meeting
Report No. 50-358/81-23
cc w/ enc 1:
J. R. Schott, Plant
9uperintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power
Siting Commission
,
Citizens Against a Radioactive
'
i
Environment
{
Helen W. Evans, State of Ohio
1
ga[rd
RIII
RIII
RIII
tFN
tre
Dartels/jp
Warnick
Davis
Spe
9/16/81
f/24-
4/
.