Commits to Use of Westinghouse Criteria for Low Pressure Nuclear Turbine Disc Insp Set Forth in NRC .If Calcaluated Insp Interval Longer or Shorter than Scheduled Fuel Cycle,Westinghouse Guidance Will Be Sought
ML20010H844
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/22/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
References
546, NUDOCS 8109290347
Download: ML20010H844 (1)


Text

.

k[/,

'o Vinorn:A El.EC'rRIC AND POWER COMPANY h

P Rics Monn., VinointA 2n201

/;

s ogy eI# em c

' 3 c,/

g'Affp;. 7 4 c, b

so n.11.1.e 4 =n u no ScPtenber 22, 1981 g

vu. r..m

.r x m e.. o,.. m..

/

yg r

kiY Mr. Harold R. Denton, Director Serial No. 54 W Office of Nuclear Reactor Regulation N0/SGE:1ms Attn:

Mr. Robert A. Clark, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission

%F-7 Washington, D. C.

20555 Gentlemen:

CRITERIA FOR LOW PRESSURE NUCLEAR TURBINE DISC INSPECTION NORTH ANNA POWER STATION UNITS 1 AND 2 We have reviewed your letter dated August 31, 1981 and the attached safety evaluation report concerning Criteria For Low Pressure Nuclear Turbine Disc Inspection for North Anna Units 1 and 2.

We agree and commit to use this criteria for all future disc inspections at North Anna.

We also understand that this commitment will eliminate the need for Vepco to submit future inspection results to the staff or to transmit the computerized disc data sheets that are prepared by Westinghouse.

We would like to point out that if our calculated inspection interval is less than the scheduled fuel cycle, Vepco will seek Westinghouse's guidance on delaying the inspection until the refueling outage.

If the calculated inspection interval is longer than the fuel cycle, Vepco would also seek Westinghouse's guidance for scheduling this inspection at a later refueling outage.

Criterion No. 4 allows the inspection to be sooner or later (within limits acceptable to Westinghouse) than the calculated date so as to coincide with a scheduled outage.

If you have any questions or require additional information, please contact us.

Very truly yours,

$b R. H. Leasburg Vice President - Nuclear Operations cc:

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement f

gsI 0109290347 810922 PDR ADOCK 05000338 C