ML20010H833

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re GE 4.16 Kv Switchgear Containing Internal Wiring in Violation of Class Ie/Nonclass IE Separation Requirements.Ge Will Be Requested to Review Info & Determine Responsibility
ML20010H833
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/21/1981
From: Patterson E
BECHTEL GROUP, INC., BECHTEL POWER CORP.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-81-508-000 10CFR-050.55E, 10CFR-50.55E, PT21-81-508, PT21-81-508-000, NUDOCS 8109290333
Download: ML20010H833 (1)


Text

56,$fLQ NA4Q

.zGMd?5Akg Bechtel Power Corporation 9Y

! Engineers - Constructors 12400 East Imperial Highway Norwalk, California 90650 \' -

_ $dfSO C{N eo . rE ANNEX. LOS ANGELES. k September 21, 1981 97 g S(p ,W' ' < [p h Mr. Karl Seyfrit ) 24 f Director, Region IV Office of Inspection and Enforcement t.

?,

'C '

U.S. Nuclear Regulatory Commission y%"'ra9/cf /

611 Ryan Flaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

General Electric 4.16 KV Switchgear Containing Internal Wiring Which Violates Class JE/Non-Class 1E Separation Requirements

Reference:

Arizona Public Service 10 CFR 50.55(e) Raport dated September 18, 1981. Palo Verde Nuclear Generation Station, Units 1, 2 and 3

Dear Mr. Seyfrit:

On September 18, 1981, Arizona Public Service, PVNGS 1, 2 and 3, informed Mr. B. H. Faulkenberry, Chief Reactor Construction and Engineering Support Branch, of the subject deficiency.

Subsequent evaluation by the Bechtel Review Committee concludes that the condition is also reportable under 10 CFR Part 21. The Arizona Public Service report contains all the information required by Part 21 with the exception of the information required by 21.21(b)(3) VI as it is unknown to Bechtel.

General Electric will be advised by letter that the component as applied by Bechtel contains a substantial safety hazard defect and will be requested to review the information supplied by Bechtel and determine its responsibility for compliance to Part 21, Section 21.21(b)(3) VI.

Other Bechtel Divisions were advised of the defect by copies of appropriate reports and correspondence. Should it be determined that basic components with this defect are in use, have been supplied to or are being supplied for one or more other Bechtel projects, the affected Division will report the condition according to the Regulation.

Sincerely, BECHTEL POWER CORPORATION T6N g

RRL R. L. Pattersongpg W Manager of Division Quality Assurance do RLP:JHS:db 0109290333 810921' PDR ADOCK 05000528 S PDR