Interim Deficiency Rept Re Defective Ite Circuit Breakers, Initially Reported on 810828.Failure of 1600 Amp Type K-1600S & K-DON 1600S Breakers Occurred During Field Test Per IE Info Notice 80-31.Next Rept by 820122
ML20010H667
Person / Time
Site: Fermi, 05000452, 05000453  DTE Energy icon.png
Issue date: 09/26/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-54147, IEIN-80-31, NUDOCS 8109290052
Download: ML20010H667 (2)


Text

.

.. /).a8/cossJ Donald A. Wells QG mg  ? npas ^~~

Edison EEE!==

g31 =1 j% "

September 26,y1981 EF2-54147 f- /f f Mr. James G. Keppler, Director 8/> ' , y Region III

'[

  1. w, g8 U.S. Nuc1 car Regulatory Cmmission O Cd'ff,s N7 799 Roosevcit Road &  %$% [7, .y 3 Glen Ellyn Illinois 60137 \ (

Subject:

Interim Report of 10CFR50.55(e) Item on Defective ITE Ci Breakers (#47) bM.

Dear Mr. Keppler:

On August 28, 1981, Detroit Edison's Mr. H.A. Walker, Supervisor-Construction Quality Assurance, telephcwd Mr. J. Smith of NRC-Region III, to report on a probim with defective ITE Circuit Breakers.

This item involves 1600 AMP ITE circuit breakers. In order to address IE -

Information Notice 80-31 which was written on Gould-Brown Boveri 600 AMP breakers Detroit Edison had impicmented the recmnended field test proccdure. This test procedure was used to test, not only the 600 AMP breakers covered in che info 1+

mation notice, but other ITE Gould breakers as well. In testing I7E, 1600 AMP, Type K-1600 S and K-DON 1600S breakers, failures occurred on two breakers similar to the failure described in the referenced information notice.

This was not considered to be reportable at the time of discovery, since the information notice indicates the problem would only occur with the breaker in the test position. Subsequent investigation determined that this failure would also occur with the breaker in the fully connected (operating) position. Inves-tigation of this problem will continue, and the NRC will be kept informed of additional developnents.

Another report on this itm, either interim or final, is scheduled to be sent to you on or before January 22, 1982. If you have questions concerning this matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assur-ance.

Very truly yours, I

DAW / HAW /cp ,/ -

p"'/

5 do 0

a SEP 2 3 8%

J

q Mr. James G. Keppler, Director Septanber 26, 1981 Page Tt.o EF2-54147 cc: Mr. Victor Stello, Jr., Directo-Office of Inspection and Enfor,enent Division of Reactor Inspection Programs U.S. Nuclear Regulatory Cm mission Washington, D.C. 20555 Mr. Bnico Little, Resident Inspector U.S. Nuclear Regulatory Cmmission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166