Forwards IE Insp Repts 50-338/81-20 & 50-339/81-17 on 810606-26.No Noncompliance Noted
ML20010H389
Person / Time
Site: North Anna  
Issue date: 09/04/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20010H390 List:
References
NUDOCS 8109240414
Download: ML20010H389 (2)


See also: IR 05000338/1981020

Text

_

.

.,

- .

SEP

419M

k

i,

[Z!g( d % 'o

9 4E

Virginia Electric and Power Ccmpany

ATTN: Mr. R. H. Leasburg, Vice President

gj

t. ti>

'g'

y%'g/

Nuclear Operations

4

O

,

P. O. Box 26666

C

Richmond, VA 23261

ti, .

4

l

Gentlemen:

Subject:

Report Hos.k38/81 Mand 50-339/81-17

_

This refers to the safety inspection conducted by Mr. E. H. Webster of this

office on June 6-26, 1981, of activities authorized by NRC Operating License Nos.

NPF-4 and NPF-7 for the North kna facility and to the discussion of our findings

held with Mr. E. W. Harrell, Assistant Station Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within taese areas, the inspectin consisted of

selective examinations of procedures and representative recon .i. interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

Consistent with

office promptly)so that a new due date may be established.section 2.790(b (1), such a

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasone on the ! sis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified oeriods noted above, the report will be placed in the Public Document

Room.

5

/ ll

8109240434 810904

gDRADOCK 05000338

PDR

--

~

,

-

.

. _ _

-.

--.

.

e

'

'

SEP

4 1997

'

'

V! ginia Electric & Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

As/

Paul J. Kellogg, Chief

Project Branch 2, Division of

Resident and Reactor Project

Inspection

,

Enclosure:

Inspection Report Nos. 50-338/81-20

and 50-339/81-17

l

cc w/ enc 1:

J. H. Ferguson, Executive

Vice President

W. R. Cartwright, Station Manager

i

bec w/ enc 1:

,

'

0;cumer.t Management Branch

Comonwealth of Virginia

.,

1

!

RI

RII

RII

RII

,

M

otk:dt

HCDance

KL dis

PJK logg

8

/81

8

/81

8/ /81

8/g-f81

_

-

-

M