F.
.
L
,,
he419w
M 311NI
%cg /
Alabama Power Company
Q'g $ ~ %
, Q %
',.\\
ATTN: Mr. R. P. Mcdonald
b
u e [A-Q
9;
%
Vice President-Nuclear Generation
- kg
P. O. Box 2641
fj
cp
7
.
Birmingham, AL 35291
s
-
Q
Rh $ g$'
Gentlemen:
c6
gg
Subject.
Report No._
83and 50-364/81-21
%
This refers to the inspection conducted by Mr. W. H. Bradford of this office on
July 16 through August 15, 1981, of activities authorized by NRC License Nos.
NPF-2 and NPF-8 for the Farley facility and to the discussion of Our findings
held with Mr. W. G. Hairston, Plant Manager, at the conclusion of the
inspection.
This inspection was a comprehensive examination of your management and quality
assurance controls related to licensed activities.
Inspection was conducted in
selected key areas of responsibilty at both the plant site and your corporate
offices. Areas examined during the inspection and our findings e discussed in
the enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with cgard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the femmission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains an information that'you believe to be exempt from dis-
closure under 10 CFR 9.5(y)(4), it is necessary that you:
(a) notify this office
a
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such informa-
tion.
If your receipt of this letter has beea delayed such that less than seven
days are available for your review, please notify this office promptly so that a
new due date may be established. Consistent with section 2.790(b)(1), such
application nust be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
-CGol
S
/f/
l
8109240401 81083U
l
PDR ADOCK 05000348:
i
G
PDR:
l
I
r
.
.
"
'
AUG 311981
-
Alabama Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
Paul J. Kellogg, Chief
Reactor Projects Branch 2, Division
of Resident and Reactor Project Inspection
Enclosures:
Inspection Report Nos. 50-348/81-18
and 50-364/81-21
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairsten, III, Plant Manager
bcc: w/encls
NRC Resident Inspector
Document Management Branch
State of Alabama
RII:RRPI
RII:R I
RII:
d\\,0 /
\\l
WHBr3dfo
- gr
VLBFownlee
PJ'
logg
8/p/81
8/gV81
8/ /81
,
1
r ->
,