01 SEP 1981
y
O
%
Docket No. 50-309
.
kp[
h
's
Maine Yankee Atomic Power Company
8
ATTN: Mr. Robert H. Groce
-7'
-
d
Senior Engineer - Licensing
p
68 (,j
/
1671 W u. ester Road
M
g
Framingham, Massachusetts 01701
4
<
%
1) //g
s
Gentlemen:
Subject:
Inspection Report No. 50-309/81-16
This refers to the routine inspection conducted by Mr. J. C. Jang of tnis
office on July 21-24, 1981 at Maine Yankee Nuclear Power Station, Wiscasset,
Maine of activities authorized by NRC License No. CPR-36 and to the
discussions of our findings Sold by Mr. J. C. Jang with Mr. E. Wood and others
of your staff at the conclusion of the inspection.
Areas examinec' during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
b: addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements. The basic purpose of
these independent measurements is to verify your capability for analyzing
radioactive effluents, and to achieve and maintain comparable methods of
analyses between your facility and the NRC. The complete data from these
measurements will be reported in a subsequent Inspection Report.
'
Based on the results of this inspection, it appears that one of your
activities was not conducted in fell compliance wi d NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
This item
of noncompliance i.as been categorized into the 1svels described in the Federal
Register Notice (45 FI' 66754) dated October 7,1980. You are required to
respond to this letter and in preparing your response, you chould follow the
instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contracters)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify +.his office by telephone within ten (10) days from th
d@ / gwc
Tgob
POS
OS RI:0EPOS
ang
ores
Synpar
B g er
>
M
/24/81
-
8 3d FFICIAL RECChD COPY
j
O!N
.
-
-
-
-
-
- -
-
-
-
_-
.
.
.
.
Malce Yarnea Atomic Power Company
2
01 SEP 19; 1
8
Cate of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with secticn
2.790(b)(1), any such application must be accompanied by an affidavit executed
by the owner of the information which identiffes the document or part sougnt
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the fublic
Document Room. The ttlephone notification of your intent to request
withholding, or any request for an e< tension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Since: 61y,
Original signed by
Robert M. Gallo for:
Eldon J. Brunner, Chief,
Projects Branen #1, Division of
Resident and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-309/81-16
cc w/encls:
E. Wood, Plant Superintendent
E. W. Thurlow, President
J. H. Garrity, Director, Nuclear Engineering & Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maine
bec (w/encis)
Region I Docket Room (with concurrences)
Chief, Operational Support Sectinr. (w/o encis)
0FFICIAL RECORD COPY
!
m-
_
_
..