ML20010H222
| ML20010H222 | |
| Person / Time | |
|---|---|
| Site: | 05000124 |
| Issue date: | 08/17/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parkinson T VIRGINIA STATE UNIV., PETERSBURG, VA |
| Shared Package | |
| ML20010H219 | List: |
| References | |
| NUDOCS 8109240231 | |
| Download: ML20010H222 (2) | |
See also: IR 05000124/1981002
Text
r
-
,
. .
.
.,
.
/elloW
4 .
AUS 171981
Virginia Polytechnic Institute
and State University
ATTN: Dr. T. F. Parkinson, Director
Nuclear Laboratory
Blacksburg, VA 24060
Gentlemen:
Subject: Report No. 50-124/81-02
This rehrs to the routine safety inspection conducted by Mr. R. Butcher of this
office on August 3-7, 1981, of activities authorized by NRC Operating License No.
R-62 for the Nuclear Research Reactor facility. Our preliminary findings were
discussed with you and members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone withir ten days from the date of this letter of your
intention to file a reques for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established. Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the awner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimd that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The inforration
sought to be withheld shall be incorporated as far as possible into a separate
i
part of the affidavit.
If we do not hear from you in this regard within the
l
l
8109240231 810905
PDR ADOCK 05000124
,
G
,
- ~ -
-s-
- ,
a,
e
p,-.--,-
,,
-
, ,- -
,
- - - - _ _
- - . -
- - - - - - - - - - - - - -
---
.,
.
,
..
AU917 ggg,
l
Virginia Polytechnic Institute
2
'
and State University'
!
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
1
!
'
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-124/8'-02