ML20010H057
| ML20010H057 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/11/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Koester G KANSAS GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8109230094 | |
| Download: ML20010H057 (11) | |
Text
._
.x o
g
$EP 111981
$ ke D ZRosztoczy LB#1 Rdg PDiBenedetto DEisenhut MHaughey BJYoungblood Docket tio. Q N 50-4J2 GEdison bcc:
MRushbrook TERA SHanauer NRC/PDR Hr. Glenn L. Koester RVollmer L/PDR Q
Vice President - Nuclear TMurley NSIC
)
4 N[fQf&"
SI 5 Kansas Gas and Electric Company RMattson TIC 201 North Market Street RHartfield, MPA ACRS (16 4
Wichita, Kansas 67201 OELD 5
OIE (3)
Q SEP 151981 m ~-.
Dear Mr. Koester:
MReich (BNL) u.a.
7
Subject:
Request for Additional Information for the Review of the Wolf 4 ek t*
Plant, Unit 1 Regarding Seismic and Dynamic Qualification of
/
Equipment As a result of our continuing review of the Wolf Creek Plant, Unit 1 FSAR, he find that we need additional information to complete our evaluation. The specific information required is in the area of seismic and dynamic qualification of equipment and is presented in the Enclosure.
To maintain our licensing review schedule for the Wolf Creek Plant FSAR, we will need responses to the enclosed request by January 7,1982. The Seismic Qualification Rdview Team's (SQRT) scheduled site visit to Wolf Creek Unit 1 from 2/09/82 to 2/12/82 is based upon receipt of your complete and thorough response to the attached request one month before the planned visit.
In accordance with the procedure described under Q271.2WC of the: enclosure, we plan to select the eq0ipment to be reviewed within one week of receipt of your submittal. The schedule would then require you to provide the "Qualiff-cation Summary of Equipment" for the selected equipment within one week (or two weeks before th6 site visit).
If you cannot meet this date, please inform us within seven days after receipt of this letter of the date you plan to submit your responses so that we may review our schedule for any necessary changes.
Please contact Dr. G. E. Edison, Wolf Creek Licensing Project Manager, if you desire any discussion or clarification of the enclosed request.
Sincerely.
OSnAl s'g tad by Robed L. Tei!mco Robert L. Tedesco, Assistant Director 8109230094 810911 for Licensing PDR ADOCK 05000482 Division of Licensing
.A PDR
Enclosure:
As' stated cc:
See next page M
omer)
.. 1h...st...
- c...
. g..
ru;much GEdison y"s" BdYog blood RLTedes.c.g
^
~
]
4 9/j78
'5/U /81"'"" "5/)"f/81"'
.......... 3 NRC FORM 318 4tO<80) NRCM O240 OFFICIAL. RECORD COPY
' uS*o mo-*
- Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street P. O. Box 208 Wichita, Kansas 67201 cc:
Mr. Nicholas A. Petrick Ms. Wanda Christy Executive Director, SNUPPS 515 N.1st Street 5 Choke Cherry Road Burlington, Kansas 66839 Rockville, Maryland 20750 Eric A. Eisen, Esq.
Mr. Jay Silberg, Esquire Birch, Horton, Bittner & Monroe Shaw, Pittman, Potts & Trowbridge 1140 Connecticut Avenue, N. W.
1800 M Street, N. W.
Washington, D. C.
20036 Washington, D. C.
20036 Kansans for Sensible Energy Mr. Donald T. McPhee P. O. Box 3192 Vice President - Production Wichita, Xansas 67201 Kansas City Power and Light Company 1330 Baltimore Avenue P. O. Box 679 Kansas City, Missouri 64141 Ms. Mary Ellen Salva Route 1, Box 56 i
Burlington, Kansas 66839 Ms. Treva Hearne, Assistant General Counsel Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Mr. Tom Vandel Resident Inspector / Wolf Creek NPS c/o U.S.N.R.C.
P. O. Box 1407 Emporia, Kansas 66801 Mr. Michael C. Kenner Wolf Creek Project Director State Corporation Commission State of Kansas Fourth Floor, State Office Bldg.
Topeka, Kansas 66612 b
ENCLOSURE Request for Additional Infomation
- Seismic Qualification Review Team
~
271.0
' EQUIPMENT QUALIFICATION BRANCH 271.1WC-In accordance with the requirements of GOC 2 and 4 all safety-related
' equipment is required to be designed to withstand the effects of earth-
. quakes and dynamic loads from normal operation, maintenance, testing and postulated accident conditions.
GDC 2 'further requires that such equipment be designed to withstand appropriate combinations of the
(
effects of-normal and accident conditions with the effects of earthquake loads.
The criteria to be used by the staff to determine the acceptability of your equipment qualification program for seismic and dynamic loads are i.
IEEE Std. 344-1975 as supplemented b3 Regulatory Guides 1.100 and 1.92, and Standard Review Plan Sections 3.9.2, 3.9.3 and 3.10.
State the extent to which the equipment in your-plant meets these requirements and the above requirements to combine seismic and dynamic loads.
For equipment that does not meet these requirements justification will be 1
needed for the use of other criteria.
271.2WC To confirm the extent to which the equipment important to safety meets the. requirements of General Design Criterion 2 and 4, the Seismic Quali-f-
fication Review Team (SQRT) will conduct a plant site review.
For selected equipment SQRT will review the combined required response spectra (RRS) or the combined dynamic response,. examine the equipment conf'guration and mounting, and then determine whether the test or analysis which has been conducted demonstrates compliance with the RRS if the equipment was quali-fied by test, or the acceptable analytical criteria if qualified by analysis, 271.3WC-In order to select equipment types for a detailed review it is necessary to obtain a list of all equipment important to safety.
Equipment should be
' divided first by system then by component type. Attachment #1 shows a tabular format which should be followed to present the status summary of seismic and dynamic qualification of all equipment important to safety.
Attachment #2 shoss suggested categories of component type to be listed 3.
in Attachment #1.
Provide a complete set of floor response spectra identifying their applicability to the equipment listed in Attachment #1, After the information on Attachment #1 is received, a selection will be made of the equipment to be reviewed'by the site audit. Specilfic infor-mation on equipment selected for audit should be presented as shown on Attachment #3 which should be provided to the NRC.' staff two weeks prior to the plant site visit. The applicant should make available at the
- plant site for SQRT review all the pertinent documents and reports of,-
the qualification for the selected equipment. After the visit, the,-
i applicant should be prepared to submit certain selected documents -
_ and reports for further staff review.
The purpose of the site audit 15 to confirm the acceptability of the seOmic and-dynamic qualification of all equipment important to safety based on the revf ew of a few selected
- pieces.
If a number of '
4 i.
5
+
2-deficiencies are observed or significant generic concerns arise, the deficiencies should be removed for all equipment important to safety subject to confirmation by a follow-up audit of randomly selected items before the fuel loading date.
4
>l l
4 4
Y a
.O
=
+
l l-l :'
g
.w I
=
i A
H E
R AR R
.T OPC OSE..
LEPDO F R,% I N F
0 TTE AR NF D
OTe H
EG Ti O A
EC M
P NT O5 If TT A
N C
Y.D I
F L
I AT LA NA Q'
AT U
S
.j/I s!1l N
YD IL R N' C
T P
,DY N
YD I_
C E
I S
M i
DfTA E
MEP B
SI O
SU T
Y SU)
A T
TC T
I S
L N
A(
I A
T S
D T
I N
U P
A T
N YT O
ss ed I
RE AF T
dt N
MA A
oS 0
C MS C
l I
f USO F
P I
E OT A
N)
.C.
C T
1 N
L T
OT X
IN U
EB D(
NE E
T TA Q
I NR li N
AT OE T
E CR ID I
M IO Y
TR W
H FP C
IM E
AO A
LI C
D L
T A
N E
IE E
T UT O
FS I
A QN O
I IA F
E N
T TI I
CM A
G NO L
IP T
C D
ER A
t DU U
MI E
O AU K
L B
IP Q
NQ C
YE O
=
F D
D O
8 E
F D
C JO N
N E
A V
E T
C I
I P
M S
R O
S E
B N
I L
O E
S E
l J
T N
/
P G
O A
P U
S r
N S
N
,i Yu T
til U
Y LS B
T N
I AD D
T TL E
N SO I
A C
F U
T I
Q 0=
L l
A i/S U
Y PC Q
T U
T
=
I E
C RN lT E
G A
AW i
T NgP ETO CE N
AOA DSD L
E R
C O
T
.P M
M=u EM P
i L 1O t
I E
LSSE EC U
P A
U L
Q Y
N
,TF PT E
T 0NOE
- MO Ul R S
UH E
liR I
U C M
N C
T
=
0 A
yH N=
A H
U 5F T
C l
Tf i
IRhR S
T S
tSD4
- )A h
S AYNt A
S SSAI4 C
L N
A P
i
4 f
ATTACHMENT #2 EQUIPMENT CATEGORIES PUMPS:
MOTOR DhivE-TURBINE DRIVE VALVES:
MOTOR OPERATED HYDRAULIC
-PNEUt% TIC CHECK RELIEF FANS & DAMPERS:
f HANDLING & LIFTIflG EQUIPMENT:
ELECTRIC lOTORS:
GENERATdRS:
ELECTRIC DIESEL i
MOTOR CONTROL CENTERS:
SWITCH GEAR:
ELECTRICAL DISTRIBUTION EQUIPMENT POWER BUSES e
TRANSFORMERS BATTERY RACKS INSTRUMENTATION AND CONTROLS:
i,.
INSTRUMENT RACK 4
COMPUTERS
~
~
J.
DISPLAYS MES SENSORS
__,~ _ _. _. _ - -...... _. _
ATTACHMENT #3
?
i
- Scismic and~ Dynamic Qualification Summary of Equipment 1.
I.
Plant Name:
M:
1.
Utility:
PWR __
~ 2.
NSSS:
-3.
A/E:
Other II.
Component Name:
1.
Scope:
[ ] NSSS
[ ] BOP
[- ] Other-2.-
.Model Number:
Quantity:
3.
Size or Range:
4.
Vendor:
/
5.
If the component is a cabinet or panel, name and model Number of the devices included:
6.
Physical
Description:
I a.
Appearance:
b.
Dimensions:
3 c.
Weight:
l 7.
-Location:
Building:
Elevation:
o
'8.
Field Mounting Coaditions
[ ] Bolt (No.
Size
),
[ ] Weld (Length
)
[ ]
9.
Mounting Orientation [e.g., on floor, canti1Nvered,' suspended, etc.]
~
10.
a.
System in which located:
b.
Functional
Description:
c.
Is the equipment required for [ ] Hot Standby [ ]ColdShutdow[
[ ] Both
[ ] Neither
[ ] Other i
4
,,,-.m.m._
...:r.-....._...r,
11.
Pertinent Reference Design Specifications for Qualification Requirements:
a.
Seismic Input d.
Service Conditions b.
Hydrodynamic Load I put e.
Qualified Life c.
Fatigue Considerations.
III. Is Equipnient Available for Inspection in the Plant:
[ ] Yes
[ ] No
[ ] Partial or limited availability IV.
Equipment Qualification Method:
[ ] Test
[ ] Analysis
[ ] Combination of Test and Analysis Qualificatica Report *:
(No., Title and Date):
Company that Prepared Report:
Company that Reviewed Report:
Where Report is filed or available:
V.
Vibration Input:
1.
Loads considered:
a.
[ ] Seismic only b.
[ ] Hydrodynamic only c.
[ ] Vibrr. tion from normal operation d.
[ ] Combination of (a), (b), ahd (c) 2.
Method of Coa.bining RRS:
9
[ ] Absolute Sum
[ ] SRSS
[ ]
(other, specify) i 3.
Required Response Spectra ** (attach the graphs):
I
?
NOTE:
7 more than one report complete items IV thru VII for each report.
l
- If other than RRS is used, describe method.
f l
1 2
j'
.a.
4.
Damping Corresponding to RRS:
. Required Acceleration in Each Direction:
[ ] ZPA
[ ] Other (specify)
OBE S/S =
F/B =
V=
SSE S/S =
P/B =
V=
5.
Were fatigue effects considered?
[ ] Yes
[ ] No If yes, describe how they were treatEi in overall qualification program:
?
J VI.
If Qualification by Test, then Complete:
1.
[ ] Single Frequency
[ ] Multi-Frequency:
[ ] randem
[ ] sine beat
[ ]
2.
[ ] Single Axis
[ ] Multi-Axis
[ ] Independent axis
[ ] In phase motions 3.
Number of Qualifications Tests:
Frequency Range:
5.
Natural frequencies in Each Direction (Side / Side, Front /Back, Vertical):
S/S =
F/B =
__ V ' =
6.
Method of Determing Natural Frequencies 15-
[ ] Lab Test
[ ] In-Situ Test
[ ] Analysis 7.
TRS enveloping RRS using Multi-Free 'ncy Test
[ ] Yes (Attach TRS & RRS graphs)
[ ] No
- ~
3 l
8.
Maximum Input g-level Test:
OBE S/5 =
F/B =
V=
OBE S/S =
F/B =
V=
9.
Laboratory Mounting:
A.
[ ] Bolt (No.
, Size
)
[ ] Weld (Length
)
[ ]
B.
Orientation and Fixturing:
10.
Functional operability verified:
[ ] Yes
[ ] No
[ ] Not Applicable 11.
Test Results including modifi, cations made:
1 12.
Other tests performed (such as aging or fragility test, including results):
13.
Failure Modes (If appropriate
)
14.
Margins Available:
[ ] Input Spectrum
[ ] Fragility VII. If Qualification by Analysis, then complete:
1.
Method of-Analysis:
[ ] Static Analysis
[ ] Equivalent Static Analysis
[ ] Dynamic Analysis:
[ ] Time-History
-[
] Response Spectrum 2.
Natural Frequencies in Each Direction (Side / Side, Front /Back, t
Vertical):
S/S =
F/B =
V' =
3.
Model Type:
[ ] 3D
[ ] 2D
[ ] 1D
[ ] Finite Element
[ ] Beam
[ ] Close'd Form Solution
[ ] Other
~
4
J, i.
4.
.[
] Computer Codes:
frequency Range and No. of modes considered:
[ ] Hand Calculations 5.
Method of combining Dynamic Responses from Seismic and other
. Dynamic Loads:
[
]. Absolute Sun L ] SRSS
[ ] Other:
(specify) 6.
Damping:
OBE SSE Basis'for the damping used:
7.
Support Considerations in the model:
8.
Critical Structural Elements:
Governing Load or Response Seismic Total Stress A.
Identification Location Combination Stress Stress Allowable B.
- Maximum Allowable Deflection Max. Critical to Assure Functional Opera-Deflection Location bility 9.
Failure Modes:
10.
Margins Available:
[ ] Input Spectrum
[ ] Stress or Defle: tion 4
1 Op 9
l
/
r
/'
/
b 5
-._n a
e
--e n-s-