Forwards Responses to Action Items 5,7,9,11 & 16 Re Analysis of Facility Masonry Walls,In Response to IE Bulletin 80-11, Masonry Wall Design. Responses to Items 1,4 & 6 Will Be Submitted by 811001
Date released: 01/24/2020 Download: ML20010G963


Comparison Between Finite Element Plate Analysis & One Way Beam Action.
ML20010G998
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1981
From:
COMPUTECH ENGINEERING SERVICES, INC.
To:
References
Download: ML20010G998 (6)
Procedure to Account for Out-of -Plane Interstory Drift Effects on Masonry Wall Evaluation.
ML20010G992
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1981
From:
COMPUTECH ENGINEERING SERVICES, INC.
To:
References
Download: ML20010G992 (6)
Evidence of Voting on Bssc Ballot Item 5A/46.
ML20010G988
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1981
From:
COMPUTECH ENGINEERING SERVICES, INC.
To:
References
Download: ML20010G988 (8)
Justification of Using Plate Solution for Wall 3-1/1.
ML20010G981
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1981
From:
COMPUTECH ENGINEERING SERVICES, INC.
To:
References
Download: ML20010G981 (5)
Evaluation of Single Wythe Assumption to Represent Multiple Wythe Walls.
ML20010G974
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/30/1981
From:
COMPUTECH ENGINEERING SERVICES, INC.
To:
References
Download: ML20010G974 (4)
Forwards Responses to Action Items 5,7,9,11 & 16 Re Analysis of Facility Masonry Walls,In Response to IE Bulletin 80-11, Masonry Wall Design. Responses to Items 1,4 & 6 Will Be Submitted by 811001
ML20010G962
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 09/15/1981
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: CLARK R A, DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20010G962 (1)