Submits Leakage Rates of Sys Outside Containment,In Response to NUREG-0737,Item III.D.1.1.Internal Util Memo & marked-up to NRC Encl
ML20010G762
Person / Time
Site: Farley 
Issue date: 09/08/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
NRC
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.1.1, TASK-TM NUDOCS 8109220497
Download: ML20010G762 (6)


Text

r Mailing Addr0ss Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmir gham Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

R"CO:",*"'

Alabama Power the 50tAhern vitr(Tsc 5ystem September 8, 1981 Docl<et No. 50-364 m."1 I'$y I

t>

' sw

't Q U. S. Nuclear Regulatory Comission N

N N

Director, Nuclear Reance Regulation 7

Washington, D. C.

20555 Q

6

/

Attention: Mr. S. A. Varga g

1 2

  • s Gentlemen:

Joseph M. Farley Nuclear Plant - Unit 2 Leakage Outside Containment As required by NUREG-0737, item III.D.1.1 and the Joseph M. Farley Nuclear Plant Unit 2 Safety Evaluation Report, Supplement No. 5, the below listed leakage rates of systems outside containment are submitted.

The allowable leakage rate levels given are those levels at which Alabama Power Company feels additional investigation and/or further leakage re-duction would be advisable.

1.

Containment Spray System. Allowable leakage is 0.25 GPM, Unit 2 leakage is 0 GPM (3 drops / min.).

2.

High Head Safety Injection (CVCS System). Allowable leakage is 1.0 GPM, Unit 2 leakage is 0 GPM.

3.

Low Head Safety Injection (RHR). Allowable leakage is 1.0 GPM, Unit 2 leakage is 0 GPM.

4.

Containment Atmosphere Sample System. Allowable leakage is 100 SCCM, Unit 2 leakage is 16.7 SCCM.

5.

Sampling System. Allowable leakage is 0.25 GPM, Unit 2 liquid leakage is 0.0006 GPM.

Allowable VCT gas leakage determined by soap bubble (Snoop) leak check is 500 SCCM, Unit 2 leakage is 0 SCCM.

6.

Waste Gas System. Allowable leakage is 500 SCCM. Unit 2 leakage is 0 SCCM.

AoW 7.

All relief lines of systems covered under the leakage assess-3 ment program are sausfactory.

//

8109220497 810908 PDR ADOCK 05000364 p

PDR

/

~ Dir:ctor Nuclear R: actor R:gulaticn Septemb:r 8, 1981 U. S. Nuc1 car RSgulatory Comissicn Paga 2 U

If you have any questions, please advise.

Yours very t C620 F. L. Clayton, Jr.

FLCJr/ JAR:jc cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. J. O. Thoma Mr. W. H. Bradford I

i I

l ll-l 4

i f-l.

j intracompany Correspondenc3

/Gd"9

(

'r g

~

k Alabama Power i

subiect Review of Draft Letter 03 "'

August 19, 1981 FNP-81-1008 From W. G. Hairston, III To Mr. O. D. Kingsley, Jr.

At Farley Nuclear Plant In response to your letter NT-81-0471 (A4.02) dated August 12, 1981 we have the following recommendation.

Change the allowable leakage for Low Head Safety Injection (RHR) from 0.25 GPM to 1.0 GPM. The leakage assessment procedure results for this system were substantiated by the Operations Group performance of a surveillance test procedure (FNP-2-STP-9.0), "RCS Leakage Test", which lists its acceptance criteria as 5 1.0 GPM unidentified leakage and i 10.0 GPM identified leakage.

All other information presented in the draft letter appears appropriate.

If you have any questions, please advise.

SM~

~

M

i. Hairston, III

/

WGil/KBM:j h cc:

R. L. George File

(([4 'ge 2 0 ?!. j.,,

f 4

h

%w'Qo.,co,4'[% e w

s.

1

Intracompany

~-

Correspondenco V

Alabamalbwer NT-81-0471 (A4.02) subics Review of Draf t Letter tua August 12, 1981 rewn D. D. Kingsley, Jr.

to Mr. W. G. Hairston, III A

Nuc1 car Generation Attached for your review is the draf t letter.to the NRC on the linit 2 Leakage Outside Containment report. Please review and

~

provide cocinents to NETS by August 17, 1981.

If you have any questions, please contact Mr. J. A. Ripple at I

extension 6182.

O. D. King ey, Jr.

00KJr/ JAR:de Atuchment cc: Mr. R. L. George 1

o t

Malling Addtvis

.I,

Nabem. Ptmer company 600 Nor~a 18tti st'etI p-Post Office Box 2641 E#rrningharrt. Mabama 35293 Telephone 203 783-6o8I F. L. ciayton. Jr.

U=

l 0l C O T,7 "'

Alabama Power

~om,nenesiem August 17, 1981

(

Docket he. 50-364 Director Nuclear Reactor Regulation

~

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. B.' J. Youn'gblood Gentlemen:

Joseph M. Farley Nuclear Plant - Unit 2

,L_e_akage Outside Containm_ent. _

As required by NUREG-0737, item 111.0.1.1 and the Joseph H. Farley Nuclear Plant Unit 2 Safety Evaluation Report, Supplement No. 5, the belw listed leakage rates of systems outside containment are submitted.

The allwable leakage rate levels given are those levels at which Alabar.a -

Power Company feels additional investigation and/or review would be s

required.

. 1.

Containment Spray System. A'llowable leakage is 0.25 CPM, Unit 2 leakage is 0 GPM (3 drops / min.).

2.

High Head Safety Injection (CVCS System). Allwahle leakage is 1.0 GPM, Unit 2 leakage is O GPH.

3.

Low Head Safety Injection (RHR). A11wable leakage is 0.25 s

GPM, Unit 2 leakage is O GPM.

4.

Containment Atmosphere Sainple System. A11wable leakage is 100 SCCM, Unit 2 leakage is 16.7 SCCH, f)l)ou>AkW 5.

Sampling System. Allwa e Icakage is 0.25 GPH, Unit 2 Ifquid leakage is 0,0006 GPM.

VCT gas leakage detemined by soap bubble (Snoop) leak check is 500 SCCH, Unit 2 leakage is 0 SCCH.

6.

Waste Gas System. A11wable leakage is 500 SCCit, Unit 2 leakage is 0 SCCM, 7.

All relief lines of systems covered under the leakage assess-ment program are satisfactory.

e 3

ys

---e..

,.,,y

r

, ' - A

-~

--v i:

g..

Director, Nuclear Reae. tor Regulation August 17, 1981 ll. S. Nuclear Regulatory Connission Page 2 l

4 1

If you have any questions, please advise.

]

Yours very truly,

~

. ;p.-

F. L. Clayton, Jr.

inf FLCJr/ JAR:de cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr; J. P. O'Reilly Mr. J. O. Thoma

~