ML20010G645
| ML20010G645 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 09/14/1981 |
| From: | Mineck D IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20010G646 | List: |
| References | |
| DAEC-81-440, NUDOCS 8109220348 | |
| Download: ML20010G645 (1) | |
Text
,
Iowa Electric Light and Ibwer Company September 14, 1981 DAEC 440 h
/k Director, Office of Inspection and Enforcement 4
Sgpde 7 [ [~-7 U. S. Nuclear Regulatory Commission Washington, D.C.
20555
- e.,
- k7,fg*' CBf s,
Subject:
Monthly Operating Report 7.
\\;...,/ g,,g\\')f File: A-118d
Dear Sirs:
Please find enclosed 10 copies of the Duane Arnold Energy Center Monthly Operating Report for August,1981. The report has been prepared in accordance with the requirements of Regulatory Guide 1.16 and distribution has been made in accordance with Regulatory Guide 10.1.
Very truly yours, N
&)
Daniel L. Mineck Chief Engineer Duane Arnold Energy Center DLM/JVS/pl Enclosures cc:
D. Arnold Directorate of Inspection and Enforcement S. Tuthill V. S. Nuclear Regulatory Comission B. Peterson Region III J. Rehnstrom 799 Roosevelt Road L. Root Glen Ellyn, IL 60137 (1)
R. McGaughy P. Ward Director, Office of Management Information H. Rehrauer and Program Control E. Matthews U. S. Nuclear Regulatory Commission W. Bryant Washington, D. C.
20555 (2)
D. Mineck B. York U. S. Nuclear Regulatory Com;aission D. Wilson c/o Document Management Branch
-g,N R. Hannen Washington, D. C.
20555 (1)
A 3
D. Teply
/
Dennis Murdock
,/[
George Toyne NRC Site Inspector K. Eccleston N
hg*ol$Hg timid Essergy Cerner
- M Bos 351
- Cedar Rapids, Iowa 52406
- 319/851-5611 f
Pm a
_