ML20010G626

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 79-104/03L-2
Date released: 01/24/2020 Download: ML20010G626


Updated 79-104/03L-2:on 791206 & 07,during Flow Rate Testing HPCI Turbine Isolated.Caused by High Steamline D/P Due to Spurious Input Signals to HPCI Turbine Isolation Logic Circuitry from Switches 2-E41-dPIS-N004 & N005
ML20010G638
Person / Time
Site: Brunswick 
Issue date: 09/08/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G638 (2)
Forwards Updated LER 79-104/03L-2
ML20010G625
Person / Time
Site: Brunswick 
Issue date: 09/08/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010G625 (1)