ML20010G283

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-483/81-19 on 810812-14.No Noncompliance Noted
ML20010G283
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML20010G284 List:
References
NUDOCS 8109150522
Download: ML20010G283 (2)


See also: IR 05000483/1981019

Text

o

,

M'g

i Er /*

<:

4

%:>g$

Auti 3 1 mW

/

/ )

%

--

-N

,/

)Q

Docket No. 50-483

N, .

Q ff

Q

Union Electric Company

6g

,

ATTN:

Mr. John K. Bryan

4

g

Vice President - Nuclear

(.n

D

Post Office Box 149

St. Louis, M0 63166

Gentlemea:

This refers to the routine safety inspection conducted by Mr. W.

T. Key of

this office on August 12-14, 1981, of activities at Callaway Plant, Unit 1,

authorized by NRC Construction Permit No. CPPR-139 and to the discussion of

our findings with Mr. R. L. Powers and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terview.= with personnel.

No items af noncompliance w' h NRC requirements were identified during the

course of this inspection.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

j

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

'

(

withholding; and (b) submit within twenty-five (25) days from the date of

j

tais letter a written application to this office to withhold such infor-

l

mation.

Section 2.790(b)(1) requites thct any such application must be

,

accompanied by an affidavit executed by the owner of the information which

l

identifies the document or part sought to be withheld, and which contains

'

a full statement of the reasons which are the bases for the claim that the

infonnation should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

TW

l

.5

,

l

//

8109150522 810831

PDR ADOCK 05000483

G

PDR

L

..

O'

,

Union Electric Company

-2-

dh$ 3 y gg

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified pe ciods noted

above, a copy of this letter and the enclosed inspection repe z

will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N"

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-483/81-19

cc w/ encl:

W. H. Weber, Manager

Nuclear Construction

DMB/ Document Control Derk (RIDS)

Resident Inspector, RIII

Region IV

K. Drey

Ronald Fluegge, Utility

,

l

Division, Missouri Public

Service Commission

!

,

l

RIII

.RIII

RII

RIII,

RIII

l

,

sr

ey

Da te on

in

il .ams

ore ius

i 8/26/81

$

8/28

'

l

.,

. . _ , , _ - _ . _

_ , . _ .

, . . . . - . . _ .

_, ,

.

.

~ , , _ , , _ _

..