Submits Special Rept Re 800705 & 06 Challenges to Power Operated Relief Valve PCV-2455C,during Performance of Special Low Power Test Program.Inclusion of Events on Monthly Rept Is Inappropriate
ML20010G137
Person / Time
Site: North Anna 
Issue date: 08/26/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
509, NUDOCS 8109150374
Download: ML20010G137 (2)


Text

-_ __

JC' A

i

\\b VINGINIA ELucrHIC AND POWER COMPANY RIcitMONU, VinotNIA 20 261

,;j q~>. O q R. H. Laamunao August 26,:1981 Vars Pusannent Nrca. man oramartown Mr. James P. O'Reilly, Director

'1,[f b[%

Serial No. 509 Office of Inspection and Enforcemen N0/DCW:rhh U. S. Nuclear Regulatory Commissio Docket No. 50-339 Region II Q "

'~

's\\

License No. NPF-7 101 Marietta Street, Suite 3100 9-Atlanta, Georgia 30303 C

5 [i' 1 4 1981 *- ~

i U b TU"[ y N

,j/

j ifo (/

Dear Mr. O'Reilly:

p1 y

3 SPECIAL REPORT During the special low power test program for North Anna Unit 2, authorized by the Nuclear Regulatory Commission on July 3,

1980, PORV PCV-2455C was challenged a total of four times.

As described in our " Natural Circulation Test Report" which was forwarded to you on July 22, 1980, via letter Serial No. 648, the first three challenges occurred on July 5, 1980 during the performance of Special Test 2-ST-8, " Natural Circulation Verification."

The fourth challenge occurred on July 6, 1980 during the performance of Special Test 2-ST-9, " Natural Circulation with Simulated Loss of Power Conditions."

A deviation report was initiated for these challenges.

These challenges occurred at a time when applicable reporting requirements had not been established.

In response to NUREG 0660, TMI Action Plan Item II.K.3.3, in a letter Serial No. 560, dated June 30, 1980, we stated that a program was being established to identify, record, and report failures of or challenges to power-operated relief valves or safety valves.

In a letter dated July 22, 1980, Serial No. 645 we proposed changes to the North Anna Unit i

2 Technical Specifications to provide annual reporting requirements for such an event. When NRC issued the Full Power License and Technical Specifications on August 21, 1980, challenges to PORVs and/or Safety Valves were included as part of the Monthly Operating Report requirements.

In that the reporting requirements were not firm at the time of the events, the deviation report identifying the events was classified as an annual l

report.

Following examination of the matter we have determined that it would not be appropriate to include this in a monthly report but that it should rather be reported as a special report. As stated above the NRC was informed about the challenges in a timely manner; however, this special report should serve to close this matter.

p J

t

,/,

FPICIAL COPY 8109150374 810826 DR ADOCK 05000339 PDR

.)

l VikGINIA EtecTRIC AND Powra Coup 4xv ia Mr. James P. O'Reilly Page 2 This report has been reviewed by the Station Nuclear Safety and Operating Committee and will be forwarded to Safety Evaluation and Control for their review.

Very truly yoursl

/

b/

R. H. Leasburg cc: