ML20010G129

From kanterella
Jump to navigation Jump to search
Forwards Update on Util Compliance W/Nrc 810710 Order Re post-TMI Requirements.Each Issue Listed in Order Addressed
ML20010G129
Person / Time
Site: Farley 
Issue date: 09/09/1981
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-1.A.2.1, TASK-1.C.1, TASK-1.C.5, TASK-1.C.6, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.D.1, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-2.F.2, TASK-2.K.2.10, TASK-2.K.2.13, TASK-2.K.3.02, TASK-TM NUDOCS 8109150366
Download: ML20010G129 (7)


Text

M;iling Addrin Alabama Power Company 600 North 18th Street Post Office Box 2641 B rmingham, Alabama 352S1 Telephone 20$ 783-6081 F. L. Cf ayton, Jr.

R " ' n % d*"'

Alabama Power o

g e e suunem ewn>c sc:em Septe.noer 9,1931 Docket No. 50-348 4

g o

p FN

$ 1) i J

Director, Nuclear Reactor Regulation l

U. S. Nuclear Regulatory Connission lg 8EP I 41981 > @

Washington, D. C.

20555 84 Q

Attention: Mr. S. A. Varga Gentlemen:

July 10, 1981 NRC Order for Unit 1 TMI Requirements On July 10, 1981 the NRC issued an order confirming Alabama Power Company's commitments on Post-TMI related issues. These connitments were derived from Alabama Power Company's submittals of January 14, February 5, February 9, February 13, February 23 and February 23, 1981.

Alabama Power Company hereby provides an update on our compliance with the NRC order by addressing each of the items identified in the order. is a listing of our responses to these items.

If you have any questions, please advise.

Yours very truly, r.

FLCJr/ JAR:jc Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford loh l

1 1

i bt \\

8109150366 810909 DRADOCK05000g

j ENCLOSURE 1 Impl/ Doc APCo Response item Title Applicability Specific Reoutrement Subm Due Dates Let*

Date Remarks I.A.l.1 STA ALL (a) Provide STA coverage by 1/1/81 2/5/81 STA coveraoe provided; degreed individuals individuals trained.

(or equivalent), trained to licensee's program.

(b) Submit description of 1/1/81 2/5/81 Description provided; current training program ccmpliance demonstrated, and demonstrate compliance with 10-30-79 letter (c) Submit. description of long 1/1/81 2/5/81 Description provided, term training program.

I.A.2.1 Reactor Operator ALL Submit description of and implement 8/1/80 7/10/80 Descriptivo provided; Oualification Upgraded Training Program.

1/14/81 program implemented.

I.C.1 Accident Procedures ALL (a) Submit reanalyses of inadequate 1/1/81 1/14/81 APCo will upgrade core cooling and propose guide-W.0.G.* letter procedures and training lines for emergency procedures.80-179, per available W.O.G.

OR propose schedule and justify 12-15 40 guidelines, if delays.

necessary, by the end of the third Refuel Outage (2-1-82)

(b) Submit reanalysis of transients 1/1/81 1/14/81 W.O.G. response provides and accidents for emergency W.O.G. letter reanalysis and schedule.

procedures, OR propose schedule 80-179, and justify delays.

12-15-80 I.C.5 Feedback of Operating Experience ALL Implement procedures for feedback 1/1/81 1/14/81 Procedures implemented.

of operating experience (no documentation submittal is required).

I.C.6 Correct Performa.nce ALL Implement procedures to verifv 1/1/81 2/5/81 Procedures implemented.

or Operating Activities correct perfons.m 1 of operatinq activities (no ca;amentation submittal is required). j

I k

e s

~

ENCLOSURf 1 (cont'd)

Page 2

'Impl/ Doc APCo Response

. tem Title Applica'llity Speciffr_Reguirement Subm Due Dates letter Date Remarks a

II.B.2 Shielding ALL (a) Have available design 1/1/81 2/23/81 APC0 has completed all details for vital area shielding modifications modifications, except the electrical disconnect modification and relocation of the electrical penetration roon door. These modift-cations require a plant outage to implement and will be completed by the '

NUREG-0737. II.B.2 specified date of July 1, 1982.

(b)Submittechnical 1/1/81 2/23/81 Details available; deviations to staff deviations provided, positions.

II.B.3 Post-Accident ALL Submit description of 1/1/81 1/14/81 Description provided.

Sampling deviations from staff positions.

II.B.4 Training to ALL (a) Have available for review 1/i/81 2/9/81 Program provided.

Mitigate Core a training program for Damage mitigating core damage (no documentation submittal required).

.(b) Implement trainino program 4/1/81 2/9/81 APCo will complete (no documentation submittal training program for requitad).

mitigating core damage by 10/1/81.

- ~ _ -

i ENCLOSURE' 1 (cont'd)

Pcge 3 4

' In.

APCo Response

.e Letter Date Remarks item Title Applicability Specific Requirement Subm D.

.i 4

APCo is po t of EPRI test I

II.D.1 Performans ALL (a) Submit test program 7/1/80 (PWR's) 6/25/81 e

Testing of (both BWR/PWR's) 10/1/80(RuR's) pr,ogrcm.

RV/SRV's (b) Submit qualification 1/1/81 6/25/81 A documented report (prepared by EPRI) Nill program for PWR's block be submitted by April, valve.

1982 based on existing data to satisfy this requirement.

II.E.1.2 f.ax Feed PWRs (a) Submit final design and 1/1/81 2/9/81 Design and documentation Initiation documentation on safety provided.

and Flow grade flow indication.

(b) Submit final design and 1/1/81 2/9/81 Design and documentation documentation on safety provided.

grade ilow initiation.

1 I

j II.E.4.2 Containment ALL (a) Submit documentation justifwing 1/1/81 2/13/81 Documentation provided; setpoint set to 4.0 psig j

! solation-minimum containment pressure on 7-1-81.

setpoint for isolation of non-

~

essential penetrations.

i (b) Submit statement that purge.

1/1/81 2/09/81 To be installed at next ref ueling outage af ter valves not meeting CSB 6-4 i;

(or interim position) are receipt of valves (April, 1982); currently scheduled sealed ar.d verification is for the fourth refueling performed every 31 days.

outage (3-25-83).

i Additional information to be provided 9-25-81 as i

required by 8-5-81 NRC letter.

1 4

2 I

J

ENCLUSUR'E l' (cont'd)

Pagn 4 Impl/ Doc APCo Response Item Title Applicability Specific Requirement Sybm Due Dates Letter Date Remarks II.F.1 Post-Accident ALL (a) For noble gas monitor and 1/1/81 2/13/81 Description submitted Monitoring iodine / particulate sampling (2-13-81) for additional and analysis submit descrip.

accident monitors which tior. and justification for includes de..ations.

4 de 1ations from staff APC0 wall install the requiren.;nts.

Atmospheric Relief Radiation Monitors (RE-60 A, B, C, D) during (the third Refuel Dutage 2-1-82) due.o unacceptable working c

conditions on the Aux Building roof at power.

2 (b) llave available the final 1/1/81 2/13/81 See above design information for noble gas monitor and todine/

particulate sampling and analysis.

II.F.2 Inst. for Inadequate ALL Submit a report detailing the 1/1/81 6/11/81 Report submitted 6-1-81 Core Cooling planned instrumentation system 6/1/81 for monitoring inadequate core

cooling, j

II.K.2.10 Antic. Trip on B&W Submit final design for 1/1/81 N/A N/A (B&W)

LOFW and TT anticipatory trip as described in NUREG 0737.

II.K.2.'13 Thermal Mechanical Report B&W Submit report on effects of 1/1/81 1/14/81 W.O.G. response submitted Hi Pressure Injection on W.O.G.81-138, report 4-1-81.

i vessel integrity for SB LOCA 4/1/81 with no Aux Feedwater.

+

i I

LUtITU T

ENCLOSURE 1(cent'd)

Impl/ Doc APCO Response Item Title Applicability Specific Requirement Subm Due Dates Letter Date Remarks II.K.3.2 PORV/SV Failures PWR Submit report on SB LOCA and 1/1/81 jjj4fgj R Qort submitted 3-13-81 prooability of failure of WCAP-9804*

PORV/SV/RV.

3/13/81 II.K.3.3 SRV/SV failures ALL Submit report (historical and 1/1/81 1/14/81 Is submitted as part of.

& Challenges annually theraafter) of SRV/SV monthly opera *.ing report.

failures and challenges.

!I.K.3.7 PORV Opening B&W Subr.it report.on the probability 1/1/81 N/A N/A (B&W)

Probability of i PORV opening during an over-pressurization transient.

II.K.3.9 PID Controller Selected W-Modify the Proportional Integral 12/1/80 6/26/i0 PID Controller Modification plants Derivative Controller (as recommended derivative set a 0.

by W). Advise NRC'when modification is completed.

II.K.3.12 Anticipatory Trip W

Submit confirmation of Anticipatory 1/1/81 6/26/80 Confirmed.

on Turbine Trip Trip. If not currently implemente.1, submit modification desigi and schedule for implementation.

II.K.3.13 Separation of itPCI/RCIC BWRs w/HPIC/

Submit results of evaluation and 1/1/8f N/A N/A (BWR)

Initiation Levels; Auto RCIC proposed modification as appropriate Restart of RCIC

!!.K.3.16 Reduce 8,hallenges BWR Submit report on actio9s planned to 4/1/81 N/A N/A (BWR) to W's reduce RV challenges.

!!.K.3.17 ECCS System Outages ALL Submit repo.. on ECCS outages and 1/1/81

?/'3/81 Report submitted 2-13-81 propose changes to reduce outages.

II.K.3.18 ADS Logic BWR Submit report of feasitality of 4/1/81 N/A' N/A (BWR)

Modification ADS system logic changes to elirinate need for manual actuation.

II.K.3.21 CSS /CPCI Restart BWR Submit report of evaluation, proposed 1/1/81 N/A N/A (BWR) modifications and analysis to satisfy staff positions.

9

9 ENCLOSURE 1 (cont'd)

Pag 2 6 Impl/Coc

.VCo Response Item Title Applicability Specific Requirement Subm Due Dates Letter Date Remarks II.K.3.22 RCIC Saction BWR w/IMIC Implement procedure and document 1/1/81 N/A N/A (BWR) verification of this change II.K.3.27 Conunon Reference for BWR Implement change and submit 1/1/81 N/ '.

N/A (BWR)

H2O Level Instruments documentation of changes.

II.K.3.29 Isolation Bk';t w/ICs

, bmit evaluation of I.C.

4/1/81 h.

N/A (BWR)

Condensor pei u wance.

Performance

)

II.K.3.30 SB LOCA Methods ALL Submit outline of program 11/15/80 Westinghouse 9/26/80 Outline submitted 9-26-80.

for model.

(NS-TMA-2318) 1 l

II.K.3.44 Fuel failure BWR Submit evaluation to verify 1/1/81 N/A N/A (BWR) no fuel failure.

1 It.A.C.45 Manual Depressur-BWR Sutanit evaluation on other 1/1/81 N/A N/A (BWR) i ization than ADS method for

}

depressurization.

III.D.3.3 Improved inplant AL L Have available means to 1/1/81 1/14/81 System proven to be j

fodine Monitoring accurately measure airborne functional and procedures 4

radiolodine inplant during for calibration and j

an accident.

operation available.

III.D.3.4 Control Rooia ALL

a. Submit control room 1/1/81 6/26/80 Evaluation submitted Habitability habitability evaluation 6-26-80 a

information.

i

b. Submit modifications 1/1/81 6/26/80 Modification not necessary to assure CR required.

habitability with a schedule for completion, t

1 1

3 t

i 0

9

-