ML20010G120

From kanterella
Jump to navigation Jump to search
Notifies That Proposed Revision 19 to CE-1-A Is Acceptable, Subj to Listed Conditions
ML20010G120
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  
Issue date: 08/20/1981
From: Haass W
Office of Nuclear Reactor Regulation
To: Swartz E
COMMONWEALTH EDISON CO.
Shared Package
ML17252A633 List:
References
NUDOCS 8109150356
Download: ML20010G120 (1)


Text

.

f A Ctc UNITED STATES

/

\\'

NUCLEAR REGULATORY COMMISSION ID #q ' )

WASHINGTON, D. C. 20555 g-n -j.. m ojs a

AUG 2 01981 Mr. E. Douglas Swartz Nuclear Licensing Administrator Commonwealth Edison Company P.O. Box 767 Chicago, IL 60690

Dear Mr. Swartz:

SUBJECT:

PROPOSED REVISION 19 TO CE-1-A Your letter to me of Aug;st 7,1981, submitted pages 2-2 and 2-6 dated August 6, 1981, Revision 19 to the topical report CE-1-A describing the Commo Quality Assurance Program.

To follow Revision 15 of page 2-1, page 2-2 should have the following words 1) added at the top of the page:

... Edison commits to ccmply with 10 CFR Part 21

" Reporting of Defects and Noncompliance, with the Regulatory Position of the following Regul a tory...."

The list of Regulatory Guides for LaSalle, Byron, and E,raidwood Nuclear Power 2)

Stations should include Regulatory Guide 1.144-Rev.1.

3) The conditions of my letter of July 17, 1981 regarding the acceptance of Revision 18 of the report.

Please transmit 40 copies of Revision 19 to the NRC with this letter attached.

Sincerely,

/(, a 4 y -

  • t" alter P. Haass, Chief Quality Assurance Branch Division of Engineering u

?

I 8109150356 810827 gDRADOCKO$000010 PDR

.._ _._ )