Enclosure i.a Serial: RSEP/81-1531 Page 1 of 3 OPERATING DATA REPORT DOCKET NO.

50-261 DATE 810902 CO.\\lPLETED lW M-Untford TELEP110NE _(Boll 183-4524 OPERATING STATUS

1. Unit Name:

H. B. Robinson Unit Two Notes There ace presently 113

2. Reporting Period:

810801.0000/810831.2400 spent fuel assemblies in

3. Licensed Thermal Power (5th t):

2300 the spent Iael pit.

4. Nameplate Rating (Gross 31We):

739

5. Design Electrical Rating (Net SlWe):

700 700

6. Staximum Dependable Capacity (Gross SIWE):

665

7. Staximum Dependable Capacity (Net SIWE):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

No change

}

i

9. Power Level To which Restricted.lf Any (Net SlWel:

310

10. Rrasons For Restrictions. lf Any: Althouzh the unit is not restricted by an" outside acency. the power level is oresentiv reduced due to steam cenerator considerations.

4 This.\\lonth Yr.-to-Date Cumulatise i1. Hours in Reporting Period 744 5831 91.997

12. Number Of Hours Reactor Was Critical 0

4301.24 70.066.52 0

107.42 1085.30

13. Reactor Resene Shutdown Hours
14. Hours Generator on-Line 0

4216.41 68.375.23

15. Unit E-serve Shutdown Hours 0

0.00 23.20 0

9,083,339 140.295.713

16. Gross Therm.; inergy Generated (31WH) 0 2,883,158 45,221,925
17. Gross Electrical Er.ergy Generated (SIWH)
18. Net Electrical Energy Generated (SlWH)

-7058 2,725,152 42,841,604

19. Unit Senice Facto.

0 72.31 74.32 0

72.31 74.35

20. Unit Availabilii, ractor 0

70.28 70.03

21. Unit Capacity Factor (Using 51DC Net 1 0

66.77 66.53

22. Unit Ccpacity Factor (Using DER Net)
23. Unit Forced Outage Rate 100 18.79 14.19
24. Shutdowns Scheduled Oser Neu e Stonths tT.spe.Date,and Duration of Each):

A two-day test outane is planned but not yet scheduled. A Refueling / Maintenance Outnce is tentatively ninnned within six m nths.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

September 01, 1981

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI \\ L CRITICA LITY INITI A L ELECTRICITY CONI \\lERCI A L OPER ATION 8109150216 810910 PDR ADOCK 05000261 (9/77 :

R PDR

, u. uDh a

Page 2 of 3 50-261 UNITSl8U1 DOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAMF. 11. B. R binson Two DATE 810902 REPORI MONTil August COMPLETED BY M. Watford TELEPilONE (803) 383-4 M i

r i

3 3g 3

$ E 5' Licensee

,E n,,

{ *,,,

Cause & Corrective No.

Date i

~g 4

js5 Event

~g Q

Action to g',

$5 5

gg Repori e in U H

.. vent Re'currence 6

r,~

07-03 810730 F

744 A

1 CJ llTEXCII Contint2ation of outage initiated during July. Shutdown for steam generator tube inspection and repair.

L ~

l 2

3 4

F: Forsed Reason :

Method:

Exlubit G - Instructions S: Scheduled A l'quipment Failure (Explain) 1-Manual for Preparation of tnia Il-Maintenance or Tese 2-Manual Ssram.

Entry Sheets for Lieersee C Refueling

3. Automatic Scram.

Event Report t LER) File (NUREG-D-Regularory Restriction 4-Other ( Explain) 0161) 1:-Operator Training & Ueense Examination F-Administratne 5

G-Operatioaal E:ror IExplain)

Eshibit !. Same Source P8/77)

Il-Other ( E splain) t e

Page 3 of 3 6

stVERACE DAILY UN!T POWER LEVEL 50-261 DOCKET SO.

II. B. Robinson Two UNIT 810902 DATE M. Watford COMPLETED BY (803) 383-4524 TELEPHONE August MONTI! --

DAY AVEn cr 9,yty pot.,rg te,...g DAY AVER AGE DTILY POWER LEVEL (5!We. Net )

(51We Net)

-13

-4 17

-8

-5 jg

-5 3

-7

-4 4

20

-6

-4 5

7j

-5

-4 6

22

~0

_g 7

-5

-14 24

-4 9

~

-21 10 y

-5

-21 1j 27

-5 12 l

-4

-23 29 1

-24 I4 30 f

-5

-23 1'

15 3,

-5 16 l

l l

l INSEUCTIONS On this format.!!st the ac ay daily umt power leve!in MWe Net for each day in the reporong month. Compute to l