Enclosure i.a Serial: RSEP/81-1531 Page 1 of 3 OPERATING DATA REPORT DOCKET NO.
50-261 DATE 810902 CO.\\lPLETED lW M-Untford TELEP110NE _(Boll 183-4524 OPERATING STATUS
- 1. Unit Name:
H. B. Robinson Unit Two Notes There ace presently 113
- 2. Reporting Period:
810801.0000/810831.2400 spent fuel assemblies in
- 3. Licensed Thermal Power (5th t):
2300 the spent Iael pit.
- 4. Nameplate Rating (Gross 31We):
739
- 5. Design Electrical Rating (Net SlWe):
700 700
- 6. Staximum Dependable Capacity (Gross SIWE):
665
- 7. Staximum Dependable Capacity (Net SIWE):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
No change
}
i
- 9. Power Level To which Restricted.lf Any (Net SlWel:
310
- 10. Rrasons For Restrictions. lf Any: Althouzh the unit is not restricted by an" outside acency. the power level is oresentiv reduced due to steam cenerator considerations.
4 This.\\lonth Yr.-to-Date Cumulatise i1. Hours in Reporting Period 744 5831 91.997
- 12. Number Of Hours Reactor Was Critical 0
4301.24 70.066.52 0
107.42 1085.30
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator on-Line 0
4216.41 68.375.23
- 15. Unit E-serve Shutdown Hours 0
0.00 23.20 0
9,083,339 140.295.713
- 16. Gross Therm.; inergy Generated (31WH) 0 2,883,158 45,221,925
- 17. Gross Electrical Er.ergy Generated (SIWH)
- 18. Net Electrical Energy Generated (SlWH)
-7058 2,725,152 42,841,604
- 19. Unit Senice Facto.
0 72.31 74.32 0
72.31 74.35
- 20. Unit Availabilii, ractor 0
70.28 70.03
- 21. Unit Capacity Factor (Using 51DC Net 1 0
66.77 66.53
- 22. Unit Ccpacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 100 18.79 14.19
- 24. Shutdowns Scheduled Oser Neu e Stonths tT.spe.Date,and Duration of Each):
A two-day test outane is planned but not yet scheduled. A Refueling / Maintenance Outnce is tentatively ninnned within six m nths.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
September 01, 1981
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI \\ L CRITICA LITY INITI A L ELECTRICITY CONI \\lERCI A L OPER ATION 8109150216 810910 PDR ADOCK 05000261 (9/77 :
R PDR
, u. uDh a
Page 2 of 3 50-261 UNITSl8U1 DOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAMF. 11. B. R binson Two DATE 810902 REPORI MONTil August COMPLETED BY M. Watford TELEPilONE (803) 383-4 M i
r i
3 3g 3
$ E 5' Licensee
,E n,,
{ *,,,
Cause & Corrective No.
Date i
~g 4
js5 Event
~g Q
Action to g',
$5 5
gg Repori e in U H
.. vent Re'currence 6
r,~
07-03 810730 F
744 A
1 CJ llTEXCII Contint2ation of outage initiated during July. Shutdown for steam generator tube inspection and repair.
L ~
l 2
3 4
F: Forsed Reason :
Method:
Exlubit G - Instructions S: Scheduled A l'quipment Failure (Explain) 1-Manual for Preparation of tnia Il-Maintenance or Tese 2-Manual Ssram.
Entry Sheets for Lieersee C Refueling
- 3. Automatic Scram.
Event Report t LER) File (NUREG-D-Regularory Restriction 4-Other ( Explain) 0161) 1:-Operator Training & Ueense Examination F-Administratne 5
G-Operatioaal E:ror IExplain)
Eshibit !. Same Source P8/77)
Il-Other ( E splain) t e
Page 3 of 3 6
stVERACE DAILY UN!T POWER LEVEL 50-261 DOCKET SO.
II. B. Robinson Two UNIT 810902 DATE M. Watford COMPLETED BY (803) 383-4524 TELEPHONE August MONTI! --
DAY AVEn cr 9,yty pot.,rg te,...g DAY AVER AGE DTILY POWER LEVEL (5!We. Net )
(51We Net)
-13
-4 17
-8
-5 jg
-5 3
-7
-4 4
20
-6
-4 5
7j
-5
-4 6
22
~0
_g 7
-5
-14 24
-4 9
~
-21 10 y
-5
-21 1j 27
-5 12 l
-4
-23 29 1
-24 I4 30 f
-5
-23 1'
15 3,
-5 16 l
l l
l INSEUCTIONS On this format.!!st the ac ay daily umt power leve!in MWe Net for each day in the reporong month. Compute to l
the nearest whole rnq2wstt.
(9/77) l l
s; +
__