Monthly Operating Rept for Aug 1981
ML20010F898
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1981
From: Curtis C
GEORGIA POWER CO.
To:
Shared Package
ML20010F897 List:
References
NUDOCS 8109150090
Download: ML20010F898 (7)


Text

r71 NARRATIVE REPORT UNIT 1 August 3rd 1054 1A reactor feed pump turbine off to repair seal water line August 10th Unit auto scrammed on RPS trip at 1445 August lith Became critical at 0903. Unit auto scrammed due to IRM spike at 2352 August 12th Became critical at 0532. Tied to line at 1829 August 14th Unit Auto scrammed due to turbine stop valve fast closure at 0123. Critical at 0619. Unit tied to line at 1300 August 16th Power reduction to perform a Rod Pattern Adjustment at 1900 August 19th Decreased load due to Plant Service Water strainers stopping up at 2045 810915o090 a1091o gDRADOCK 05000321 PDR 1

7 '

s ,

HATCH 1 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR August 1981 I

NUMBER DATE COMPLETED DESCRIPTION 80-3925 8-24-81 Route conduit and cable to PSW-To-Air compressors electronic water heater 81-5680 8-09-81 Repair limit switch on outlet isolation valve to D/W pneumatic system. (P70-F005) 8-28-81 Perform work for DCR 80-279 80-5461 (Inte.ke Backfill) 81-1939 6-01-81 Replaced RHR Loop A Inboard Injection Valve Motor 6-02-81 Rerouted valve air line and 81-3489 relocated support per M.R.

8-03-81 Welded stud on disc and 81-5130 remachined to fit yoke of RHR S/W pump 81-5683 8-24-81 Fabricated RHR Service Water pipe j E11-ISH-H701. Level "E" support t

Housekeeping 81-5684 8-24-81 Fabricated RHR Service Water pipe support E11-ISH-H700. Level "E" Housekeeping 81-5686 8-24-81 Fabricated RHR Service Water pipe support E11-ISH-H702. Level "E" l

Housekeeping 81-4559 8-10-81 Replaced HPCI Steam Line Delta P instrument. (E41-N005) 81-4611 6-12-81 Replace ball and ball holder assembly on HPCI turbine i

6-10-81 Replace existing mechanical l 81-1498 snubber with PSA a snubber 81-1501 81-1503 (1L35) 81-1515 81-1517 l 81-1518 81-1519 i 81-1595 l 81-1596 81-1597 81-1598 '

Install foam fire sealant 81-1011 8-18-81 penetrations around all through gland seal treatment room walls 8-22-81 Rebuild PSW pump 1C 81-1626 81-4482 8-03-81 Repair corroded area on 30" diameter SW piping at intake structure Install new bearings in PSW 81-5375 7-22-81 pump 1C 8-20-81 Rebuild 1B PSW check valve 81-5868 (IP41-F311B) 5-29-81 Rel ocate ' local starter 1

81-2899 R27-S035, from torus to l

reactor b1dg. 130' elev.

Perform P/M on 125V Diesel 81-5534 8-17-81 Battery IC Install modified woodward 79-5566 1-06-81 Diesel 1C.

governor for (1R43-S001C) 8-10-81 Install cover over hole in 81-4048 b1dg. 130' elev.

reactor floor (T22) 81-2584 5-28-81 Pull cables to DW/ Torus vent exhaust valve a

DOCKET NO. _50-321 .

UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT NAME Itat.cn V-W-OL

_1 DATE G. M. Curtis COMPLETED BY REPORT MONTH Aur,ust TELEPilONE 912-367-7851 w.

5-r, v Cause & Corrective Date E.

.$?

pg 3;; 3.E g5 Licensee Event u E. b Action to No.

N g3 5 5 j;5 Report # E u? jd" Prevent Recurrence F 11.1 B 5 NA 01 IURB.IN [oad reduction to reoair.1A RFFf seal- i

'81-61 810803 aater line , l 3 NA IA XXXXX 4 . Auto Scram on RPS trip 81-62 810810 F 33.1 A IR IA INSTRU Rx. Auto Scram on IIE spike' 81-63 810811 F 18.6 H 3 1

H 5 MA IA It3TRU Recovery from scrart #. 81-63 i 81-64 810812 F 30. ')

i MA IM VAINEX Rx. Auto Scram due to 'Ibrbine stop valv e 81-65 810814 F 11.6 H 3 i

fast closure H 5 IM HA VAINEX Recovery from scram # 81-65 81-66 810814 F 54.0 5 In RB 00tm0D foad Reduction for RodTdttern Adjust-81-67 810816 S 52.0 B rent IR WA FIL'IER Power decrease due to stopped up PSW 81-68 810819 F 71.3 B 5 Strainers 3 4 1 2 Exhibit G Instructions Reason:

Method:

/. F: Forced 1. Manual for Preparation of Data S: Scheduled A Equipment' Failure (Explain) Entry Sheets for Licensee 2 Manual Scram.

B-Maintenance of Test Event Report (LER) File (NUREG-C-Refueling . 3 Automatic Scram.

4 -Continuations 0161)

D Regulatory Restriction E-Operator Training & Ucense Examination 5-Ioad Beduction 8 F-Administrative 9-Other (Explain) Exhibit I Same Soutw Goperational Error (Explain) *

(9/77) I!-Other (Explain)

> - 4

v --

o REFUELING INFORMATION FOR HATCH UNIT 1 Hatch Unit 1 is scheduled to shutdown on 4-2-82, for its next refueling outage. Startup from that outage is scheduled for 8-20-82.

Description of operation after refueling will require., a Technical Specification change concerning core thermal hydraulic limits.

No particular date for submit ting proposed licensing action and supporting information has been named. However, the latest date for submittal will be 5-20-82.

There are 560 fuel assemblies in the core and none presently in the spent fuel storage pool.

The present licensed spent fuel pool storage capacity is 3021 fuel assemblies. No requests for an increase in licensed storage capacity are anticipated in the near future.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity is 1996.

S 5

Georgia Poi

._ . . . . ._ __O_P_ E..F 9. T _I_N G 0 9 T A F E.P_D P T

- ~ ~ ~ - ' ~ ~~

--~' DOCKET H0. 50-321 - - ~ --

DATE 09-le-81'-~~~~-

~ - - ~ ~

CO RP Cf f EC BV~CM R ! S M . CURTIS

- ~ ~ - ~ - - ' - ~ ~ ~ ~ ~ - - -' - ~ ~ ~

~

_. - - - ~ T E LE_PH 0 H E~( 912_F 3_6 7 7 7 01 x 263 _

OPER4TlHG STsTU?, W *******************=***********************************

  • Notes

+

1. Usi t-Hane: E.I.Hotch Huclear Plant Unit 1 - ~ ~
3. R e5 ETnf P e FTo d i~6 6 -G l ~-' ~ *
  • 3 Ticensed Thernal Powhr (MWt)! 2 4 3 t> '-~ ~ ~ ~ ~ -~
4. Hsneple te' Ra t ing (Cr oss HWe): 909.3

~~

s. Design E I s cTUc al- R n't i6fT HFL'~ HW eTi 777 T~ *

-- ~ - - - - - - --- - ~~~--- '

6THailmun Dependable Capacity-(Cross ~ HWe >: 796.3 *

7. Maxinun bependdbli' Capacity-(Net HWe): 756 8-~ ~ ~~***************si+**i***++Ces+Cohe*********W4(s4C+We**s
6. If Changes Occur in CapacetfRatings ( I t eili'Run b er TTh ro u gh () Since Last Report, Give Hensonsi V. Power Level lo Which Kestricted, it Hny (Het IT W e ) 3
10. Reasons __ _For~Restrm__ ___ __ _ _'I t 5 h i- I T A n y .

~- - - - - - ~ ~ -

"This M~onth Tr7 to-Date C inill a tTv e

_~__

Hours In R e p sr tTE FP er T Bd .~ 4 4 5U71 4Av 11.

715. !' 3220.3 36732.'3

-- I 2THu mbe r ~ 0 f Ho u rs' R e ac to r Uns' Critical 00 0 ~~0

--IT Re d ct or~ R e se r Je ' Sh ut do wn Hobr s ~~ ~ 0:0

14. HouVi~Uenerat6r On-Line G8 0~ 7 2829.s 34273.9

- - - ~ 0J0 0 'J O ~ 0:0

--~15 Un~ I t R e s e r v e' ' S h u t d o w n H o u r s - - -~ ~~ ----

71541001

~I~6- Cr 6 s s' T her nd l Ene r gy ~ C e ne r a t ed ^( NWH ) - - - ' ~ '- ---'15 0 3 2 0 4 - - 5738119 4C777o IEE43Co zTTr40To 1(. G r o s's~ El ec tF7c61 EneFWl:enera te d7H6lH ) --

465622 1754091 z2006569

~ IET Ket ElectH cal'EnergtfCener~4ted (NWH)-~ - - ' - - - - - ----

4875 69 0

--- IT Un T E S e r vi c e ' Fa ct o r - - -~ ~ 91T5 v1.s 48.> 69.o zo. Unit Av iTrib i Ti Etj Fa ct 6r 2f -' Unit ~Cipscits Factor ~(Using NDC Het) - - 02 7 -397 58T5

~ 2 2- U n Th~~ C a p o~ci t y F a c t o r-( U s i'n g D E R N e t )

~ ~~- ~~~ -

80T5 38 7 3770

23. Unit For ced OutsgV Tal e- 8.> 17.I 19.9

~ 247 Sh' td6sni Schedule ~d O_ar- Hixt 6-Honths-(Type,_ _ _ _ _ _ . _ _ _ _ _ _ _

Dste, a n d D u r a tTo h-'6 f Ei cfDT

. _ ~ _ . . _ . _ _ _ . _ _ _

25. IF Siiut~ 5own~'At End'0j Report PeFTodIEstTnated"Date of SEsr' tup:

2 6-~~U n i t s l~n Tist Stitus'TPrior to C6snirEiil~0perstT5rD: ,_

- T5 Feta st - Achieved--

!HITIAL CRITICAllTV ...____________ _____ .________

lHITIAL ELECTRICITY .____ ________.

COMMERflnL OPERATT6H .._____________

N f(()

r

I l lll lj] l l l\l lI1 ll1 t

P o

  • i a , '

g r

o e

G

~

~

_ ~ ~

~~ -

~~ ~ i

- 3 _

L ~~ T

o. -

E ~ e

~~ - 7 .

2 ._ " V-

~

1

> L _ -

~~ - 9

~

~

c _

E_

~

S - ~ .

I 1 . _. ~ R _ -

^ .

~ -

T 8 _. -- E. ~ ~ ' _

Wy

~

~

~

~ _ .

P7 _

U7 . O

~ ~ _

- ~ .

- _ e C - _

P -

m 7 6 . <. 293683, 447437 I c.

Y 90 . 961 555755F45 ( 77 < 77 _

BM3. L 5 6357777 1 :

20S1 I

A

. ~ ~ - _

~~

31 I 2 .

- - F1 .

D

~

~~

L E o ? H 9 ._

  • , 0 C r

'E C .

~ -

p q

V - A. ~ - ~

E EYE.

R-L DTEH E_ _. ~~

~

HA 0 V_ -

~ ~ ~

DDH_ _

~

F -

E W

T ~

EP . 'A-

. ~ -

~ - _ _

O E~

r T EL E. _. ' - ~~ . '

v01 P C- LE. ~ Y.. 70901 2345678 _

O PT A 1 1 1 222 222 222 E33~

~

i D M ~~ D ~

l O _ ~

C H

_ U ~

Y L - ~

L I ~

A - E ~

V

_ D ~

_ - E -~

-- ~

E

_ G A

T N

~

~

R E -

E ~ D -

V o A P . -

705f 08 - s8 6e6 949 0 V__

56645454 5l F358 4 L . 776777 77 4 - 41 5 6

- - I

- W D

E .

G e

1 T 8 R .

2 E 8 V A

0 H

T l

Y 1 2 3 4 5 6 7. e 01 2 44 s6 l

0 A 1F1 1 Ti1 M D jlj jllljlllll