ML20010F784

From kanterella
Jump to navigation Jump to search
Suppl & Addendum to Final Deficiency Rept Re Reactor Pressure Vessel Shroud Head & Moisture Separator Assembly Fire,Initially Reported on 800613.Assembly Cleaned Up by 810731 & Placed in Storage on 810711.Next Rept by 820107
ML20010F784
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 09/03/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NCR-PBNP-106, NRC-PBNP-106, NUDOCS 8109110327
Download: ML20010F784 (2)


Text

.

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374C1 400 Chestnut Street Tower II U

iL?. } J September 3, 1981

,[

\\

R>

(-

Mr. James P. C'Reilly, Director

['

k 9\\

Office of Inspection and Enforcement q-OLP],OJgglg 8, U.S. Nuclear Regulatory Commissi n Region II - Suite 3100 u%

101 Marietta Street 1,.

  • * %us A

Atlanta, Georgia 30?03 94

Dear Mr. O'Peilly:

N PHIPPS BEND NUCLEAR PLANT UNIT 1 - REPORTABLE DEFICIENCY - RPV SHROUD HEAD AND MOISTURE SEPARATOR ASSEMBLY FIRE (NCR PBNP-106)

Initial notification of the subject deficiency was made to NRC-01E, Region II, Inspector R. W. WriFht on June 13, 1980. The final report was submitted on December 19, 1980. As requested in Phipps Bend Inspection Report Nos. 50-553/81-01 and 50-554/81-01, and as committed to in my letter to you dated May 21, 1981, we are enclosing a followup report on our cleanup actions to date. TVA anticipates transmitting additional information on er before January 7, 1982.

If you have any questions regarding this subject, please call Jim Domer at FTS 857-2014.

Very trulv yours, TENNESSEE VALLEY AUTHORITY LN1 DIM g O st<.

L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc:

Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 gp1 8109110327 810903 PDR ADOCK 05000553 gi S

PDR An Equal Opportunity Employer

  • o At ENCLOSURE PHIPPS BEND NUCLEAR PLANT UNIT 1 hEACTOR PRESSU3E VESSEL SHROUD HEAD AND MOISTURE SEPARATOR ASSEMBLY FIRE 10CFR50.55(e) REPORT NO. 5 SUPPLEMENT AND ADDENDUM TO FINAL NCR PBNP - 106 The General Electric Company started the cleanup operation of the unit 1 shroud head assembly on February 24, 1981, and completed the acti *ity or.

July 31, 1981, which met _the commitment made in Report No.4 The shro d head assembly will remain in the facility erected for the clean"r operation and, at least for the present, will not be relocated t'or storage purposes. General Electric personnel in Atlanta are reviewing documentation generated during the cleanup operation which will be forwarded to VSL and then to TVA.

The unit 2 shroud head assembly was received at Phipps Bend and placed in storage on July 11, 1981. There were no problems experienced with the unit 2 shroud head move.

Nonconformance report (NCR) PBNP-106 and Quality Control Investigation Report (QCIR) 21033 were closed on August 11, 1981. No further actions are required. TVA anticipates supplying you with additional information regarding GE's documentation review on or before January 7, 1982.

i I

l l

I