Interim Deficiency Rept Re Weld fit-ups for Safety Class Control Rod Drive Piping.Addl Time Required to Complete Engineering Analysis Described in Previous Rept.Final Rept to Be Submitted by 811207
ML20010F623
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/01/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8109100459
Download: ML20010F623 (1)


Text

_ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5 1 3 Tj p

a r sis rbh,pi- : 3 *O t j L.

N!',

i - Ld 6i( } l i'l R I i t ip; U bb+r4!,) q! ii U i i iltv {C

" a L L ;f

  • g i

i 3

,p e

e L

f t ti U P O. BOX 5000 e CLEVELAND, OHlo 44101 e TELEPHONE (216) 6A?-9800 e ILLUMINATING BLDG.

e 55 PUBLICSOUARE "9

C I' " '" # #

  1. I'0" Dalwyn R. Davidson VICE PRESIDE NT SYSTEM ENG!NLERING AND CONSTRUCTION September 1, 1981 p

p F 1 b

M-g A

Mr. James G. Keppler y

I)L, y J,h e

Director of Region III C,,,-. 0 9 % = Dg e

g Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission i ) WA g, y can 799 Roosevelt Road Glen Ellyn, Illinois 60137

{

~.

RE:

Perry Nuclear Power Plat M

Docket Nos. 50 /,40; 50-441 Significant neiiciency on Socket Weld Fit-Ups for Safety Class CRD Piping

[RDC 29(81)]

Dear Mr. Keppler:

The Interim Report regarding subject significant deficiency states that the final report is scheduled to be submitted to your office by September 1, 1981.

As discussed with Mr. J. H. Neilson of your office on August 27, 1981, additional time is required to complete the engineering analysis described in the Interim Report.

It is now projected that this evaluation will be completed in three months and that our final report can then be submitted by December 7, 1981.

If you have any questions, please do not hesitate to call.

Very truly yours, aldf Dalwyn R. Davidson Vice President System Engineering and Construction DRD:pab cc: NRC Resident Inspector, PNPP Mr. Victor Stello, Diiector f

Office of Inspection and Enforcement

((Of U.S. Nuclear Regulatory Commission I()

Washington, D.C 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 sto91oo459 B10901 SEP-2 1981-PDR ADOCK 05000440 S

PDR