h, Portland General Electric Company Trojan Nuclear Plant P.O. Bos 439 gy,j.. ;
Rainier, Oregon 97048 (503)556-3713 August 21, 1981 CPY-627-81 Mr. R. H. Engelken, Director U.S. Nuclear Regulatory Commission, Region V 1990 North California Blvd.
Walnut Creek, CA 94596
Dear Mr. Engelken:
This is a follow-up report on my earlier letter, CPY-533-81, dated July 28, 1981.
During the hydrostatic test of the relocated fire hydrant, a pipe joint separated. Additional work is required before the system is returned to an operational status. We are maintaining the alter-nate fire protection action identified in my July 28 letter.
Fire hydrant No. 4 and its associated piping will be returned to service by August 28, 1981.
Sincerely, C. P. Yundt General Manager CPY/CA0/RQR:na Att,chment 6
c:
D. J. Broehl B. D. Withere 1F f*
i O
h g"
R. L. Sullivan ig]. SEP 101981* g W. S. Orser C. F. Marpe seen m es Shift Supervisors g-
- ,, g a'""
f,8 CD8"*
LER Distribution S. G. Banton N
N.
Mr. Lynn Frank, DOE
/
.b h,@N/
8109100437 810821 PDR ADOCK 05000344 4 y\\
F pyg
m m
\\
Portland General Electric Company Trojan Nuclear Plant P.O. Bos 439 July 28, 1981 Rainier, Oregon 97048 CPY-53 b81 (503)556-3713 Mr. R. H. Engelken. Director U.S. Nuclear Regulatory Co: mission, region V 1990 North California Blvd.
Walnut Creek, CA 94596
Dear Sir:
Pursuant to Action paragraph 3.7.S.I.c, the following information is provided.
During system modification, Trojan's Fire Suppression System will not meet operability requirecents as defined in paragraph 3.7.8.1.c.
RDC 80-040, DCP 8, requires fire hydrant No. 4 to be relocated in order to maintain a dependable water supply after temporary on-site construction of the Technical Support Center.
Alternate fire protection for the areas covered during modification are as follows:
1.
Warehouse a.
No smoking throughout warehouse.
b.
Establish a roving fire watch every hour.
2.
Transformers a.
Run. a fire hose f rom fire hydrant No. 6 to the transformer area.
3.
Steam generator feed pu=p lube oil reservoirs a.
Run a fire hose from hose station No. S to the lube oil reservoir area.
4.
Emergency diesel generators (Sprinkler Systems A & B) a.
Run a jumper hose f rom the sprinkler drain to fire hose station No. 5.
b.
Establish a continuous fire watch for the emergency diesel generators.
The No. 4 fire hydrant will be placed out of service on August 3, 1981, and be returned to service by August 21, 1981.
Sincerely, JL C. P. Yundt General Manager dh CPY/CA0/ QR:bb c: