05000315/LER-1981-026, Forwards LER 81-026/99T-0

From kanterella
(Redirected from ML20010F592)
Jump to navigation Jump to search
Forwards LER 81-026/99T-0
ML20010F592
Person / Time
Site: Cook 
Issue date: 08/11/1981
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20010F593 List:
References
NUDOCS 8109100399
Download: ML20010F592 (1)


LER-1981-026, Forwards LER 81-026/99T-0
Event date:
Report date:
3151981026R00 - NRC Website

text

Dmdf/2E L ]h** INDIANA & MICHIGAN ELECTRIC CCMPA T

DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 August 11, 1981 Mr. J.G. Keppler, Reg'onal Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III

/

799 Roosevelt Road 1

Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

Pursuant to the requirements of the Appendix A Technical Specifications the following report /s are submitted:

R0 81-026/99T-0.

Sincerely, l

u D.V. Shaller g.

Plant Manager T. ' 2 0 1931

  • i(

\\$

/

/bab cc:

J.E. Dolan

/'

c' R.S. Hunter

'drujj f R.W. Jurgensen R.F. Kroeger K.J. Vehstedt E. Swanson/N. DuBry R0:III R.C. Callen MPSC

} g-),

G. Charnoff, Esq.

e I

J.M. Hennigan W. Lavallee EPRI rq g

)h

/ I PNSRC J F. Stietzel ai

'.u

~8 l

E.L. Town 1ey Dir., IE (40 copies)

E-SEP 0 91981 m A Dir., MIPC (4 copies) hs "W W

8109100399 810811

/,/

h PDR ADOCK 05000315 N

S PDR 4G 14 S'"