Forwards IE Insp Rept 50-301/81-16 on 810804-05.No Noncompliance Noted
ML20010F345
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/28/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20010F347 List:
References
NUDOCS 8109100066
Download: ML20010F345 (2)


See also: IR 05000301/1981016

Text

-

,

)

AUG 2 8 1991,

sn

%

%

Docket No. 50-301

I

.

Wisconsin Electric Power Company

60

-

~~

'

ATTN:

Mr. Sol-Burstein

E

@

'

Executive Vice President

'

Power Plants

%

231 West Michigan

16

Milwaukee, k'I

53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

D. L. Robinson and J. B. Hopkins of this office on August 4-5, 1981, of

activities at the Point Beach Nuclear Plant, Unit 2, authorized by NRC

Operating License No. DPR-27 and to the discussion of our findings with

Mr. G. A. Reed and others of your staff at the conclusion ot the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CER 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under-10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days 'from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date'of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which-are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

f S:t

'

.

I

8109100066 810828

'

{DRADOCK 05000301

PDR

L

-

_

..

.-

_

w-

,

.

,

,

AUG

'

2 0 1981

Wisconsin Electric Power-

-2-

Company

. , . .

~

.

in 10 CFR 2.790(b)(4). The inforsation sought to be withheld.shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Roam.

T

  • We will gladly discuss any questions you have concerning this inspection.

Sincerely,

t

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report Na. 50-301/81-16

l

cc w/ encl:

G. A. Reed, Manager

'DMB/ Document Control Desk (RIDS)

Resident' Inspector, RIII

l

John J. Duffy, Chief

l

Boiler Inspector

!

Peter Anderson, Wisconsin's

Environmental Decade

L

Stanley York, Chairman

Public Service Commission

,

,

L

i

-

<

l

-

!

-

i. '

l-

I-

l

t

!

'

'RIII

RIII

Rill

R*I

RIII-

!

\\

hso . :-

kins

tus

c iw

a

i

11 s

.

.

Ro i

'8/19/81

.

JF .

S' 2T

,

y

.

V

.

'

s.

. . .

-

-

-

,,

,r

-

.-e

,

, ---, - ,--

a

e e