AUG 2 8 1991,
sn
%
%
Docket No. 50-301
I
.
Wisconsin Electric Power Company
60
-
~~
'
ATTN:
Mr. Sol-Burstein
E
@
'
Executive Vice President
'
Power Plants
%
231 West Michigan
16
Milwaukee, k'I
53201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
D. L. Robinson and J. B. Hopkins of this office on August 4-5, 1981, of
activities at the Point Beach Nuclear Plant, Unit 2, authorized by NRC
Operating License No. DPR-27 and to the discussion of our findings with
Mr. G. A. Reed and others of your staff at the conclusion ot the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CER 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under-10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days 'from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date'of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which-are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
f S:t
'
.
I
8109100066 810828
'
{DRADOCK 05000301
L
-
_
..
.-
_
w-
,
.
,
,
AUG
'
2 0 1981
Wisconsin Electric Power-
-2-
Company
. , . .
~
.
in 10 CFR 2.790(b)(4). The inforsation sought to be withheld.shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Roam.
T
- We will gladly discuss any questions you have concerning this inspection.
Sincerely,
t
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report Na. 50-301/81-16
l
cc w/ encl:
G. A. Reed, Manager
'DMB/ Document Control Desk (RIDS)
Resident' Inspector, RIII
l
John J. Duffy, Chief
l
Boiler Inspector
!
Peter Anderson, Wisconsin's
Environmental Decade
L
Stanley York, Chairman
Public Service Commission
,
,
L
i
-
<
l
-
!
-
i. '
l-
I-
l
t
!
'
'RIII
RIII
Rill
R*I
RIII-
!
\\
hso . :-
kins
tus
c iw
a
i
11 s
.
.
Ro i
'8/19/81
.
JF .
S' 2T
,
y
.
V
.
'
s.
. . .
-
-
-
,,
,r
-
.-e
,
, ---, - ,--
a
e e