ML20010F326
| ML20010F326 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/28/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20010F327 | List: |
| References | |
| NUDOCS 8109100044 | |
| Download: ML20010F326 (2) | |
See also: IR 05000341/1981010
Text
1
..
.
AUG 2 81981
f"
h <@
O
m-
&
6.5
)
SEP 09 885 ;g
'
[.
Docket No. 50-341
ma
The Detroit Edison Company
'b
/f
ATTN:
Mr. Donald li. Wells
4
,
Manager, Quality Assurance
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. B. H. Little
and P. M. Byron of this office on July 1-31, 1981, of activities at Enrico
Fermi, Unit 2, authorized by NRC Construction Permit No. CPPR-87 and to the
discussion of our findings with Mr. W. Fahrner at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, obseivations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter .a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
,
5r i
J109100044 810828
PDR ADOCK 05000341
.
O
t
_
.
_ . .
O
O
The Detroit Edison Company
-2-
a' full statement of the reasons which are tue bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard with!n the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in'the Public Document Room.
-We will gladly discuss any questions you have concerning t.his inspection.
Sincerely,
ecd &
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
IE Inspection
Report No. 50-341/81-10
cc w/ enc 1:
DMB/ Document Control Desk (RIOS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Eugene B. Thomas, Jr.,
Attorney
RIII
/
RII
RI
RI
RIII TC[(
[CA
J
L
n in
Knop
Spessard
/p
7/81
7
g/S(
/
'
1
.,