Requests Extension Until 811030 for Response to NRC 810717 Request for Addl Info Re Degraded Grid Voltage.Mod to Second Level Undervoltage Protection Sys Cannot Be Completed During Fall 1981 Outage
ML20010F216
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/28/1981
From: Cross W
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
3--3-A-3, 3-0-3-A-3, NUDOCS 8109090504
Download: ML20010F216 (2)


Text

,

)

ffY((gw%a G

q%g

@Ty C?g g%,Qb GMv7 Florida Pow m......e.r p

yt (#7) sd sti>

Q~

August 28, 1981 gbII T

File:

3-0-3-a-3

  1. 3-081-28 C

1 Mr. John F. Stolz, Chief Operating Reactors Branch #4 y

Division of Licensing 9

U.S. Iluclear Regulatory Conmission 4

49 Washington, D.C.

20555

Subject:

Crystal River Unit 3 Docket !!o. 50-302 Operating License flo. DPR-72 flRC Letter, dated July 17, 1981, Requesting Addit 4.onal Informa-tion on Degraded Grid Voltage

Dear Mr. Stolz:

On July 22, 1981, Florida Power Corporation (FPC) received the subject letter requesting additional infomation on the issue of Degraded Grid Voltage.

Your letter requested FPC to provide additional information on the design of our Second Level Undervoltage Protection for Crystal River Unit 3 by August 31, 1981.

This letter is being submitted to request an extension to the 45-day sub-mittal and the installation schedule.

Since receipt of this letter, FPC has been working with Gilbert Associates, Inc. (GAI) on the required 45-day sutmittal.

A review of your questions in detail caused us tc. note a discrepancy in the proposed design of our system.

It will take GAI approximately sixty (60) days to revise the calculations, rework the undervoltage design package, and develop the required response to the NRC questions.

Therefore, our response to the subject letter will be submitted on or before October 30, 1981.

In addition, FPC previously cocmitted to comple'w the modification of the Second Level Undervoltage Protection during the Fall 1981 refueling outage.

Due to the redesign of the Undervoltage Protection System for the above reasons and the fact that all material is not available at this time for installation, this system cannot be installed during the Fall 1981 outage.

Therefore, FPC requests an extension on the ir:tallation schedule.

FPC will provide the actua' Distallation schedule in tt3 aforementioned October 30, 1981, submittal.

8109090504 810828

./

PDR ADOCK 05000302

  • OP P

PDR

,l 6l 0-General Office 3201 inirty fourtn street soutn. P O Box 14042, St Petersburg. Fionda 33733 e 813-866 5151

"r g:

~

4 Mr. John F. Stolz-~:

August.28, 1981

-Page 2:

Shduld you ' have any ' questions concerning _ this letter, please contact - this '

- office..

-Very truly yours, QL d. G William A.-' Cross' Manager

. Nuclear Licensing WGL:m --

-.