Forwards Addl Responses to IE Insp Repts 50-369/80-38, 50-370/80-20,50-369/80-33 & 50-370/80-18,per Agreement W/Nrc at Exit Interview on 810806
ML20010F189
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/12/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8109090475
Download: ML20010F189 (2)


Text

m-

.b

.o q

e r.: -a e

s Duxu Powen COMPANY,,.

Powru Uuimswo

.i' l

'. " ' V 422 Souris Cstteucu Srnent, CnAnwire, N. C. ana.sa 2

b ! [id b l 7

^

/

wituam o. eAnnen.sn.

Vict Pat $sDfNT ICLEPHONE Ant 04 svf. Paeoverio.

August 12, 1981 27 4o83 4

9 Mr. James P. O'Reilly, Director p

U. S. Nuclear Regulatory Commission y

Region 11 j

U SCp08 g7b, 101 Marietta Street. Suite 3100 m

,g

/

Atlanta, Georgia 30303

{- S R

.$g//

Subject:

McGuire Nuclear Statio'n N

Docket Nos. 50-369 and 50-370

/cled i i

's

Reference:

RII:ARH/CRM 50-369/80-38, 50-370/80-20 Itemc 7a (LII 50-369/80-33-02, 50-370/80-18-02) and 9 (URI 50-369/80-38-05, 50-370/80-20-04) 50-369/80-33, 50-370/80-18 Item 7c (LII 50-369/30-33-02, 50-370/80-18-02)

Dear Mr. Reilly:

Per our agreement at the exit interview with Mr. L. E. Foster of your office on 8/6/81, please find attached additional responses to items identified in the above referenced inspection reports. We hope these additional resporaes will aid in closing out thece items.

Very'truly yours.i b d 43. l c

O.

William O. Parker, Jr.

PBN:dsg Attachment cc:

Mr. Lawrence E. Foster U. S. Nuclear Regulatory Commission Region Il 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

<, i E

i D109090478 810901 PDR ADOCK 05000219 S

PDR

.rv

.-*}

_ jr ~

-.p.

A 9a o

McGuire Nuclear Station

-Additional Response to IE Inspection ~ Reports 50-369/80-38, 50-370/80-20 and 50-369/80-33, 50-370/80-18 LII 50-369/80-33-02, 50-370/80-18-02 (Item 7a):

"...and maintain a list of supports / restraints which show the current loads."

.(Reference text from 50-369/80-38,50-370/80-20, Item 7a)

Response

Duke is not maintaining a specific list to control the load / sketch mismatch problem..Instead..we have corrected all affected sketches to include actual loads oj; conservative, higher loads. This method is more effective since it eliminates possible. cross-referencing errors.

URI 50-369/80-38-05, 50-370/80-20-04 (Item 9):

Differences noted on EDS problem numbers 0920-202-NV-21 Rev 1 and 0920-301-LD-301 Rev 2.

. Response Duke has verified the correction of all four differences noted in Unresolved Item No. 50-369/80-38-05,'50-370/80-20-04. Additionally, procedures have been changed at Duke and EDS to preclude future occurrences.