ML20010F170

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-054/03L-0 & 81-055/03L-0
Date released: 01/24/2020 Download: ML20010F170


LER 81-055/03L-0:on 810728,during Review of Monthly Surveillance Schedule,Determined That Surveillance Test FNP-1-STP-227.1B Had Not Been Performed for Apr,May or June. Caused by Error in Scheduling
ML20010F175
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010F175 (2)
LER 81-054/03L-0:on 810730,instrument Channel N-43 Was Declared Inoperable When High Flux Trip Setpoint Exceeded Acceptance Criteria.Caused by Setpoint Drift.Trip Setpoint Reset
ML20010F173
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010F173 (1)
Forwards LERs 81-054/03L-0 & 81-055/03L-0
ML20010F169
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010F169 (1)