ML20010F009
| ML20010F009 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 08/17/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20010F010 | List: |
| References | |
| NUDOCS 8109090264 | |
| Download: ML20010F009 (2) | |
See also: IR 05000395/1981020
Text
r
C .$
2//g
Q
AUG 171981
'
.
%
g
(@' {'r
[
4
South Carolina Electric and Gas Company
ATTN: Mr. T. C. Nichols, Jr., Vice President
,
.-
.
7g
Power Production and System Operations
'f.j SEP 0 91981
P. O. Box 764
-
Columbia, SC 29218
d' u.a.eunas#
)
Gentlemen:
N
a
%
b
Subject:
Report No. 50-395/81-20
This refers to the routine safety inspection conducted by Mr. J. L. Skolds of
this office on July 1-31, 1981, of activities authorized by NRC Licensee No.
CPPR-94 for the V. C. Summer facility and to the discussion of our findings held
with Mr. O. S. Bradham at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
i
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordarce with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
,
If the report contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this office
by telephone within ten days from the date of this letter of your ? itention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such informa-
l
'
tion.
If your r::aipt of this letter has been delayed such that less than seven
days are availaE;e for your review, please notify this office'promptly so that a
new due date ma, be established.
Consistent with section 2.790(b)(1), such
application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,-
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
The information sought to be withheld shall be incorporated
a; far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within tFe specified periods noted above, the report will be
placed in the Public Document Room.
8109090264 810817
1
DRADCCK05000g
g#f
n
j
- -
! * -pl , .
. South Carolina Electric & Gas Company
2'
$OO-l'/l9g)
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
hCt '/.s
Paul J. Kellogg, Branch Chief
Reactor Projects Branch 2, Division
of Resident and Reactor Project Inspection
Enclosure:
Inspection Report No. 50-392/81-20
cc w/ encl:
J. B. Knotts, Jr.
A. A. Smith, Site QA Coordinator
0. S. Bradham, Manager
Nuclear Operations
bcc w/ enc 1:
NRC Resident Inspector
Document 11anagement Branch
State of South Carolina
'
RII,:
1
RII:R
RI
JLS old
r
-VLB ownlee
/
PJKellogg
8/1T81
8/g/81
8
81
?
I
,
'
%
e
1
i
e