Forwards FSAR Changes Re Operability of Containment Purge Isolation Valves,In Response to NRC Request for Addl Info
ML20010E591
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/31/1981
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SLNRC-81-079, SLNRC-81-79, NUDOCS 8109080012
Download: ML20010E591 (2)


Text

. . ' . . ,

  • SNUPPS Standardized Nucieer Unit Power Pfent System 5 Choke Cherry Road Nicholas A. Petrick Rockville. Maryland 20850 Executive Director (301)8694010 August 31, 1981 SLNRC 81-079 FILE: 0541 SUPJ: EQB/CSB Review Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket Nos.: STN 50-482, STN 50-483, and STN 50-486

Dear Mr. Denton:

i In discussions with Dr. Gordon Edison, NRC project manager for the SNUPPS applications, it was learned that additional information was required in order for the Equipment Qualification Branch and the Containment Systems Branch to complete their reviews of the SNUPPS FSAR. This information concerned the operability of containment purge isolation valves. The attached FSAR change provides the re-quested information and will be incorporated in the next revision to the SNUPPS FSAR.

i Very truly yours, 4MtCk Nicholas A. Petrick i RLS/dck/3a13 og D4

Enclosure:

FSAR p. 18.2-39 N' l g f -

[ cc: J. K. Bryan G. L. Koester KGE UE O 6L(U L -

l D. T. McPhee KCPL 9 S E I' O pc*

4 W ' ;--

W. A. Hansen NRC/ Cal k,,\ u.s.TjSo" -]

T. E. Vandel NRC/WC r [

9 [TW ' O}

s

/ l 8109080012 810831 PDR ADOCK 05000482 A PDR

L, SNUPPS \

wh The lines supplying component cooling water to equipment inside the containment is isolated by CIS-B. A CIS-B is initiated by

\ high containment pressure (Hi-3 ) . It is not diverse, but is initiated only after initiation of a containment spray actuation,

'hich does utilize diversity. The CIS-B is shown on Figure 7.2-1, Sheet 8.

t The containment purge system will be isolated upon initiation of a containment purge isolation signal (CPIS). The diverse parameters sensed to initiate a CPIS are high containment radiation level and high containment purge exhaust radiation level,.or a CIS-A signal. The CPIS logic is shown in Figure 7.3-1," Sheet 2.

All containment isolation valves are provided with control switches on the main control board. Manual actuation switches are provided for initiation of CIS-A, SLIS, and CPIS. In addition to diversity, these systems are redundant and eet safety-grade (Class lE) criteria.

18.2.11.4 Conclusion The design for the containment isolation system satisfies the requirements of Item II .E.4.2 of NUREG-0737.

v' he, o p.ch.h 4- cAemsA peg, is.kb v s% s , Mbt Lm 4.st 7kJ 7 6 ,%

hu % ssa ht% Ac4d b msA NRc- c.nbrt ~ .

Doc.wmvJ-d,b d. oy=rJoNs wth bs ycov.' A s.&

d \ ss4 b e- mm%s ye o<- 4. ks.\ lewd k A M %st-sN SNw?PS Mk . IC- A hKC is n.4 sdthd u 4%. -\b Ateski-dd opu sk'\E' k h?Ps pas wM %d b S4dC TcA s ie Wh 2. Oc.N.L.n., ts,,1979 ad unes_sk e; c.Nd ogu sk3 w'. h b s Asmab\d 1 b_ MesN et.b sb46%

k pe gs,. g%m iso \oeb va\vu w:\\ m\

N.  %

se c,.z . 4 , h a. s. % L;g 9tmbJ) wL:% \ , 7 , 3., uL 4.

O 18.2-39 Rev.k Y81